Go to Post Robotics season has monopolized my time for the past several weeks so I have not been keeping up with Segway news lately - Stu Bloom [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 11-01-2015, 08:57
Omer Katz Omer Katz is offline
Registered User
FRC #1577
 
Join Date: Jan 2015
Location: Israel
Posts: 6
Omer Katz is an unknown quantity at this point
Question Recycling Container Placement

I have a Question and i want to see your opinions
How long do you think it will take to place a Recycling Container on a stack of 6 Totes?
I'm not looking for one straight answer but your general opinion.
Thanks for the help
Reply With Quote
  #2   Spotlight this post!  
Unread 11-01-2015, 09:21
MrForbes's Avatar
MrForbes MrForbes is offline
Registered User
AKA: Jim
FRC #1726 (N.E.R.D.S.)
Team Role: Mentor
 
Join Date: Feb 2006
Rookie Year: 2006
Location: Sierra Vista AZ
Posts: 6,008
MrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond repute
Re: Recycling Container Placement

I guess that depends on which team is doing it? It will depend on the robot design, and operator skill. We're hoping to make it about a ten second process, but then again we're not intending to place a container on a stack of 6 totes...only a stack of 5, at most. 4, more often.
Reply With Quote
  #3   Spotlight this post!  
Unread 12-01-2015, 10:16
MrJohnston MrJohnston is offline
Registered User
FRC #0948 (Newport Robotics Group (NRG))
Team Role: Teacher
 
Join Date: Feb 2013
Rookie Year: 2011
Location: Bellevue, WA
Posts: 378
MrJohnston has a reputation beyond reputeMrJohnston has a reputation beyond reputeMrJohnston has a reputation beyond reputeMrJohnston has a reputation beyond reputeMrJohnston has a reputation beyond reputeMrJohnston has a reputation beyond reputeMrJohnston has a reputation beyond reputeMrJohnston has a reputation beyond reputeMrJohnston has a reputation beyond reputeMrJohnston has a reputation beyond reputeMrJohnston has a reputation beyond repute
Re: Recycling Container Placement

It will also depend on the situation... Making a stack from the landfill will likely take a little longer than from the loading station...

Under ideal conditions (our autonomous went perfectly, we quickly grab a container, run over to the feeder station, our intake deals perfectly with the tumbling totes and we line up ideally in the scoring zone on our first attempt, we could stack five and a container in 15 seconds.

Of course:
1) Rarely do things work out perfectly.
2) Right now, we only have a "theoretical" robot.... Or, perhaps I should say, "several parts of a 'theoretical' robot..." The other parts are in the mail - unless they are on back-order.....
Reply With Quote
  #4   Spotlight this post!  
Unread 12-01-2015, 13:00
Zekoku Zekoku is offline
Registered User
FRC #2170
 
Join Date: Jan 2015
Location: Glastonbury
Posts: 3
Zekoku is an unknown quantity at this point
Re: Recycling Container Placement

If I remember correctly 6 totes is 78 inches and the max robot height is also 78 inches so I believe you have to place a container on before you stack 6 totes.
Reply With Quote
  #5   Spotlight this post!  
Unread 12-01-2015, 13:04
Rangel's Avatar
Rangel Rangel is online now
John Rangel
FRC #0842 (Falcon Robotics)
Team Role: Mentor
 
Join Date: Jan 2010
Rookie Year: 2009
Location: Phoenix, AZ
Posts: 740
Rangel has a reputation beyond reputeRangel has a reputation beyond reputeRangel has a reputation beyond reputeRangel has a reputation beyond reputeRangel has a reputation beyond reputeRangel has a reputation beyond reputeRangel has a reputation beyond reputeRangel has a reputation beyond reputeRangel has a reputation beyond reputeRangel has a reputation beyond reputeRangel has a reputation beyond repute
Re: Recycling Container Placement

For the average robot, about a 20-30 seconds with high chance of fail. For top tier teams, 5-10 seconds with very little chance of failure.
__________________
2012 Dean's List Winner
2011-2014 Arizona Regional Winners
2016 Las Vegas Regional Winner
2014-? Mentor



Last edited by Rangel : 12-01-2015 at 13:06. Reason: Read OP wrong
Reply With Quote
  #6   Spotlight this post!  
Unread 12-01-2015, 13:21
nighterfighter nighterfighter is offline
1771 Alum, 1771 Mentor
AKA: Matt B
FRC #1771 (1771)
Team Role: Mentor
 
Join Date: Sep 2009
Rookie Year: 2007
Location: Suwanee/Kennesaw, GA
Posts: 835
nighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant future
Re: Recycling Container Placement

Quote:
Originally Posted by Zekoku View Post
If I remember correctly 6 totes is 78 inches and the max robot height is also 78 inches so I believe you have to place a container on before you stack 6 totes.
Actually, each tote is 12.1 inches tall, according to the manual.

12.1 * 6 = 72.6

That leaves your robot 78 - 72.6 = 5.4 inches.

Of course, the scoring platform is 2 inches tall...so... 3.4 inches.
__________________
1771- Programmer, Captain, Drive Team (2009-2012)
4509- Mentor (2013-2015)
1771- Mentor (2015)
Reply With Quote
  #7   Spotlight this post!  
Unread 13-01-2015, 12:21
StephenNutt StephenNutt is offline
Registered User
FRC #0172 (Falgor)
Team Role: Mentor
 
Join Date: Jan 2009
Rookie Year: 2007
Location: Falmouth, ME
Posts: 37
StephenNutt is an unknown quantity at this point
Re: Recycling Container Placement

Quote:
Originally Posted by nighterfighter View Post
Actually, each tote is 12.1 inches tall, according to the manual.

12.1 * 6 = 72.6

That leaves your robot 78 - 72.6 = 5.4 inches.

Of course, the scoring platform is 2 inches tall...so... 3.4 inches.
When you stack totes they mat sit inside of each other, and I think each tote is around 11.875 tall.

12.1 + 5 * 11.875 = 71.475

That leaves your robot 78 - 71.475 = 6.525 inches, or 4.525 when taking into account the scoring platform.

Note: I am not certain the distance from the bottom to the top of the lid is 11.875, please verify if you will be using my math.
Reply With Quote
  #8   Spotlight this post!  
Unread 13-01-2015, 13:26
nighterfighter nighterfighter is offline
1771 Alum, 1771 Mentor
AKA: Matt B
FRC #1771 (1771)
Team Role: Mentor
 
Join Date: Sep 2009
Rookie Year: 2007
Location: Suwanee/Kennesaw, GA
Posts: 835
nighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant futurenighterfighter has a brilliant future
Re: Recycling Container Placement

Well that makes it even easier...
__________________
1771- Programmer, Captain, Drive Team (2009-2012)
4509- Mentor (2013-2015)
1771- Mentor (2015)
Reply With Quote
  #9   Spotlight this post!  
Unread 13-01-2015, 13:49
TCMJ1816's Avatar
TCMJ1816 TCMJ1816 is offline
Peter
AKA: Peter Hartnett
FRC #1816 ("The Green Machine" (Alumnus))
Team Role: Mechanical
 
Join Date: Nov 2014
Rookie Year: 2008
Location: Edina, Minnesota
Posts: 41
TCMJ1816 will become famous soon enough
Re: Recycling Container Placement

The Scoring Platform doesn't count towards total robot height, so you can build a robot 78'' tall and still drive on the scoring platform. Having said that lifting a bin ~5'' from the bottom doesn't seem feasible for most teams, I just can't see it being stable enough once 8' in the air.
Reply With Quote
  #10   Spotlight this post!  
Unread 13-01-2015, 14:22
MrForbes's Avatar
MrForbes MrForbes is offline
Registered User
AKA: Jim
FRC #1726 (N.E.R.D.S.)
Team Role: Mentor
 
Join Date: Feb 2006
Rookie Year: 2006
Location: Sierra Vista AZ
Posts: 6,008
MrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond repute
Re: Recycling Container Placement

We got our first container mechanism prototyped last night, and we'll make some changes to see if we can make it more stable when grasping at the bottom of the container. It looks like it will almost work with what we have already. Bonus, it will also work on totes, and we can probably use it (by adding another degree of freedom, which is also needed to meet size requirements) to pick up tipped containers.
Reply With Quote
  #11   Spotlight this post!  
Unread 14-01-2015, 18:08
Linkathon1986's Avatar
Linkathon1986 Linkathon1986 is offline
That One Person
AKA: Jonathon Erickson
FRC #2512 (Duluth East Daredevils)
Team Role: Tactician
 
Join Date: Jan 2015
Rookie Year: 2015
Location: Duluth, MN
Posts: 28
Linkathon1986 is a splendid one to beholdLinkathon1986 is a splendid one to beholdLinkathon1986 is a splendid one to beholdLinkathon1986 is a splendid one to beholdLinkathon1986 is a splendid one to beholdLinkathon1986 is a splendid one to beholdLinkathon1986 is a splendid one to behold
Re: Recycling Container Placement

Quote:
Originally Posted by nighterfighter View Post
Actually, each tote is 12.1 inches tall, according to the manual.

12.1 * 6 = 72.6

That leaves your robot 78 - 72.6 = 5.4 inches.

Of course, the scoring platform is 2 inches tall...so... 3.4 inches.
But if you're wanting to work with litter, you will need to place the litter before you stack.
Reply With Quote
  #12   Spotlight this post!  
Unread 14-01-2015, 19:48
tindleroot tindleroot is offline
Free Scouting Help to All
AKA: Casey LeeVan
FRC #4272 (Maverick Boiler Robotics)
Team Role: Mentor
 
Join Date: Mar 2014
Rookie Year: 2007
Location: Indiana
Posts: 595
tindleroot has a reputation beyond reputetindleroot has a reputation beyond reputetindleroot has a reputation beyond reputetindleroot has a reputation beyond reputetindleroot has a reputation beyond reputetindleroot has a reputation beyond reputetindleroot has a reputation beyond reputetindleroot has a reputation beyond reputetindleroot has a reputation beyond reputetindleroot has a reputation beyond reputetindleroot has a reputation beyond repute
Re: Recycling Container Placement

Quote:
Originally Posted by StephenNutt View Post
When you stack totes they mat sit inside of each other, and I think each tote is around 11.875 tall.

12.1 + 5 * 11.875 = 71.475

That leaves your robot 78 - 71.475 = 6.525 inches, or 4.525 when taking into account the scoring platform.

Note: I am not certain the distance from the bottom to the top of the lid is 11.875, please verify if you will be using my math.
We measured a nested stack of 6 and it came out at almost exactly 72 inches - you have 6 inches to work with or 4 if you take into account the scoring platform.
__________________
2012-2013: FTC 4601 (student)
2014-2015: FRC 135 (student) - 5 banners in 2 years!
2016-present: FRC 4272 (mentor)

Thanks to all of our alliance partners!
11, 51, 68, 201, 234, 868, 1108, 1241, 1760, 3147, 3301, 3487, 3865, 4269, 4485, 4580, 5188

Reply With Quote
  #13   Spotlight this post!  
Unread 15-01-2015, 14:07
Addison4300's Avatar
Addison4300 Addison4300 is offline
FRC is love, FRC is life
AKA: Addison
FRC #4300 (The Lion Kings)
Team Role: Leadership
 
Join Date: Jan 2015
Rookie Year: 2013
Location: McKinney, Texas
Posts: 142
Addison4300 is on a distinguished road
Re: Recycling Container Placement

It all depends on the strength and speed of your motors/pneumatics that you use, how many you use, and how well you are lined up with the stack.
Reply With Quote
  #14   Spotlight this post!  
Unread 16-01-2015, 12:05
mitchklong mitchklong is offline
Registered User
None #4859
 
Join Date: Jan 2014
Location: Minnesota
Posts: 30
mitchklong is an unknown quantity at this point
Re: Recycling Container Placement

I dont expect to see a lot of teams doing that.

I think it would be easier to make a 4 tote stack, then put a 2 tote bin stack on top (or other variations).

One of the things I like about this years game is working out the effort required/center of gravity issues.
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 17:42.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi