Re: Pre-charging pneumatic system
1 PSI per minute is a bit high. 10 PSI per minute is cause for panic!
Make up a weak solution of soapy water and paint it onto each and every fitting. Bubbles will point to the leaks very quickly. |
|
#2
|
||||
|
||||
|
Re: Pre-charging pneumatic system
Ouch! I didn't realize how bad that is! I will definitely be pushing for curing those leaks during our robot access period. Thanks everyone!
|
|
#3
|
||||
|
||||
|
Re: Pre-charging pneumatic system
When I teach a team new to pneumatics, I emphasize that each component should be leak checked extensively before installing it on the robot. I know that this advice is a bit late for your 2014 robot, but it has helped out team immensely over the years. As we typically check each component a week or two prior to installation, final installation is typically a function of hooking up the hoses, and doing a final pressure check.
|
|
#4
|
||||
|
||||
|
Re: Pre-charging pneumatic system
One very common place that many teams overlook is the Festo screw in fittings that seem just impossible to make tight from the outside. The trick is to insert the correct size metric allen key into the fitting to allow you tighten the fitting to the body.
|
![]() |