Go to Post There really is nothing else that needs to be said. - billbo911 [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rating: Thread Rating: 14 votes, 5.00 average. Display Modes
  #91   Spotlight this post!  
Unread 11-02-2015, 18:19
MrRoboSteve MrRoboSteve is offline
Mentor
AKA: Steve Peterson
FRC #3081 (Kennedy RoboEagles)
Team Role: Mentor
 
Join Date: Mar 2012
Rookie Year: 2011
Location: Bloomington, MN
Posts: 578
MrRoboSteve has a reputation beyond reputeMrRoboSteve has a reputation beyond reputeMrRoboSteve has a reputation beyond reputeMrRoboSteve has a reputation beyond reputeMrRoboSteve has a reputation beyond reputeMrRoboSteve has a reputation beyond reputeMrRoboSteve has a reputation beyond reputeMrRoboSteve has a reputation beyond reputeMrRoboSteve has a reputation beyond reputeMrRoboSteve has a reputation beyond reputeMrRoboSteve has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

It's not an unusual issue, even for experienced teams.

I was inspecting the wiring from our CIM motors back to the speed controllers, and asked whether they had looked at the wiring table. Turns out they matched the wire off of the CIMs, rather than using the table. Fixing it is now on our punch list.
__________________
2016-17 events: 10000 Lakes Regional, Northern Lights Regional, FTC Burnsville Qualifying Tournament

2011 - present · FRC 3081 Kennedy RoboEagles mentor
2013 - present · event volunteer at 10000 Lakes Regional, Northern Lights Regional, North Star Regional, Lake Superior Regional, Minnesota State Tournament, PNW District 4 Glacier Peak, MN FTC, CMP
http://twitter.com/MrRoboSteve · www.linkedin.com/in/speterson
Reply With Quote
  #92   Spotlight this post!  
Unread 12-02-2015, 13:27
JamesCH95's Avatar
JamesCH95 JamesCH95 is offline
Hardcore Dork
AKA: JCH
FRC #0095 (The Grasshoppers)
Team Role: Engineer
 
Join Date: Dec 2004
Rookie Year: 2001
Location: Enfield, NH
Posts: 1,848
JamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Another pneumatic system question: does the steel NPT fitting, standard on the Viair compressors, need to be installed?

It is the compressor's fitting that typically comes with a plastic plug in it, seen here:

__________________
Theory is a nice place, I'd like to go there one day, I hear everything works there.

Maturity is knowing you were an idiot, common sense is trying to not be an idiot, wisdom is knowing that you will still be an idiot.
Reply With Quote
  #93   Spotlight this post!  
Unread 12-02-2015, 13:32
ATannahill ATannahill is offline
Registered User
AKA: Alex Tannahill
no team
 
Join Date: Feb 2008
Rookie Year: 2008
Location: Southfield, Michigan
Posts: 3,258
ATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by JamesCH95 View Post
Another pneumatic system question: does the steel NPT fitting, standard on the Viair compressors, need to be installed?

It is the compressor's fitting that typically comes with a plastic plug in it, seen here:



The pressure relief valve must be attached to the compressor with legal hard (non tube) fittings, so if you chose to install the NPT to plastic plug fitting, it must be past the pressure relief valve.

Quote:
Originally Posted by R76
The relief valve must be attached directly to the compressor or attached by legal hard fittings (e.g. brass, nylon, etc.) connectedto the compressor output port. If using an off-board compressor, an additional relief valve must be included on the ROBOT.

Last edited by ATannahill : 12-02-2015 at 13:35.
Reply With Quote
  #94   Spotlight this post!  
Unread 12-02-2015, 13:33
MrBasse MrBasse is offline
Registered User
FRC #3572 (Wavelength)
Team Role: Coach
 
Join Date: Jul 2011
Rookie Year: 2010
Location: Norton Shores, MI
Posts: 677
MrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by JamesCH95 View Post
Another pneumatic system question: does the steel NPT fitting, standard on the Viair compressors, need to be installed?

It is the compressor's fitting that typically comes with a plastic plug in it, seen here:

It comes installed, so you would have to take it off. That sounds like modification to me.

Why don't you want it? It doesn't add much weight, and it gives you an easy adaptation to a tee fitting for the relief valve.
__________________
Andrew Basse
Coach - FRC Team 3572 - Wavelength
Reply With Quote
  #95   Spotlight this post!  
Unread 12-02-2015, 13:37
ATannahill ATannahill is offline
Registered User
AKA: Alex Tannahill
no team
 
Join Date: Feb 2008
Rookie Year: 2008
Location: Southfield, Michigan
Posts: 3,258
ATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by MrBasse View Post
It comes installed, so you would have to take it off. That sounds like modification to me.

Why don't you want it? It doesn't add much weight, and it gives you an easy adaptation to a tee fitting for the relief valve.
I believe that modification is legal under R65-C since it is pre-existing threads.

Last edited by ATannahill : 12-02-2015 at 13:43.
Reply With Quote
  #96   Spotlight this post!  
Unread 12-02-2015, 13:41
JamesCH95's Avatar
JamesCH95 JamesCH95 is offline
Hardcore Dork
AKA: JCH
FRC #0095 (The Grasshoppers)
Team Role: Engineer
 
Join Date: Dec 2004
Rookie Year: 2001
Location: Enfield, NH
Posts: 1,848
JamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by rtfgnow View Post
The pressure relief valve must be attached to the compressor with legal hard (non tube) fittings, so if you chose to install the NPT to plastic plug fitting, it must be past the pressure relief valve.
True... but irrelevant to my question.

Quote:
Originally Posted by MrBasse View Post
It comes installed, so you would have to take it off. That sounds like modification to me.

Why don't you want it? It doesn't add much weight, and it gives you an easy adaptation to a tee fitting for the relief valve.
Removing a pre-installed fitting would be like changing the terminal screws on a Victor. Yeah, it's not precisely the original hardware, but from a safety and function perspective it hasn't changed.

The steel coupler pushes a few fittings and a gauge to a spot that's less accessible (and makes the gauge less readable) so it is handy to not have it in place.

The port in the compressor is 1/8NPT, so attaching normal hard-fittings and tees is the same as attaching to the steel part, it just fits into our robot a bit more easily.
__________________
Theory is a nice place, I'd like to go there one day, I hear everything works there.

Maturity is knowing you were an idiot, common sense is trying to not be an idiot, wisdom is knowing that you will still be an idiot.
Reply With Quote
  #97   Spotlight this post!  
Unread 12-02-2015, 13:41
MrBasse MrBasse is offline
Registered User
FRC #3572 (Wavelength)
Team Role: Coach
 
Join Date: Jul 2011
Rookie Year: 2010
Location: Norton Shores, MI
Posts: 677
MrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by MrRoboSteve View Post
It's not an unusual issue, even for experienced teams.

I was inspecting the wiring from our CIM motors back to the speed controllers, and asked whether they had looked at the wiring table. Turns out they matched the wire off of the CIMs, rather than using the table. Fixing it is now on our punch list.
I might be missing something really simple, but I never understood this rule. If the device in question has 14 AWG wire standard, why do I have to feed it with 12 AWG? Are we trying to say that the manufacturer is not using the proper wire? A CIM on a 40 AMP breaker will draw a good amount of current if you tell it to, but why doesn't the CIM wiring dictate what wire is used between the breaker and the speed control?

How does it make sense that I would have to crimp 12 AWG wire to 14 AWG wire after the speed controller to be legal? How does that help?
__________________
Andrew Basse
Coach - FRC Team 3572 - Wavelength
Reply With Quote
  #98   Spotlight this post!  
Unread 12-02-2015, 13:44
MrBasse MrBasse is offline
Registered User
FRC #3572 (Wavelength)
Team Role: Coach
 
Join Date: Jul 2011
Rookie Year: 2010
Location: Norton Shores, MI
Posts: 677
MrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond reputeMrBasse has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by JamesCH95 View Post
True... but irrelevant to my question.



Removing a pre-installed fitting would be like changing the terminal screws on a Victor. Yeah, it's not precisely the original hardware, but from a safety and function perspective it hasn't changed.

The steel coupler pushes a few fittings and a gauge to a spot that's less accessible (and makes the gauge less readable) so it is handy to not have it in place.

The port in the compressor is 1/8NPT, so attaching normal hard-fittings and tees is the same as attaching to the steel part, it just fits into our robot a bit more easily.
I guess I would counter by saying that you can modify electronics practically all you want. Pneumatics have painful rules in place to prevent accidents that may happen when people don't understand a system.

R65 C might give you a little leeway with that idea though since you are using the existing threads.
__________________
Andrew Basse
Coach - FRC Team 3572 - Wavelength
Reply With Quote
  #99   Spotlight this post!  
Unread 12-02-2015, 13:51
JamesCH95's Avatar
JamesCH95 JamesCH95 is offline
Hardcore Dork
AKA: JCH
FRC #0095 (The Grasshoppers)
Team Role: Engineer
 
Join Date: Dec 2004
Rookie Year: 2001
Location: Enfield, NH
Posts: 1,848
JamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by MrBasse View Post
I guess I would counter by saying that you can modify electronics practically all you want. Pneumatics have painful rules in place to prevent accidents that may happen when people don't understand a system.

R65 C might give you a little leeway with that idea though since you are using the existing threads.
Are you sure about that? See R55.

R65-C is why I assume our actions are legal, but I just want to double-check with the in-field experts.
__________________
Theory is a nice place, I'd like to go there one day, I hear everything works there.

Maturity is knowing you were an idiot, common sense is trying to not be an idiot, wisdom is knowing that you will still be an idiot.
Reply With Quote
  #100   Spotlight this post!  
Unread 12-02-2015, 14:01
rich2202 rich2202 is offline
Registered User
FRC #2202 (BEAST Robotics)
Team Role: Mentor
 
Join Date: Jan 2012
Rookie Year: 2012
Location: Wisconsin
Posts: 1,213
rich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by MrBasse View Post
I might be missing something really simple, but I never understood this rule. If the device in question has 14 AWG wire standard, why do I have to feed it with 12 AWG?
Because you put it on a circuit capable of feeding 40 amps. The RI looks at the PDB and breakers. If you put a 40 amp breaker in the PDB, then that connection has to have 12 AWG wire. The RI doesn't have to follow the circuit to see what it is connected to.
Reply With Quote
  #101   Spotlight this post!  
Unread 12-02-2015, 14:03
cgmv123's Avatar
cgmv123 cgmv123 is offline
FRC RI/FLL Field Manager
AKA: Max Vrany
FRC #1306 (BadgerBOTS)
Team Role: College Student
 
Join Date: Jan 2011
Rookie Year: 2011
Location: Madison, WI
Posts: 2,080
cgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond reputecgmv123 has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by MrBasse View Post
I might be missing something really simple, but I never understood this rule. If the device in question has 14 AWG wire standard, why do I have to feed it with 12 AWG? Are we trying to say that the manufacturer is not using the proper wire? A CIM on a 40 AMP breaker will draw a good amount of current if you tell it to, but why doesn't the CIM wiring dictate what wire is used between the breaker and the speed control?

