Go to Post "Building the technology of tomorrow - sometime late tonight!" - dlavery [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #13   Spotlight this post!  
Unread 19-11-2015, 13:43
techhelpbb's Avatar
techhelpbb techhelpbb is offline
Registered User
FRC #0011 (MORT - Team 11)
Team Role: Mentor
 
Join Date: Nov 2010
Rookie Year: 1997
Location: New Jersey
Posts: 1,620
techhelpbb has a reputation beyond reputetechhelpbb has a reputation beyond reputetechhelpbb has a reputation beyond reputetechhelpbb has a reputation beyond reputetechhelpbb has a reputation beyond reputetechhelpbb has a reputation beyond reputetechhelpbb has a reputation beyond reputetechhelpbb has a reputation beyond reputetechhelpbb has a reputation beyond reputetechhelpbb has a reputation beyond reputetechhelpbb has a reputation beyond repute
Re: Mythical Six Week Build Season

Quote:
Originally Posted by Jon Stratis View Post
Again, your missing the point. You can build a SUCCESSFUL robot in 6 weeks. Over the past 9 years, my team has only made significant changes at competition twice. We've been finalists 3 times, winners twice, and almost always play in eliminations (usually as captain or first round pick). And all of that is done with a student led team that emphasizes training and experience over getting the perfect robot out. Sure, if it was just the mentors on our team building, we'd be done in a week. But the mentors do very, very little building.

The point is, the schedule may be a limiting factor to how much you can do, but it shouldn't be a limiting factor in producing a successful robot if your team can develop a good process and plan for the season.
That's fine. You built the robot and it placed highly in competition.
My point is that building the robot is not enough.
The fact you can take longer to build the robot is not always about adding features.

Team 11 & 193 (both in Mount Olive High School) both student led teams build generally at least 3 robots sometimes 4 in 6 weeks. Sometimes we add on a few prototypes as we go. One major reason we split the team was because with so many people on just Team 11 wouldn't get the full experience they could have. Now we facilitate that at the cost of a whole extra team.

So it's not just about building the robot. If it was I wouldn't need FIRST.

Last edited by techhelpbb : 19-11-2015 at 13:46.
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 08:21.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi