Go to Post Robots aside, how we handle these situations, communicate with one another, resolve differences and potential conflict, and overcome obstacles defines us all as people. Remember the big picture and have fun. - Rich Kressly [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 29-06-2016, 12:23
GreyingJay GreyingJay is offline
Robonut
AKA: Mr. Lam
FRC #2706 (Merge Robotics)
Team Role: Mentor
 
Join Date: Mar 2015
Rookie Year: 2015
Location: Ottawa, Canada
Posts: 733
GreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond repute
Re: 1241 THEORY6 2016 CAD and Prototype Resources Release

Very nice! You were fun to compete against in North Bay - tough competition, but if we had to get knocked out of the semifinals, at least it was by the best ones there!
__________________
"If I'm going to mentor someone, I'm going to be involved in their life as a positive force." -Mechvet
Reply With Quote
  #2   Spotlight this post!  
Unread 29-06-2016, 12:45
mr.roboto2826's Avatar
mr.roboto2826 mr.roboto2826 is offline
Registered User
AKA: Niklas Olsen
FRC #0148 (Robowranglers)
Team Role: Mentor
 
Join Date: Apr 2009
Rookie Year: 2009
Location: Greenville, TX
Posts: 54
mr.roboto2826 is just really nicemr.roboto2826 is just really nicemr.roboto2826 is just really nicemr.roboto2826 is just really nicemr.roboto2826 is just really nice
Re: 1241 THEORY6 2016 CAD and Prototype Resources Release

Would you be able to explain the timeline you guys went through to produce your prototype robot so quickly? How many people were involved with prototype CAD? 8 days seems incredibly quick to turn out a fully working prototype (none the less a fully competitive one). Great work, one of my favorite robots this year!
__________________
First Updates Now Shows Producer.
Watch and Listen to FUN on Youtube, iTunes, and www.firstupdatesnow.com
Reply With Quote
  #3   Spotlight this post!  
Unread 29-06-2016, 13:30
Jash_J's Avatar
Jash_J Jash_J is offline
Lead Strategist
FRC #1241 (THEORY6)
Team Role: Mentor
 
Join Date: Dec 2010
Rookie Year: 2009
Location: Mississauga, ON, Canada
Posts: 54
Jash_J has much to be proud ofJash_J has much to be proud ofJash_J has much to be proud ofJash_J has much to be proud ofJash_J has much to be proud ofJash_J has much to be proud ofJash_J has much to be proud ofJash_J has much to be proud ofJash_J has much to be proud ofJash_J has much to be proud of
Re: 1241 THEORY6 2016 CAD and Prototype Resources Release

Quote:
Originally Posted by OccamzRazor View Post
That is an excellent prototype! I can see how you had one of the best robots in the world this time around. Out of curiosity, which week did you have that prototype completed?
The prototype was completed by the end of week 1.

Quote:
Originally Posted by mr.roboto2826 View Post
Would you be able to explain the timeline you guys went through to produce your prototype robot so quickly? How many people were involved with prototype CAD? 8 days seems incredibly quick to turn out a fully working prototype (none the less a fully competitive one). Great work, one of my favorite robots this year!
Day 1 :
- Read/understand the rules
- Scoring analysis and determine game play strategy
- Outline clear needs, wants and wishes for what the overall robot should include.

Day 2:
- Determined detail requirements for each sub assembly of the robot
- Broke off into groups and brainstormed various ideas for each sub assembly
- These ideas were presented and voted for. Ideas with the most votes are prototyped
- Parametric analysis is conducted

Day 3-4:
- CAD prototype - About 10 students were involved in this, 2 students per subgroup (drive, intake, conveyor, popper, shooter).

Day 5-7:
- Build prototype

Day 7-8:
- Test Prototype

In order to survive the first week, we included things to look forward to such as a mentor vs student dodgeball game at the end of the first week. We also ensured the students had different food to eat every day when they came in (aka, not just pizza) - they were quite happy about this.
__________________
Jash Javeri
FRC Team 1241 - Mentor/Alumnus
2013 World Champions! (1241, 1477, 610)

"Coming together is a beginning. Keeping together is progress. Working together is success." - Henry Ford

"I'm a great believer in luck, and I find the harder I work the more I have of it." - Thomas Jefferson

Last edited by Jash_J : 29-06-2016 at 13:33.
Reply With Quote
  #4   Spotlight this post!  
Unread 29-06-2016, 14:41
GreyingJay GreyingJay is offline
Robonut
AKA: Mr. Lam
FRC #2706 (Merge Robotics)
Team Role: Mentor
 
Join Date: Mar 2015
Rookie Year: 2015
Location: Ottawa, Canada
Posts: 733
GreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond reputeGreyingJay has a reputation beyond repute
Re: 1241 THEORY6 2016 CAD and Prototype Resources Release

Quote:
Originally Posted by Jash_J View Post
In order to survive the first week, we included things to look forward to such as a mentor vs student dodgeball game at the end of the first week. We also ensured the students had different food to eat every day when they came in (aka, not just pizza) - they were quite happy about this.
The team I was on last year made it a point to enlist parents' help to provide team meals during build season. Each family would sign up for a different night in rotation. We really enjoyed having a different hot meal each night, and we saw lots of cultural diversity represented: butter chicken, stir fried noodles, pulled pork, perogies, lasagna, pasta, ...

