Go to Post Last year we saved a ton of money by using a good bit of square tubing for the frame of our robot, square tubing is a lot cheaper then C channel. We get to use so much raw material that the cost should go down in certain places. - Derrick Maust [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rating: Thread Rating: 2 votes, 5.00 average. Display Modes
Prev Previous Post   Next Post Next
  #6   Spotlight this post!  
Unread 07-08-2014, 22:02
sanddrag sanddrag is offline
On to my 16th year in FRC
FRC #0696 (Circuit Breakers)
Team Role: Teacher
 
Join Date: Jul 2002
Rookie Year: 2002
Location: Glendale, CA
Posts: 8,516
sanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond repute
Re: [FRC Blog] FRC Expands Regionals to Four Days

Now Frank, will you PLEASE consider directing local regionals to allow teams to set up their pit areas during load-in night? It is SO much safer and easier than in the rush of things on the first morning. To be blunt, the existing schedule and limitation on setup is stupid.

We load in all our stuff Wednesday night, completely filling the 10x10 area, then Thursday morning we move it ALL out of the 10x10 area completely, blocking the aisle and getting in the way of numerous people, and then assemble back into our pit area piece by piece properly. While the pit setup is taking place, we usually move the robot to a vacant hallway or other area to prepare it for inspection. It's a very disruptive process to all parties in attendance, and we take up 3 pit areas worth of space doing it.

Just let us set up the pit on load-in night when hardly anybody is there.
__________________
Teacher/Engineer/Machinist - Team 696 Circuit Breakers, 2011 - Present
Mentor/Engineer/Machinist, Team 968 RAWC, 2007-2010
Technical Mentor, Team 696 Circuit Breakers, 2005-2007
Student Mechanical Leader and Driver, Team 696 Circuit Breakers, 2002-2004
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 20:31.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi