Go to Post Build a GREAT robot (just not as good as mine). - Steve W [more]
Home
Go Back   Chief Delphi > Technical > Technical Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #8   Spotlight this post!  
Unread 07-05-2015, 23:41
GeeTwo's Avatar
GeeTwo GeeTwo is offline
Technical Director
AKA: Gus Michel II
FRC #3946 (Tiger Robotics)
Team Role: Mentor
 
Join Date: Jan 2014
Rookie Year: 2013
Location: Slidell, LA
Posts: 3,709
GeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond repute
Re: Modular Building Systems

Thanks all! We'll keep all of this in mind as we move forward in our fabrication processes. I got approval this evening to go forward with a budget proposal to make this work, so please continue if you have more!

And OBTW, I'm presuming that you didn't realize you were breaking R15 and/or T12:

Quote:
Originally Posted by maxxman View Post
This year however after Thursday at our first regional a couple people suggested a way to make our elevator better. We just took the part off. Brought it home with us and made the changes that we needed. And not too mention that we never had a single part break through 2 regionals.
Quote:
Originally Posted by R15
Teams must stay “hands-off” their bagged ROBOT elements during the following time periods:
A. between Stop Build Day and their first event,
B. during the period(s) between their events, and
C. outside of Pit hours while attending events.
Additional time is allowed as follows:
D. After Kickoff, there are no restrictions on when software may be developed.
E. On days a team is not attending an event, they may continue development of any items permitted per R17, including items listed as exempt from R17, but must do so without interfacing with the ROBOT.
F. Teams attending 2-day events may access their ROBOTS per the rules defined in the 2015 Administrative Manual Section
5.6: ROBOT Access Period - for Teams Attending District Events.
G. ROBOTS may be exhibited per 2015 Administrative Manual Section 5.5.3: Robot Displays.
Quote:
Originally Posted by T12
During the event, from load-in on the first day to load-out on the final day, Teams may only produce FABRICATED ITEMS in the
pit areas or provided machine shops, as defined in the Administrative Manual, Section 4.8: The Pit, and per R17 in Section 4.6:
Material Utilization.
__________________

If you can't find time to do it right, how are you going to find time to do it over?
If you don't pass it on, it never happened.
Robots are great, but inspiration is the reason we're here.
Friends don't let friends use master links.
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 04:39.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi