|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#1
|
|||
|
|||
|
QUESTION ABOUT LIFTS
Are pilots allowed to lift the lift to desired height even before the robot places a gear on it? For example, would I be able to lift it to two feet and have the robot place the gear on it while it's in that position?
|
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|