Go to Post Building a 'bot is kinda like washing your hair, but instead of "rinse, lather, repeat"... you should "engineer, test, repeat". - Andy Baker [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rating: Thread Rating: 2 votes, 5.00 average. Display Modes
Prev Previous Post   Next Post Next
  #1   Spotlight this post!  
Unread 08-05-2014, 08:07
Foster Foster is offline
Engineering Program Management
VRC #8081 (STEMRobotics)
Team Role: Mentor
 
Join Date: Jul 2007
Rookie Year: 2005
Location: Delaware
Posts: 1,392
Foster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond reputeFoster has a reputation beyond repute
What are the correct terms for linkages and lifts

In the past I've built robots that have an arm made of 4 pieces of metal that form a parallelogram. The right side is fixed, and as the arm is raised the left side moves up, but stays parallel to the right side.

I've used the term 4 bar lift for this, but have heard others write/say "4 bar linkage". While I agree it's a 4 bar linkage, it is a single case. 4 bar linkages can have each bar be a different length. With different lengths, the motion is quite different. Which term is correct, or is there a better term / phrase to use.

Moving on to 6 bar linkages. When I Google these, an entire universe of really cool motion possibilities is shown. I've built 6 bar lifts, where it's two parallelogram 4 bar lifts superimposed over each other (the left vertical bar is the right vertical bar of the next linkage, the upper bar becomes the lower bar in the next linkage).

Lets go back to 4 bar for a second. There is a set of lifts where the bars cross (make an X). You see these in "high lift platforms". I've heard these referred to as "4 bar lifts" or in some cases 8 bar lifts, since there are 4 bars on each side. But then I've heard that stacking them makes that an 8 bar lift. And more stacking is a 12 bar lift.

So I'm looking for a little terminology help here. I'd like to be using the right terms (that mentor thing) to be understood / understand what others are trying to tell me.

I'm good if we limit these to moving in the same plane. I was watching a video of a "4 bar linkage" where the points can move in 3 dimensions and that appears to open up a much bigger can of worms.
__________________
Foster - VEX Delaware - 17 teams -- Chief Roboteer STEMRobotics.org
2010 - Mentor of the Year - VEX Clean Sweep World Championship
2006-2016, a decade of doing VEX, time really flies while having fun
Downingtown Area Robotics Web site and VEXMen Team Site come see what we can do for you.
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 12:50.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi