|
Re: Team Update 14 (2016)
Quote:
Originally Posted by Chris is me
Who's going to perform better though - the team that copied a robot off of a few photos in 5 weeks, or the team that built their own robot in 12 weeks, with several iterations and weeks of drive practice and tuning?
Being good at FRC consists of so, so much more than the actual design of the robot. Too much emphasis is placed on the high level robot concept being the absolute key to success, when it is ALL in the implementation and the details.
|
Oh I totally agree with you. My point was simply that teams will do it.
__________________
"The best way to predict the future is design it"
"Striving for excellence through inspiration"
|