|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
|
|
Thread Tools | Rate Thread | Display Modes |
|
|
|
#1
|
|||
|
|||
|
Re: Rhino Track Belt Replacement
Our team always builds fully-modular drive trains so that if anything fails spectacularly, we can have it entirely apart, replaced, and put back together in a short timeframe.
We have a bot with Rhino Treads this year and we didn't change our drive train plan at all. We still have two fully-modular drive pods so that if we break a belt, it comes apart, is replaced, and goes back onto the robot with ease. You can see the insides of one drive pod in a picture here. |
|
#2
|
||||||
|
||||||
|
Re: Rhino Track Belt Replacement
West Coast Tank Drive
![]() |
|
#3
|
|||
|
|||
|
Re: Rhino Track Belt Replacement
Our tank system is plug and play... well theoretically. We should be able to swap out the entire tread in the queuing line (though I hope it never comes to that). Actually replacing the belt might take 1/2 hour to an hour later though.
|
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|