Go to Post When I encounter Dave at competitions and meetings, I find him to be kind, helpful, almost too nice. When I read his hints, I find him to be EVIL! - Ken Loyd [more]
Home
Go Back   Chief Delphi > Technical > Technical Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 20-01-2016, 08:14
GeeTwo's Avatar
GeeTwo GeeTwo is offline
Technical Director
AKA: Gus Michel II
FRC #3946 (Tiger Robotics)
Team Role: Mentor
 
Join Date: Jan 2014
Rookie Year: 2013
Location: Slidell, LA
Posts: 3,666
GeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond repute
Re: Question about placement of bumpers

Quote:
Originally Posted by juju_beans View Post
Ok thanks! Our plan is to have some pneumatics that can lift 2 ft pull the robot up and with yhe bumpers slightly up, it will start ud off at maybe 6 in off the ground already. As for the middle wheel, we will have to takr out the wheel bearings to push the shaft in farther.
If I understand correctly, that would violate either R2 or R21G. (Emphasis mine)

Quote:
Originally Posted by R2
The ROBOT must have a FRAME PERIMETER, contained within the BUMPER ZONE, that is comprised of fixed, non-articulated structural elements of the ROBOT. Minor protrusions no greater than ¼ in. such as bolt heads, fastener ends, and rivets are not considered part of the FRAME PERIMETER.
Quote:
Originally Posted by R21
BUMPERS must be constructed as follows (see Figure 4-7):
.
.
  • G. must attach to the FRAME PERIMETER of the ROBOT with a rigid fastening system to form a tight, robust connection to the main structure/frame (e.g. not attached with hook-and-loop, tape, or tie-wraps). The attachment system must be designed to withstand vigorous game play. All removable fasteners (e.g. bolts, locking pins, pip-pins, etc.) will be considered part of the BUMPERS.
Also see the blue box under R22 (part of Team Update 1).
__________________

If you can't find time to do it right, how are you going to find time to do it over?
If you don't pass it on, it never happened.
Robots are great, but inspiration is the reason we're here.
Friends don't let friends use master links.
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 02:38.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi