Go to Post So let me get this straight. We'll have 6 hours to re-build an entirely new robot that took us 6 weeks originally to make. - [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #37   Spotlight this post!  
Unread 20-11-2015, 17:58
gblake's Avatar
gblake gblake is online now
6th Gear Developer; Mentor
AKA: Blake Ross
no team (6th Gear)
Team Role: Mentor
 
Join Date: May 2006
Rookie Year: 2006
Location: Virginia
Posts: 1,933
gblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond repute
Re: Mythical Six Week Build Season

Quote:
Originally Posted by Michael Corsetto View Post
Blake,

You are completely right, there is an overwhelming evidence that adjusting the days on the calendar is not the only dimension for "ways-to-improve-build-seasons (and the students and the robots that build-seasons produce)".

My question is:

Will removing stop-build be one of the many "ways-to-improve-build-seasons (and the students and the robots that build-seasons produce)", or is it one of the "ways-to-NOT-improve-build-seasons (and the students and the robots that build-seasons produce)"?

I am proposing this:

Removing stop-build is simply one of many "ways-to-improve-build-seasons (and the students and the robots that build-seasons produce)"

...
-Mike
A) because I believe lengthening the build season is so unlikely (for an overwhelming majority of the teams) to affect the root causes and symptoms that people are hoping to affect, and
B) because I focus on FIRST's as a program that uses competitions, but doesn't exist to *be* competitions; I think we should park lengthening-the-build-season in the examined-but-rejected-because-of-very-low-ROI pile.

We/FIRST have better/bigger fish to fry. YMMV

Blake
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 19:55.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi