|
Re: [FIRST EMAIL] Stop Build Day Survey
I'd just like to mention one more thing that could play an impact: how we talk about FRC. A lot of times, when I'm describing FRC to people not involved with it, a big part I mention is the 6 weeks aspect. I think that really drives home the point that not only are we doing something really cool and hard, but also in a very limited amount of time. I definetly think that for outreach, the "6 weeks" aspect helps in attracting people to an even cooler thing. Something to think about.
__________________
2016 - NE District Championship Entrepreneurship Award
2016 - Hartford District Industrial Design Award
2016 - Waterbury District Engineering Inspiration Award
|