|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools |
Rating:
|
Display Modes |
|
#12
|
|||||
|
|||||
|
Re: Why do we bother bagging?
I wonder if team size correlates with attitude about the Stop Build Deadline. Larger teams can have more students actively involved with building a robot if they build two of them. Smaller teams might lack the manpower to build a practice robot before bag day. I'm just not sure how best to craft a survey in order to get useful data.
|
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|