|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
|
|
Thread Tools | Rate Thread | Display Modes |
|
|
|
#1
|
|||
|
|||
|
Re: Advice For Agile/Scrum Robot Development
I see the benefits mostly in breaking down the big tasks into smaller, manageable sprints each with smaller stories, broken further into tasks. At work, a task should be something that one developer could do in a day or two. A sprint would be about two weeks.
For FRC, perhaps a sprint is a week, maybe two. A task could be a chunk of work that one student could do in one build meeting, whether that's a 3-hour evening or an 8-hour day or however your team works. For example, your first sprint could have three stories and look something like: Sprint 1: - Assemble the KOP chassis --- Cut the frame pieces to size --- Assemble the frame and cross pieces --- Assemble motors and gearboxes - Wire up the control system --- Build battery cable and circuit breaker connector --- Connect the PCM, VRM, PDP --- Wire the RoboRio power and CAN --- Connect the bridge --- Connect the motor controllers - Prototype mechanism idea --- Build plywood frame --- Build wheel and axle driven by drill motor --- Experiments to determine best placement |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|