We also discovered that gathering everyone together for a meal was the perfect time to do team meetings and status reports. We didn't do the meals this year due to the nature of our build space, and we really missed that team touchpoint.
__________________
"If I'm going to mentor someone, I'm going to be involved in their life as a positive force." -Mechvet
Reply With Quote
  #5   Spotlight this post!  
Unread 29-06-2016, 15:20
frcguy's Avatar
frcguy frcguy is offline
Unregistered Unuser
AKA: Nicholas Dal Porto
FRC #5940 (B.R.E.A.D.)
Team Role: Tactician
 
Join Date: Dec 2015
Rookie Year: 2012
Location: Burlingame, California
Posts: 831
frcguy has a reputation beyond reputefrcguy has a reputation beyond reputefrcguy has a reputation beyond reputefrcguy has a reputation beyond reputefrcguy has a reputation beyond reputefrcguy has a reputation beyond reputefrcguy has a reputation beyond reputefrcguy has a reputation beyond reputefrcguy has a reputation beyond reputefrcguy has a reputation beyond reputefrcguy has a reputation beyond repute
Re: 1241 THEORY6 2016 CAD and Prototype Resources Release

Quote:
Originally Posted by GreyingJay View Post
The team I was on last year made it a point to enlist parents' help to provide team meals during build season. Each family would sign up for a different night in rotation. We really enjoyed having a different hot meal each night, and we saw lots of cultural diversity represented: butter chicken, stir fried noodles, pulled pork, perogies, lasagna, pasta, ...
+2. We did the same thing and it was great.
__________________


2016: Team 5940 (Silicon Valley Regional Rookie All-Star and Quarterfinalist, Curie Quarterfinalist)

Volunteer: 2016 (Chezy Champs Field Reset, Capital City Classic FTA, MadTown ThrowDown FTA)
Reply With Quote
  #6   Spotlight this post!  
Unread 04-07-2016, 03:42
Sudesh Sahu Sudesh Sahu is offline
Registered User
FRC #4213 (MetalCow Robotics)
Team Role: Leadership
 
Join Date: Jul 2016
Rookie Year: 2014
Location: Normal IL
Posts: 1
Sudesh Sahu is an unknown quantity at this point
Re: 1241 THEORY6 2016 CAD and Prototype Resources Release

Quote:
Originally Posted by Jash_J View Post
Day 2:
- Determined detail requirements for each sub assembly of the robot
- Broke off into groups and brainstormed various ideas for each sub assembly
- These ideas were presented and voted for. Ideas with the most votes are prototyped
- Parametric analysis is conducted
In Day 2 you say that parametric analysis was done. What exactly does that mean and what specifically did it include for you this year? Also, around how many hours does your team work per day during the first week?
Reply With Quote
  #7   Spotlight this post!  
Unread 04-07-2016, 20:55
MalavyaS's Avatar
MalavyaS MalavyaS is offline
Lead Engineering Mentor
FRC #1241 (THEORY6)
Team Role: Mentor
 
Join Date: Jul 2016
Rookie Year: 2007
Location: Mississauga, Ontario
Posts: 2
MalavyaS has much to be proud ofMalavyaS has much to be proud ofMalavyaS has much to be proud ofMalavyaS has much to be proud ofMalavyaS has much to be proud ofMalavyaS has much to be proud ofMalavyaS has much to be proud ofMalavyaS has much to be proud ofMalavyaS has much to be proud ofMalavyaS has much to be proud of
Re: 1241 THEORY6 2016 CAD and Prototype Resources Release

Quote:
Originally Posted by Sudesh Sahu View Post
In Day 2 you say that parametric analysis was done. What exactly does that mean and what specifically did it include for you this year? Also, around how many hours does your team work per day during the first week?
Hi Sudesh,

For us, parametric studies include 2 aspects:
-Standard Kinematic calculations using excel spreadsheets
-Simple 2D sketches showing geometry of systems that can be manipulated easily to show valuable information

The parametric studies essentially give us a starting point for the prototype CAD and things to look out for once built. It gives us approximate dimensions for key features, while also telling us which features we have to experiment with/optimize using our prototype.

We completed parametric studies for all of our subsystems this year.

Shooter:
-Projectile Motion spreadsheet to determine wheel rpm, launch angles, height of shooter from floor.
-2D sketches outlining ball path through the popper and shooter, showing us pinch values, and dimensions for flywheels/shooter arch etc.

Variables to be confirmed using Protoype: Shooter angles, number of wheels, RPM

Inake:
-Complete 2D sketches showing pivot point and overall geometry of the system, including roller locations, and bumper height approximations.This helped us determine the dimensions/geometry needed to defeat the cheval, portcullis, sally port, and drawbridge
-Torque calculations for determining gear ratios in order to allow the intake arm to lift our robot (mix of both 2D sketches and excel spreadsheet)

Variables to be confirmed using Prototype: Make sure geometry works + Hooks for drawbrige + durability tests in terms of strengths (we ran our intake prototype into the wall approximately 1000 times to inspect damage)

Drive:
-Kinematic spreadsheet outlining gear ratios for achieving our desired acceleration and top speed
-2D sketches showing initial drivetrain geometry going over all the defences to check for lengths, clearances, and wedge angle.

Variables to be confirmed using prototype: Center to center distance between wheels: 11" vs 10" (which we ended up choosing)

Hours of work during Prototype Week:
Kick off Saturday/Sunday: Approximately 11-12 hours per day
Monday - Tuesday (Cadding Prototype): Approximately 8 hours per day
Wednesday - Friday (Building Protoype): Approximately 5-6 hours per day
Week 1 Saturday/Sunday (Testing): Approximately 8 hours per day

Let me know if you have more questions!
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 10:33.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi