Control (programming/electrical) team is on schedule.
Build team is doing their best for the parts we have so far. Rep is on schedule. CAD is on schedule as far as I can tell. Things were behind in the middle, but we're quickly picking up. We'll likely be done before the scrimmage at this point, but we're on the edge if we have a bad day or 2. It's looking similar to last year at this point. |