How does it make sense that I would have to crimp 12 AWG wire to 14 AWG wire after the speed controller to be legal? How does that help?
Quote:
Originally Posted by rich2202 View Post
Because you put it on a circuit capable of feeding 40 amps. The RI looks at the PDB and breakers. If you put a 40 amp breaker in the PDB, then that connection has to have 12 AWG wire. The RI doesn't have to follow the circuit to see what it is connected to.
CIM wire leads also have insulation that can take more heat than the insulation that's on most wires.
__________________
BadgerBOTS Robotics|@team1306|Facebook: BadgerBOTS
2016 FIRST Championship Tesla Division | 2016 Wisconsin Regional Engineering Inspiration Award

2015 FIRST Championship Carson Division | 2015 Wisconsin Regional Chairman's Award

2013 FIRST Championship Curie Division | 2013 Wisconsin Regional Chairman's Award

2012 FIRST Championship Archimedes Division | 2012 Wisconsin Regional Engineering Inspiration Award, Woodie Flowers Finalist Award (Lead Mentor Ben Senson)

Reply With Quote
  #102   Spotlight this post!  
Unread 12-02-2015, 14:06
rich2202 rich2202 is offline
Registered User
FRC #2202 (BEAST Robotics)
Team Role: Mentor
 
Join Date: Jan 2012
Rookie Year: 2012
Location: Wisconsin
Posts: 1,213
rich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by JamesCH95 View Post
Another pneumatic system question: does the steel NPT fitting, standard on the Viair compressors, need to be installed?
I think "installed" is the key word. R65 says the original condition. "optional" parts are not part of the original condition.

Now, if it came with it installed, then the question is whether R65-C applies since you would be "disassembling" to remove the NPT fitting, and not "assembling".
Reply With Quote
  #103   Spotlight this post!  
Unread 12-02-2015, 14:10
rich2202 rich2202 is offline
Registered User
FRC #2202 (BEAST Robotics)
Team Role: Mentor
 
Join Date: Jan 2012
Rookie Year: 2012
Location: Wisconsin
Posts: 1,213
rich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by cgmv123 View Post
CIM wire leads also have insulation that can take more heat than the insulation that's on most wires.
Another thought:

FIRST doesn't want you replacing wires that were not intended to be replaced. Thus the concession granting exception to using wire as supplied by the manufacturer.
Reply With Quote
  #104   Spotlight this post!  
Unread 12-02-2015, 14:11
Jon Stratis's Avatar
Jon Stratis Jon Stratis is offline
Electrical/Programming Mentor
FRC #2177 (The Robettes)
Team Role: Mentor
 
Join Date: Feb 2007
Rookie Year: 2006
Location: Minnesota
Posts: 3,785
Jon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond repute
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by JamesCH95 View Post
The steel coupler pushes a few fittings and a gauge to a spot that's less accessible (and makes the gauge less readable) so it is handy to not have it in place.
The only part that is required to be connected by hard fittings is the relief valve. Hook up a T with a relief valve on it, then use some tubing to located the gagged and switch and such someplace more accessible.
__________________
2007 - Present: Mentor, 2177 The Robettes
LRI: North Star 2012-2016; Lake Superior 2013-2014; MN State Tournament 2013-2014, 2016; Galileo 2016; Iowa 2017
2015: North Star Regional Volunteer of the Year
2016: Lake Superior WFFA
Reply With Quote
  #105   Spotlight this post!  
Unread 12-02-2015, 14:12
scca229 scca229 is offline
FTA acquiring knowledge
AKA: Nate
FRC #0060
Team Role: Mentor
 
Join Date: Apr 2014
Rookie Year: 2011
Location: South of Phoenix, Arizona
Posts: 215
scca229 has a spectacular aura aboutscca229 has a spectacular aura about
Re: Al's Annual Inspection Thread 2015

Quote:
Originally Posted by rich2202 View Post
Because you put it on a circuit capable of feeding 40 amps. The RI looks at the PDB and breakers. If you put a 40 amp breaker in the PDB, then that connection has to have 12 AWG wire. The RI doesn't have to follow the circuit to see what it is connected to.
Just to verify:

PDB <-> 40A Breaker <-> 12AWG wire <-> Victor <-> 14AWG wire directly attached to CIM

Legal?
__________________
Nate
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 01:03.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi