Go to Post Screws come even smaller, #0000 - 160 at Small Parts.They're about $4 each, and made by elves. - DonRotolo [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rating: Thread Rating: 2 votes, 5.00 average. Display Modes
  #1   Spotlight this post!  
Unread 08-05-2014, 08:07
Foster Foster is offline
Engineering Program Management
VRC #8081 (STEMRobotics)
Team Role: Mentor
 
Join Date: Jul 2007
Rookie Year: 2005
Location: Delaware
Posts: 1,393
Foster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond repute
What are the correct terms for linkages and lifts

In the past I've built robots that have an arm made of 4 pieces of metal that form a parallelogram. The right side is fixed, and as the arm is raised the left side moves up, but stays parallel to the right side.

I've used the term 4 bar lift for this, but have heard others write/say "4 bar linkage". While I agree it's a 4 bar linkage, it is a single case. 4 bar linkages can have each bar be a different length. With different lengths, the motion is quite different. Which term is correct, or is there a better term / phrase to use.

Moving on to 6 bar linkages. When I Google these, an entire universe of really cool motion possibilities is shown. I've built 6 bar lifts, where it's two parallelogram 4 bar lifts superimposed over each other (the left vertical bar is the right vertical bar of the next linkage, the upper bar becomes the lower bar in the next linkage).

Lets go back to 4 bar for a second. There is a set of lifts where the bars cross (make an X). You see these in "high lift platforms". I've heard these referred to as "4 bar lifts" or in some cases 8 bar lifts, since there are 4 bars on each side. But then I've heard that stacking them makes that an 8 bar lift. And more stacking is a 12 bar lift.

So I'm looking for a little terminology help here. I'd like to be using the right terms (that mentor thing) to be understood / understand what others are trying to tell me.

I'm good if we limit these to moving in the same plane. I was watching a video of a "4 bar linkage" where the points can move in 3 dimensions and that appears to open up a much bigger can of worms.
__________________
Foster - VEX Delaware - 17 teams -- Chief Roboteer STEMRobotics.org
2010 - Mentor of the Year - VEX Clean Sweep World Championship
2006-2016, a decade of doing VEX, time really flies while having fun
Downingtown Area Robotics Web site and VEXMen Team Site come see what we can do for you.
Reply With Quote
  #2   Spotlight this post!  
Unread 08-05-2014, 08:22
TheKeeg's Avatar
TheKeeg TheKeeg is offline
Michigan Tech Engineering
AKA: Keegan Harrington
FRC #0068 (Truck Town Thunder)
Team Role: College Student
 
Join Date: Jun 2012
Rookie Year: 2013
Location: Ortonville, Michigan
Posts: 77
TheKeeg has much to be proud ofTheKeeg has much to be proud ofTheKeeg has much to be proud ofTheKeeg has much to be proud ofTheKeeg has much to be proud ofTheKeeg has much to be proud ofTheKeeg has much to be proud ofTheKeeg has much to be proud ofTheKeeg has much to be proud of
Re: What are the correct terms for linkages and lifts

I always refer to it as a 4-6 bar linkage. Not all linkages are built to "lift" so I would stick with calling it a linkage.


The "X" lift you are talking about sounds like a scissor lift.
__________________

Keegan Harrington
Truck Town Thunder
2013-2014: Mechanical Design

"Infinity: you empty out all of the coffee and there is still more orange juice"
Reply With Quote
  #3   Spotlight this post!  
Unread 08-05-2014, 08:32
ASmith1675's Avatar
ASmith1675 ASmith1675 is offline
Mechanical/Electrical/Scouting
AKA: Adam Smith
FRC #1675 (Ultimate Protection Squad)
Team Role: Engineer
 
Join Date: Jan 2008
Rookie Year: 2005
Location: Milwaukee, WI
Posts: 48
ASmith1675 is a splendid one to beholdASmith1675 is a splendid one to beholdASmith1675 is a splendid one to beholdASmith1675 is a splendid one to beholdASmith1675 is a splendid one to beholdASmith1675 is a splendid one to beholdASmith1675 is a splendid one to beholdASmith1675 is a splendid one to behold
Re: What are the correct terms for linkages and lifts

When first refers to a "4-bar" or "4-bar linkage" they typically are referring to the system you described, where one side moves parallel with respected to the fixed side. Like you mentioned, this is only one particular case of a 4-bar linkage. The lengths and orientations of the bars and pivots can be adjusted to create a wide range of motion.

If you are interested, you can do some research on Kinematics (I took two full quarters of classes in college on this topic), and specifically 2 and 3-position synthesis. These are design problems where you specify 2 positions of motion and determine the lengths and mounting of the other links.


The "stacked 4-bars" you are referring to are known as scissor lifts. They seem like a simple concept, but can be very difficult to execute well. They require a high degree of precision as the links need to lie in the same planes as well as have the same lengths to prevent the lift from leaning.

Hopefully this answered some of your questions.
Reply With Quote
  #4   Spotlight this post!  
Unread 08-05-2014, 11:44
Chowmaster4695 Chowmaster4695 is offline
Lathe Master
AKA: Jerry Wright
FRC #4695
Team Role: Tactician
 
Join Date: Feb 2014
Rookie Year: 2001
Location: Chowchilla
Posts: 40
Chowmaster4695 has a reputation beyond reputeChowmaster4695 has a reputation beyond reputeChowmaster4695 has a reputation beyond reputeChowmaster4695 has a reputation beyond reputeChowmaster4695 has a reputation beyond reputeChowmaster4695 has a reputation beyond reputeChowmaster4695 has a reputation beyond reputeChowmaster4695 has a reputation beyond reputeChowmaster4695 has a reputation beyond reputeChowmaster4695 has a reputation beyond reputeChowmaster4695 has a reputation beyond repute
Re: What are the correct terms for linkages and lifts

I'd like to point out that fore-bar linkages need not nessacarily have 4 bars.
Reply With Quote
  #5   Spotlight this post!  
Unread 08-05-2014, 12:35
JeremyLansing's Avatar
JeremyLansing JeremyLansing is offline
Team 967 Alumni
FRC #0171 (Cheese Curd Herd)
Team Role: College Student
 
Join Date: Apr 2011
Rookie Year: 2010
Location: Platteville, WI
Posts: 117
JeremyLansing has much to be proud ofJeremyLansing has much to be proud ofJeremyLansing has much to be proud ofJeremyLansing has much to be proud ofJeremyLansing has much to be proud ofJeremyLansing has much to be proud ofJeremyLansing has much to be proud ofJeremyLansing has much to be proud ofJeremyLansing has much to be proud ofJeremyLansing has much to be proud of
Re: What are the correct terms for linkages and lifts

Quote:
Originally Posted by Chowmaster4695 View Post
I'd like to point out that fore-bar linkages need not nessacarily have 4 bars.
What is a fore-bar linkage? A quick google search turned up a bunch of results about four bar linkages (as well as this thread). I'm curious what you are talking about.
__________________
2015 Midwest Regional Finalists (Thanks to 2338 and 1756)
2014 Central Illinois Regional Finalists (Thanks to 4143 and 2039)
2013 Curie Division Semifinalists (Thanks to 2056 and 3990)
2013 North Star Regional Champions (Thanks to 2175 and 4607)
2011 10,000 Lakes Regional Champions (Thanks to 525 and 3642)
Reply With Quote
  #6   Spotlight this post!  
Unread 08-05-2014, 19:35
EricH's Avatar
EricH EricH is offline
New year, new team
FRC #1197 (Torbots)
Team Role: Engineer
 
Join Date: Jan 2005
Rookie Year: 2003
Location: SoCal
Posts: 19,803
EricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond repute
Re: What are the correct terms for linkages and lifts

Quote:
Originally Posted by Smitty1707 View Post
The "stacked 4-bars" you are referring to are known as scissor lifts. They seem like a simple concept, but can be very difficult to execute well. They require a high degree of precision as the links need to lie in the same planes as well as have the same lengths to prevent the lift from leaning.
The other term for a scissor lift, at least in FRC, is "What were you THINKING???" In addition to the degree of precision for the manufacture of individual links, they all have to go together precisely, and one end of the stack needs to be free to move horizontally, but not vertically. (This on top of the lift being rather unstable when fully extended--even a typical 26' lift can sway a bit when an average person walks from one end to the other while it's near the top of its travel.) Speaking as someone who uses one on a minimum of a weekly basis (and spent most of today on top of one), if someone successfully uses one in FRC, I will be quite surprised. (Current count of scissor-lift robots I've seen in elims: 1, maybe. On Einstein, 0.)
__________________
Past teams:
2003-2007: FRC0330 BeachBots
2008: FRC1135 Shmoebotics
2012: FRC4046 Schroedinger's Dragons

"Rockets are tricky..."--Elon Musk

Reply With Quote
  #7   Spotlight this post!  
Unread 08-05-2014, 20:01
Thad House Thad House is offline
Volunteer, WPILib Contributor
no team (Waiting for 2021)
Team Role: Mentor
 
Join Date: Feb 2011
Rookie Year: 2010
Location: Thousand Oaks, California
Posts: 1,104
Thad House has a reputation beyond reputeThad House has a reputation beyond reputeThad House has a reputation beyond reputeThad House has a reputation beyond reputeThad House has a reputation beyond reputeThad House has a reputation beyond reputeThad House has a reputation beyond reputeThad House has a reputation beyond reputeThad House has a reputation beyond reputeThad House has a reputation beyond reputeThad House has a reputation beyond repute
Re: What are the correct terms for linkages and lifts

Quote:
Originally Posted by EricH View Post
The other term for a scissor lift, at least in FRC, is "What were you THINKING???" In addition to the degree of precision for the manufacture of individual links, they all have to go together precisely, and one end of the stack needs to be free to move horizontally, but not vertically. (This on top of the lift being rather unstable when fully extended--even a typical 26' lift can sway a bit when an average person walks from one end to the other while it's near the top of its travel.) Speaking as someone who uses one on a minimum of a weekly basis (and spent most of today on top of one), if someone successfully uses one in FRC, I will be quite surprised. (Current count of scissor-lift robots I've seen in elims: 1, maybe. On Einstein, 0.)
Technically, 254's ball lift this year was a scissor lift... Just a very short single stage one.
__________________
All statements made are my own and not the feelings of any of my affiliated teams.
Teams 1510 and 2898 - Student 2010-2012
Team 4488 - Mentor 2013-2016
Co-developer of RobotDotNet, a .NET port of the WPILib.
Reply With Quote
  #8   Spotlight this post!  
Unread 30-12-2014, 17:25
Joe_Chase Joe_Chase is offline
Registered User
FTC #3397
 
Join Date: Dec 2013
Location: Essex, VT
Posts: 2
Joe_Chase is an unknown quantity at this point
Re: What are the correct terms for linkages and lifts

If we want to explore a linkage system quickly, we use a program called Linkage 2.0, developed by David Rector. Here is a link for a free download.

http://linkage.software.informer.com/2.0/

It is very easy to use and it is a fast way to explore a variety of systems. There are even examples that you can modify.
Reply With Quote
  #9   Spotlight this post!  
Unread 30-12-2014, 17:32
Abhishek R Abhishek R is offline
Registered User
FRC #0624
Team Role: Alumni
 
Join Date: Mar 2013
Rookie Year: 2012
Location: Texas
Posts: 892
Abhishek R has a reputation beyond reputeAbhishek R has a reputation beyond reputeAbhishek R has a reputation beyond reputeAbhishek R has a reputation beyond reputeAbhishek R has a reputation beyond reputeAbhishek R has a reputation beyond reputeAbhishek R has a reputation beyond reputeAbhishek R has a reputation beyond reputeAbhishek R has a reputation beyond reputeAbhishek R has a reputation beyond reputeAbhishek R has a reputation beyond repute
Re: What are the correct terms for linkages and lifts

Quote:
Originally Posted by Thad House View Post
Technically, 254's ball lift this year was a scissor lift... Just a very short single stage one.
Does a scissor lift require the two parts to be connected in the center? IIRC, and please correct me if I'm wrong, but their pinniped was two separate mechanisms that acted individually or at the same time (so they could eject the ball out either end). If they were connected, they would never be able to remove the ball through their intakes.
__________________
2012 - 2015 : 624 CRyptonite
Team Website
Reply With Quote
  #10   Spotlight this post!  
Unread 30-12-2014, 17:40
Boe's Avatar
Boe Boe is offline
2175 Alum
AKA: Brian Boehm
FRC #2175 (The Fighting Calculators)
Team Role: Alumni
 
Join Date: Mar 2012
Rookie Year: 2012
Location: Oakdale, Minnesota
Posts: 527
Boe has much to be proud ofBoe has much to be proud ofBoe has much to be proud ofBoe has much to be proud ofBoe has much to be proud ofBoe has much to be proud ofBoe has much to be proud ofBoe has much to be proud ofBoe has much to be proud of
Re: What are the correct terms for linkages and lifts

Quote:
Originally Posted by EricH View Post
The other term for a scissor lift, at least in FRC, is "What were you THINKING???" In addition to the degree of precision for the manufacture of individual links, they all have to go together precisely, and one end of the stack needs to be free to move horizontally, but not vertically. (This on top of the lift being rather unstable when fully extended--even a typical 26' lift can sway a bit when an average person walks from one end to the other while it's near the top of its travel.) Speaking as someone who uses one on a minimum of a weekly basis (and spent most of today on top of one), if someone successfully uses one in FRC, I will be quite surprised. (Current count of scissor-lift robots I've seen in elims: 1, maybe. On Einstein, 0.)
In 2013 842 used two small single stage scissor lift to raise frisbees into their shooter
https://www.youtube.com/watch?v=4nHd_bG5dZE
__________________
2014 IRI-Quarterfinalists (Thanks 368, 1477, 233)
2014 Minnesota State Championship-Winner (Thanks 2052, 4778)
2014 Archimedes Division-Quaterfinalists (Thanks 399, 2056, 2834)
2014 North Star-Semifinalists (Thanks 967, 4607)-Creativity Award-Safety Award
2014 Northern Lights-Winners (Thanks 359, 2502)-Excellence in Engineering-Safety Award
2013 Minne-Mini-Winners (Thanks 2169, 3883, 4239)
2013 MRI-Winners (Thanks 2052, 3130, 3313)
2013 MN State Fair-Winners
2013 IRI-Participant
2013 Minnesota State Championship-Winners (Thanks 2052, 4607)
2013 Galileo Division-Finalists (Thanks 2169, 3284)
2013 North Star Regional-Team Spirit Award-Winners (Thanks 967, 4607)
2013 Northern Lights Regional-Entrepreneurship Award-Quarterfinalists (Thanks 3130, 1675)
2012 North Star Regional-Creativity Award-Quarterfinalists (Thanks 2549, 3130)
2012 Lake Superior Regional-Coopertition Award-Quarterfinalists (Thanks 1625, 2957)
Reply With Quote
  #11   Spotlight this post!  
Unread 30-12-2014, 17:41
AdamHeard's Avatar
AdamHeard AdamHeard is offline
Lead Mentor
FRC #0973 (Greybots)
Team Role: Mentor
 
Join Date: Oct 2004
Rookie Year: 2004
Location: Atascadero
Posts: 5,507
AdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond repute
Send a message via AIM to AdamHeard
Re: What are the correct terms for linkages and lifts

Quote:
Originally Posted by Abhishek R View Post
Does a scissor lift require the two parts to be connected in the center? IIRC, and please correct me if I'm wrong, but their pinniped was two separate mechanisms that acted individually or at the same time (so they could eject the ball out either end). If they were connected, they would never be able to remove the ball through their intakes.
Correct. The claptrap was two separate arms essentially, pneumatically toggled independently. No scissor.
Reply With Quote
  #12   Spotlight this post!  
Unread 30-12-2014, 19:57
GeeTwo's Avatar
GeeTwo GeeTwo is offline
Technical Director
AKA: Gus Michel II
FRC #3946 (Tiger Robotics)
Team Role: Mentor
 
Join Date: Jan 2014
Rookie Year: 2013
Location: Slidell, LA
Posts: 3,655
GeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond repute
Re: What are the correct terms for linkages and lifts

I have heard of the four-bar linkage with equal-length opposing edges referred to as a "parallelogram linkage", though I don't recall that I've ever read it.
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 16:00.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi