Go to Post I can neither confirm nor deny that I've worked on alot of pretty cool stuff. - Gary Dillard [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 08-03-2016, 23:14
Jon Stratis's Avatar
Jon Stratis Jon Stratis is offline
Electrical/Programming Mentor
FRC #2177 (The Robettes)
Team Role: Mentor
 
Join Date: Feb 2007
Rookie Year: 2006
Location: Minnesota
Posts: 3,719
Jon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond repute
Re: Al's 2016 Inspection Thread

Quote:
Originally Posted by dradel View Post
I understand where you are coming from, but it is an example. My point is if the rule doesn't explicitly say it is open for interpretation, or opinions which leads to issues.

Similarly there is no official rule on where the main breaker has to be, and for the rule book to say "strongly recommend" doesn't mean has to be.

It becomes frustrating when others don't "feel" that the breaker or dump valve aren't in the correct place. If the rules aren't going to be explicit about such things then how can teams "fail" inspection? It's kind of like trying to say something isn't art.
The rule on the main breaker isn't "strongly recommend".

Quote:
R39 The 120A circuit breaker must be quickly accessible from the exterior of the ROBOT. This is the only 120A circuit breaker allowed on the ROBOT.
It's "must be". I will grant you that "quickly accessible" is a judgement call on the part of the inspector... But I can't think of a way to word such a rule as to remove judgement from the equation. All robots are designed differently, and a location that works on one won't work on another. The bottom line with this rule is how you want the event staff to handle your robot should it start smoking - pull out the fire extinguisher and give your electronics a dousing, or kill power quickly and safely? One way you'll likely be back on the field for your next match. The other is a huge mess.

Honestly, I've never had a problem getting a team to move their main breaker or vent plug valve to someplace more accessible. They all seem to understand the safety reasons (at least, the mentors do) for it and comply quickly and willingly.


Now, I have to ask... why is it such a big deal to have the vent plug valve on the low side? What do you get from that that other teams don't get by having theirs on the high side? Why not just hook up the pneumatics similar to figure 4-15 like everyone else to begin with? You seem to be very adamant about this, yet your robot has already been changed to have it on the high side...
__________________
2007 - Present: Mentor, 2177 The Robettes
LRI: North Star 2012-2016; Lake Superior 2013-2014; MN State Tournament 2013-2014, 2016; Galileo 2016; Iowa 2017
2015: North Star Regional Volunteer of the Year
2016: Lake Superior WFFA
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 15:37.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi