Go to Post What can you do? The more time you waste here speculating the less time you have to work on the robot. Go! Build Robots! Now! - Jessica Boucher [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rating: Thread Rating: 4 votes, 5.00 average. Display Modes
Prev Previous Post   Next Post Next
  #2   Spotlight this post!  
Unread 06-02-2015, 22:41
cgmv123's Avatar
cgmv123 cgmv123 is offline
FRC RI/FLL Field Manager
AKA: Max Vrany
FRC #1306 (BadgerBOTS)
Team Role: College Student
 
Join Date: Jan 2011
Rookie Year: 2011
Location: Madison, WI
Posts: 2,081
cgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond repute
Re: 2015 FRC Inspection Checklist

Quote:
Originally Posted by AustinShalit View Post
Regarding Wire Colors, can green be added as an appropriate color for the return wires? This is the color of the return wire built into the Talon SRX and Victor SP.
R40 doesn't apply to wiring that doesn't have a constant polarity, like the outputs of speed controllers.

Quote:
For Compressor Power, the inspection checklist says “under control of the robotRIO”. Is this different from the rules, “must still be controlled and powered by the ROBOT”?
It's a combination of "must still be controlled and powered by the ROBOT", "The two wires from the pressure switch must be connected directly the pressure switch input of the PCM controlling the compressor or, if controlled using the roboRIO and a Spike relay, to the roboRIO." (R77-C), and "If connected to the roboRIO, the roboRIO must be programmed to sense the state of the switch and operate the relay module that powers the compressor to prevent over-pressuring the system." (R77-D).

Quote:
During the Power On Check, Confirm Pneumatics Operation - Does this mean that we have to have the compressor start when the robot is first enabled? What if we do not want it to?
Not sure about that one.
__________________
BadgerBOTS Robotics|@team1306|Facebook: BadgerBOTS
2016 FIRST Championship Tesla Division | 2016 Wisconsin Regional Engineering Inspiration Award

2015 FIRST Championship Carson Division | 2015 Wisconsin Regional Chairman's Award

2013 FIRST Championship Curie Division | 2013 Wisconsin Regional Chairman's Award

2012 FIRST Championship Archimedes Division | 2012 Wisconsin Regional Engineering Inspiration Award, Woodie Flowers Finalist Award (Lead Mentor Ben Senson)

Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 07:50.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi