|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
| Thread Tools | Rate Thread | Display Modes |
|
#1
|
|||||
|
|||||
|
Plywood and 2x4 Cutting Diagrams for Field Elements
Hi all,
In the event you want to build all (or some) of the field elements using the FIRST supplied drawings, I have prepared a cutting diagram. You can ungroup the individual sheets and rearrange the parts to build just what you need. https://www.dropbox.com/s/yb7pwdcgyj...ayout.dwg?dl=0 Hope that helps. Jason |
|
#2
|
|||
|
|||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
I am missing the specs on the "spring?" for the lift - is there a guide to the hardware for the field elements anywhere? Thanks for the cutting diagrams.
|
|
#3
|
|||
|
|||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
OMG! Thank you so much. For the past 3 years my team has decided to build at least half the field so that we can practice. This is so helpful!!!
Thank you so much! |
|
#4
|
|||
|
|||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
Quote:
Assembly instructions are here: https://firstfrc.blob.core.windows.n...amVersions.pdf Last edited by Deetman : 07-01-2017 at 16:06. |
|
#5
|
|||
|
|||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
Thank you so much for assembling this, it will help reduce waste a bunch!
|
|
#6
|
|||
|
|||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
The Peg Lift peg size is missing also. No specs on it
|
|
#7
|
|||
|
|||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
The peg lift peg is on page 9 of this document https://firstfrc.blob.core.windows.n...amVersions.pdf TE-17002-05
Please remember to refer to the official drawings for anything that may be missing or you have questions on. |
|
#8
|
|||||
|
|||||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
Quote:
Jason |
|
#9
|
|||
|
|||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
Quote:
|
|
#10
|
||||
|
||||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
FWIW, we generated a master bill of materials to help with getting the raw materials procured for making the team field elements. No guarantees on its correctness, but it was helpful for us.
https://drive.google.com/open?id=0By...GYwdmtYS3pSNlE |
|
#11
|
|||||
|
|||||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
Quote:
Jason |
|
#12
|
|||
|
|||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
How do I use the layouts drawn in blue and red to determine the exact number of pieces of plywood required to build the field elements? It appears only the 3/4" plywood is identified in the blue drawing. Are the red drawings all 1/2" plywood?
|
|
#13
|
||||
|
||||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
Quote:
|
|
#14
|
|||||
|
|||||
|
Re: Plywood and 2x4 Cutting Diagrams for Field Elements
Quote:
I recommend numbering each part as you cut it. Refer back to FIRST's drawings for details on the parts with holes or angle cuts. Note that the hole cut out of the top of the boiler is re-used to make the touch bracket at the top of the rope. It took two of us about five hours in a well-equipped wood shop to slice up all the parts, and a couple hours for teams of students to assemble them. Again, if you only want some of the elements, you can ungroup the various sheets and rearrange the pieces to get only those you want. I also expect that you'll be able to recreate functionally identical elements using alternate methods... Jason |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|