|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
|
|
Thread Tools |
Rating:
|
Display Modes |
|
|
|
#1
|
||||
|
||||
|
Re: Vertical Tracks for Forklift
I definitely would recommend against using 6063. It almost seems like a completely different material
|
|
#2
|
||||
|
||||
|
Re: Vertical Tracks for Forklift
We are using 80/20 for the vertical rails. Our traveling element uses skateboard bearings.
The whole thing works smooth as ice and was easy to build. Can easily lift 4 totes and a bin. Very successful so far. |
|
#3
|
||||
|
||||
|
Re: Vertical Tracks for Forklift
Quote:
The only thing in stock in town is 1/8" wall 6063. For comparison, Versaframe (3/32" wall, 6061) is 60% stronger and 20% lighter by my calculations. (Although the thicker wall tube is 18% stiffer.)The downside of Versaframe is that it costs about double what the 6063 costs from Metal Supermarkets (on a per-foot basis), only comes in 5' lengths, and has a shipping delay. But considering the extra strength and the usefulness of the pre-drilled holes, Versaframe is worth the premium for critical parts IMHO. /derail |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|