Go to Post We'll get through this as a community, this we know. - JaneYoung [more]
Home
Go Back   Chief Delphi > Technical > Pneumatics
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
 
Thread Tools Rating: Thread Rating: 2 votes, 3.50 average. Display Modes
  #1   Spotlight this post!  
Unread 19-11-2015, 22:50
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is online now
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,791
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: Pneumatics off board recharge packs

Guys,
The dominant 2015 rule here is...
R69 The compressor (permitted per R68) may be located off-board, however the compressor must still be controlled and powered by the ROBOT.
The compressor may be mounted on the ROBOT, or it may be left off the ROBOT and used to pre-charge compressed air in storage tanks on the ROBOT. The intent of this rule is to permit teams to take advantage of the weight savings associated with keeping the compressor off-board. However, using the compressor off-board of the ROBOT does NOT permit non-compliance with any other applicable rules.

In the past the interpretation has changed from year to year. It has been sometimes allowed to have the pressure switch and regulator off board provided the stored air on the robot is at the 60 psi pressure. Any other parts of the pneumatic system must be on the robot and controlled by the robot. This includes the battery and storage tanks. While the team above may use this arrangement (see photos) for demos and post season events, it is likely to be ruled illegal at an FRC event. Sorry.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 08:46.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi