Go to Post It's a shame that this is likely the year that sacred ground will be touched by that unworthy drive :rolleyes: - AdamHeard [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rating: Thread Rating: 10 votes, 2.60 average. Display Modes
  #181   Spotlight this post!  
Unread 07-09-2016, 23:22
gblake's Avatar
gblake gblake is offline
6th Gear Developer; Mentor
AKA: Blake Ross
no team (6th Gear)
Team Role: Mentor
 
Join Date: May 2006
Rookie Year: 2006
Location: Virginia
Posts: 1,934
gblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond repute
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by Joe Johnson View Post
Nah. Not so much.

Scoring points in matches is simply not the correct proxy/metric to use to gauge the success of FRC teams.

There are at least two kinds of people in the world. I am one kind.

Side note, I'm really, really growing weary of seeing the words "competitive" and "elite" in discussions like this. To me they are red flags. YMMV.

PS: I hope FIRST soon realizes the survey's results will be worse than useless. They will be harmful, not neutral or helpful.
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate

Last edited by gblake : 08-09-2016 at 00:08.
Reply With Quote
  #182   Spotlight this post!  
Unread 07-09-2016, 23:25
dirtbikerxz's Avatar
dirtbikerxz dirtbikerxz is offline
Captain | Driver | CAD | Junior
AKA: Rohit Gondi
FRC #3991 (KnightVision)
Team Role: Driver
 
Join Date: Nov 2014
Rookie Year: 2015
Location: Baton Rouge, LA
Posts: 445
dirtbikerxz has much to be proud ofdirtbikerxz has much to be proud ofdirtbikerxz has much to be proud ofdirtbikerxz has much to be proud ofdirtbikerxz has much to be proud ofdirtbikerxz has much to be proud ofdirtbikerxz has much to be proud ofdirtbikerxz has much to be proud ofdirtbikerxz has much to be proud ofdirtbikerxz has much to be proud of
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by AllenGregoryIV View Post
Do you currently not feel pressure to work on your WITHHOLDING ALLOWANCE past the stop build date? The rules in place today allow all teams to continue to work on the robot. The rule book encourages development of programming software after the "Stop Build Day" after the date as well.
We do work on the allowance, but it does limit the teams, instead of allowing free reign on the bot. With some of the withholding allowance we made this year, it took us most of the thursday before a regional to get it properly mounted and tested on the bot. Which costed us valuable practice time. We effectively traded practice time to add more functions to the bot. It would not have been the same "challenge" if we were allowed to work on the bot the whole time.
__________________

Team 3991: Driver since freshman (2015-), Captain since sophomore (2016-), CADer
"The human condition is not perfect. We are not perfect specimens, any of us. We're not robots." - Michael Ovitz
My posts may or may not reflect the views of my team, they are my opinions, and mine alone.
Reply With Quote
  #183   Spotlight this post!  
Unread 07-09-2016, 23:27
Hitchhiker 42's Avatar
Hitchhiker 42 Hitchhiker 42 is online now
Roboter
AKA: Mark Lavrentyev
FRC #4557 (FullMetal Falcons)
Team Role: Programmer
 
Join Date: Oct 2015
Rookie Year: 2015
Location: Cromwell, CT
Posts: 477
Hitchhiker 42 is a splendid one to beholdHitchhiker 42 is a splendid one to beholdHitchhiker 42 is a splendid one to beholdHitchhiker 42 is a splendid one to beholdHitchhiker 42 is a splendid one to beholdHitchhiker 42 is a splendid one to beholdHitchhiker 42 is a splendid one to beholdHitchhiker 42 is a splendid one to behold
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by AllenGregoryIV View Post
Do you currently not feel pressure to work on your WITHHOLDING ALLOWANCE past the stop build date? The rules in place today allow all teams to continue to work on the robot. The rule book encourages development of programming software after the "Stop Build Day" after the date as well.
The difference here is that no auto testing/driving practice can be done, which is typically the bulk of what needs to be done towards the end of build season.
__________________



2016 - NE District Championship Entrepreneurship Award
2016 - Hartford District Industrial Design Award
2016 - Waterbury District Engineering Inspiration Award
Reply With Quote
  #184   Spotlight this post!  
Unread 07-09-2016, 23:29
AllenGregoryIV's Avatar
AllenGregoryIV AllenGregoryIV is offline
Engineering Coach
AKA: Allen "JAG" Gregory
FRC #3847 (Spectrum)
Team Role: Coach
 
Join Date: Jul 2008
Rookie Year: 2003
Location: Texas
Posts: 2,549
AllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond repute
Send a message via AIM to AllenGregoryIV
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by dirtbikerxz View Post
We do work on the allowance, but it does limit the teams, instead of allowing free reign on the bot. With some of the withholding allowance we made this year, it took us most of the thursday before a regional to get it properly mounted and tested on the bot. Which costed us valuable practice time. We effectively traded practice time to add more functions to the bot. It would not have been the same "challenge" if we were allowed to work on the bot the whole time.
Of course it would not be the same challenge, that's why we should get rid of the bag, because it's an artificially harder challenge for lower and mid tier teams than it is for the best teams in the world. Having more money, members, mentor, and resources makes it possible to build longer and produce a better robot.
__________________

Team 647 | Cyber Wolf Corps | Alumni | 2003-2006 | Shoemaker HS
Team 2587 | DiscoBots | Mentor | 2008-2011 | Rice University / Houston Food Bank
Team 3847 | Spectrum | Coach | 2012-20... | St Agnes Academy
LRI | Alamo Regional | 2014-20...
"Competition has been shown to be useful up to a certain point and no further, but cooperation, which is the thing we must strive for today, begins where competition leaves off." - Franklin D. Roosevelt
Reply With Quote
  #185   Spotlight this post!  
Unread 07-09-2016, 23:33
gblake's Avatar
gblake gblake is offline
6th Gear Developer; Mentor
AKA: Blake Ross
no team (6th Gear)
Team Role: Mentor
 
Join Date: May 2006
Rookie Year: 2006
Location: Virginia
Posts: 1,934
gblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond repute
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by AllenGregoryIV View Post
Taken from Jim Zondag's excellent paper. Discussion on the paper is here.


Claiming six weeks when so many teams use the WITHHOLDING ALLOWANCE, practice bots, multiple competitions, and more to extend their build season isn't just PR cover up, it's a lie.
OK. Change/fix it by eliminating those things.

Eliminating SBD is hardly the only course available.
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
Reply With Quote
  #186   Spotlight this post!  
Unread 07-09-2016, 23:36
Oblarg Oblarg is offline
Registered User
AKA: Eli Barnett
FRC #0449 (The Blair Robot Project)
Team Role: Mentor
 
Join Date: Mar 2009
Rookie Year: 2008
Location: Philadelphia, PA
Posts: 1,050
Oblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond repute
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by gblake View Post
OK. Change/fix it by eliminating those things.

Eliminating SBD is hardly the only course available.
No, but eliminating SBD is the one that is probably the least-disruptive to existing team build schedules and the one that is least-likely to continue to impact teams in a regressive way.
__________________
"Mmmmm, chain grease and aluminum shavings..."
"The breakfast of champions!"

Member, FRC Team 449: 2007-2010
Drive Mechanics Lead, FRC Team 449: 2009-2010
Alumnus/Technical Mentor, FRC Team 449: 2010-Present
Lead Technical Mentor, FRC Team 4464: 2012-2015
Technical Mentor, FRC Team 5830: 2015-2016
Reply With Quote
  #187   Spotlight this post!  
Unread 07-09-2016, 23:36
PayneTrain's Avatar
PayneTrain PayneTrain is offline
Trickle-Down CMP Allocation
AKA: Lizard King
FRC #0422 (The Meme Tech Pneumatic Devices)
Team Role: Mascot
 
Join Date: Mar 2010
Rookie Year: 2009
Location: RVA
Posts: 2,239
PayneTrain has a reputation beyond reputePayneTrain has a reputation beyond reputePayneTrain has a reputation beyond reputePayneTrain has a reputation beyond reputePayneTrain has a reputation beyond reputePayneTrain has a reputation beyond reputePayneTrain has a reputation beyond reputePayneTrain has a reputation beyond reputePayneTrain has a reputation beyond reputePayneTrain has a reputation beyond reputePayneTrain has a reputation beyond repute
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by AllenGregoryIV View Post
To the previous comments, I'm not trolling anyone. I truly believe that FIRST (HQ and the community) needs to stop telling people it's a 6 week build season.
For an example of this, I recall that 254 loaned HQ their 2014 World Championship robot to be put on display in Manchester. With the knowledge of that paired with the idea that FIRST touts the idea of the 6 week build season in marketing endeavors, imagine someone pitching a potential supporter of FIRST and including in the pitch

*points*
"Can you believe kids built that in 6 weeks?"
*disbelief on part of potential supporter*

In reading 254's documentation, you would know that disbelief at that quote is well-founded.

We have the habit of telling people how this will be the hardest thing their child will have ever done in their educational career (even though they go to one of the most rigorous schools in the country, the greater your participation on 422, the greater difficulty a student will have at succeeding at much else besides the robots and school). We are still able to bring together a large, strong, and passionate team that performs less bad every year for the most part.

More power to teams that actually tell potential stakeholders you only meet for 45 days plus events and actually stick to that. If you are a team that tells potential stakeholders you only meet for 45 days for build plus events and then you don't, and you keep doing that? You are part of the problem.
Reply With Quote
  #188   Spotlight this post!  
Unread 07-09-2016, 23:37
AllenGregoryIV's Avatar
AllenGregoryIV AllenGregoryIV is offline
Engineering Coach
AKA: Allen "JAG" Gregory
FRC #3847 (Spectrum)
Team Role: Coach
 
Join Date: Jul 2008
Rookie Year: 2003
Location: Texas
Posts: 2,549
AllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond repute
Send a message via AIM to AllenGregoryIV
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by gblake View Post
OK. Change/fix it by eliminating those things.

Eliminating SBD is hardly the only course available.
Please feel free to propose other courses of action.
__________________

Team 647 | Cyber Wolf Corps | Alumni | 2003-2006 | Shoemaker HS
Team 2587 | DiscoBots | Mentor | 2008-2011 | Rice University / Houston Food Bank
Team 3847 | Spectrum | Coach | 2012-20... | St Agnes Academy
LRI | Alamo Regional | 2014-20...
"Competition has been shown to be useful up to a certain point and no further, but cooperation, which is the thing we must strive for today, begins where competition leaves off." - Franklin D. Roosevelt
Reply With Quote
  #189   Spotlight this post!  
Unread 07-09-2016, 23:48
asid61's Avatar
asid61 asid61 is offline
Registered User
AKA: Anand Rajamani
FRC #0115 (MVRT)
Team Role: Mechanical
 
Join Date: Jan 2014
Rookie Year: 2013
Location: Cupertino, CA
Posts: 2,216
asid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond repute
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by AllenGregoryIV View Post
Please feel free to propose other courses of action.
I believe Jim Zondag's paper had something in it about giving all teams 8 hours of unbag time each week, to offset the advantage teams get from working on the bot at competitions.
__________________
<Now accepting CAD requests and commissions>


Last edited by asid61 : 07-09-2016 at 23:50.
Reply With Quote
  #190   Spotlight this post!  
Unread 07-09-2016, 23:51
AllenGregoryIV's Avatar
AllenGregoryIV AllenGregoryIV is offline
Engineering Coach
AKA: Allen "JAG" Gregory
FRC #3847 (Spectrum)
Team Role: Coach
 
Join Date: Jul 2008
Rookie Year: 2003
Location: Texas
Posts: 2,549
AllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond repute
Send a message via AIM to AllenGregoryIV
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by asid61 View Post
I believe Jim Zondag's paper had something in it about giving all teams 8 hours of unbag time.
He was suggesting eliminating WITHHOLDING ALLOWANCE, and other ways that teams are able to build longer. I don't believe he was suggesting other ways to expand robot access. I believe Zondag's proposal would be a great step forward.
__________________

Team 647 | Cyber Wolf Corps | Alumni | 2003-2006 | Shoemaker HS
Team 2587 | DiscoBots | Mentor | 2008-2011 | Rice University / Houston Food Bank
Team 3847 | Spectrum | Coach | 2012-20... | St Agnes Academy
LRI | Alamo Regional | 2014-20...
"Competition has been shown to be useful up to a certain point and no further, but cooperation, which is the thing we must strive for today, begins where competition leaves off." - Franklin D. Roosevelt
Reply With Quote
  #191   Spotlight this post!  
Unread 07-09-2016, 23:53
EricH's Avatar
EricH EricH is offline
New year, new team
FRC #1197 (Torbots)
Team Role: Engineer
 
Join Date: Jan 2005
Rookie Year: 2003
Location: SoCal
Posts: 19,732
EricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond repute
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by AllenGregoryIV View Post
Please feel free to propose other courses of action.
He did.

Let's start with the Witholding Allowance. 30 lb? .25 robot? Nope. Particularly with the amount of COTS items these days, that's a LOT. 12 lb, or .1 robot, would make teams think a lot more about what they're holding back to work on. No limits on raw materials/COTS items--but, you know, you do need to do work on those at the event for them to be useful, even if it is just duct-taping them to your robot. (That's just an example weight, BTW--could be 15, 10, 5, 0... less than 30, though.)

Eliminating multiple competitions is an answer--but, TBH, the howling would pretty quickly convince HQ that that was a very, very bad idea. The "obvious" alternative would be districts for everybody, mind you--not that I'm opposed to that. (Since X cannot be eliminated, it shall henceforth be required, and all that.) BUT, you'd have to get rid of the unbag time before events. (Or count it as part of build season--as in, we have a 6-week build season, plus some quick check time right before competition.)

Practice robots aren't going to be easy to eliminate. There's practically nothing that can be done other than to specifically tell the teams that "We are putting in a rule that says you cannot have a practice robot, and we are making you sign a legally binding document at inspection that says that you adhered to all the rules." And then, of course, trust that they follow the rule. (And I would take a pretty good gamble that if Frank made THAT announcement, the Team Advocate--and Frank--would be swamped within 47 minutes by angry team emails.) Wouldn't try that.

Eliminating Stop Build isn't the only course of action. But continuing to insist that it is means that you've got blinders on.
__________________
Past teams:
2003-2007: FRC0330 BeachBots
2008: FRC1135 Shmoebotics
2012: FRC4046 Schroedinger's Dragons

"Rockets are tricky..."--Elon Musk

Reply With Quote
  #192   Spotlight this post!  
Unread 08-09-2016, 00:03
gblake's Avatar
gblake gblake is offline
6th Gear Developer; Mentor
AKA: Blake Ross
no team (6th Gear)
Team Role: Mentor
 
Join Date: May 2006
Rookie Year: 2006
Location: Virginia
Posts: 1,934
gblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond repute
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by AllenGregoryIV View Post
Please feel free to propose other courses of action.
Hmmmm, maybe return to some of the the previous rules that governed robot construction, give or take some tweaks different from the current tweaks?

Maybe, implement some suggestions I proposed in other similar discussions.

This is an old topic that is a magnet for specious arguments, and is a long dead horse; constantly rehashed here on CD by a tiny, egregiously-lopsided fraction of the total FRC participants.* I haven't spotted a single new idea or argument in this iteration of the conversation.**

Surely neither I nor any other proponents or opponents if SBD/etc.need to repeat what has already been said a zillion times before. Instead this entire thread should be just a collection of hyperlinks to past posts.

What the subject needs is some rigorous, properly-conducted research by an unbiased investigator(s), advised by the people who created, and still guide, the program.

Doesn't that sound reasonable? It's hard to argue against asking for good science/engineering experiments; but it's easy to argue that this thread isn't going to turn into one.

Blake
* I'm painting myself with this broad brush, along with painting the rest of us.
** I read many posts. I skimmed through many posts. I might have missed something novel among them. I'm human, and not perfect.
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate

Last edited by gblake : 08-09-2016 at 00:22.
Reply With Quote
  #193   Spotlight this post!  
Unread 08-09-2016, 00:05
AllenGregoryIV's Avatar
AllenGregoryIV AllenGregoryIV is offline
Engineering Coach
AKA: Allen "JAG" Gregory
FRC #3847 (Spectrum)
Team Role: Coach
 
Join Date: Jul 2008
Rookie Year: 2003
Location: Texas
Posts: 2,549
AllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond reputeAllenGregoryIV has a reputation beyond repute
Send a message via AIM to AllenGregoryIV
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by EricH View Post
Eliminating Stop Build isn't the only course of action. But continuing to insist that it is means that you've got blinders on.
The course of action we are talking about is a way to make claiming "robots built in 6 weeks" be the truth. "Stop Build Day" is a separate issue at this point. Unless we can actually stop all robot building and not allow changes on the robot at around Noon eastern time 42 days after kickoff. I don't see how we can do that. There are other possible options, we could magically have everyone compete right at the end of build season, it would require 100s of simultaneous events world wide. I don't think its in any way realistic but at that point I could see "6 week" being the truth.

A bigger point, it shouldn't matter. Very few teams meet every single of day of build season anyway. "6 weeks" is a talking point that has become a sales pitch and a false belief for new teams, mentors, and members. We don't need to hold this "6 week" thing so near and dear. It's not special. Building a ~150lbs robot in around 4 months (113 Days last year) with a group of high school students and mentors is still very impressive.
__________________

Team 647 | Cyber Wolf Corps | Alumni | 2003-2006 | Shoemaker HS
Team 2587 | DiscoBots | Mentor | 2008-2011 | Rice University / Houston Food Bank
Team 3847 | Spectrum | Coach | 2012-20... | St Agnes Academy
LRI | Alamo Regional | 2014-20...
"Competition has been shown to be useful up to a certain point and no further, but cooperation, which is the thing we must strive for today, begins where competition leaves off." - Franklin D. Roosevelt
Reply With Quote
  #194   Spotlight this post!  
Unread 08-09-2016, 00:05
fresh_prince fresh_prince is offline
Not allowed to navigate or DJ
AKA: Will Smith
FRC #3847 (Spectrum)
Team Role: Student
 
Join Date: Apr 2014
Rookie Year: 2013
Location: Houston
Posts: 13
fresh_prince is an unknown quantity at this point
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by dirtbikerxz View Post
In all honesty, given extra time, would a team (no matter what they say about liking stop build day) actually stop building based on a internal bag day?
Quote:
Originally Posted by nerdrock101 View Post
we do spend time after stop build working on code and other small projects. However, it is with a much lower intensity than working on the actual bot simply because it is small projects.

Looking at these two quotes (and some of the discussion going on in the last ~2 dozen replies), it seems there was a bit of a ships-passing-in-the-night going on with the whole discussion about "6 weeks is/isn't a lie" and self-imposed limits.

Part of the argument that Allen presents in his 34 slides is that the 6 weeks (his 45.5 days) is already a sort of "super" internal limit. "Super" in that there are some hoops to jump through, but it is still in many ways an internal limit: each team chooses how much time and effort they put into development after Stop Build Day. Some teams choose to actually stop, some teams (as nerdrock mentioned above) choose to work on small improvements and modifications. Some, however, choose to make radical changes eg rebuilding entire robots at competition (speaking from experience, under Allen's mentorship myself and the other members of the 3847 pit crew completely changed our robot at the 2015 Arkansas Regional).

This is what's being referred to as the "myth of the 6 week build season" - the idea that it's as long and grueling as you make it.

If the man-hours given to development are already a matter of self-regulation and evaluation of a team's own response to that "competitive pressure," and if each team already responds in a different degree, there's no reason to expect that to change if we #BanTheBag. Teams will continue to respond to the same competitive pressure, albeit with a barrier removed that improves convenience. A team that already wasn't driven to bring in a new subsystem or some spare parts under withholding probably won't be that much more likely to actually go through with those plans under a Bag-Free regime, it just makes it easier for the teams that already wanted to but found it difficult to do so (lack of resources to test on practice robot, difficulty in preparing modifications for a robot you can't test them on, etc.).
__________________
AMDG, LTF

3847 - Spectrum | 2014-2017 | Student
Reply With Quote
  #195   Spotlight this post!  
Unread 08-09-2016, 00:21
efoote868 efoote868 is offline
foote stepped in
AKA: E. Foote
FRC #0868
Team Role: Mentor
 
Join Date: Mar 2006
Rookie Year: 2005
Location: Noblesville, IN
Posts: 1,385
efoote868 has a reputation beyond reputeefoote868 has a reputation beyond reputeefoote868 has a reputation beyond reputeefoote868 has a reputation beyond reputeefoote868 has a reputation beyond reputeefoote868 has a reputation beyond reputeefoote868 has a reputation beyond reputeefoote868 has a reputation beyond reputeefoote868 has a reputation beyond reputeefoote868 has a reputation beyond reputeefoote868 has a reputation beyond repute
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by fresh_prince View Post
If the man-hours given to development are already a matter of self-regulation and evaluation of a team's own response to that "competitive pressure," and if each team already responds in a different degree, there's no reason to expect that to change if we #BanTheBag.
Parkinson's law says otherwise, "work expands so as to fill the time available for its completion". If my team has an 8 week build season, we will use all 8 weeks of it. Furthermore, I speculate that we would require the entire team to participate for all 8 weeks, which would prevent students with other activities from joining the team.

The stop build day is the end of our build season. If the stop build day was removed, we would probably spend that extra 2 weeks prototyping, so that the final assembly gets done the night before competition, or early in the morning that very day.

Quote:
Originally Posted by fresh_prince View Post
Teams will continue to respond to the same competitive pressure, albeit with a barrier removed that improves convenience. A team that already wasn't driven to bring in a new subsystem or some spare parts under withholding probably won't be that much more likely to actually go through with those plans under a Bag-Free regime, it just makes it easier for the teams that already wanted to but found it difficult to do so (lack of resources to test on practice robot, difficulty in preparing modifications for a robot you can't test them on, etc.).
In my humble opinion, the pressures (and relief!) a team faces isn't the same without a stop build day, which is why I want to keep it.
__________________
Be Healthy. Never Stop Learning. Say It Like It Is. Own It.

Like our values? Flexware Innovation is looking for Automation Engineers. Check us out!
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 22:38.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi