|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
|
|
Thread Tools |
Rating:
|
Display Modes |
|
|
|
#1
|
|||
|
|||
|
So would 4 1/4 tracks be a waste of time?? Would 2 full-length tracks be better in terms power/effort convervation.
My idea is basically replace wheels wityh treads, gaining the traction of treads, and with less material on the ground, have less scrub and more speed (as with wheel) I am seeking a medium between a tank and a humvee, Am I wasting my time, or is the 1/4 half-track idea worth pursuing (or at least trying out) ?? As always, opinions on this idea are welcome. --Ben Mitchell |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Chassis Material/Construction | sanddrag | Technical Discussion | 51 | 05-12-2003 12:59 |
| "Automatic Transmission" | Madison | Technical Discussion | 70 | 24-11-2003 09:03 |
| how does crab drive work? | Soukup | Technical Discussion | 13 | 25-04-2003 11:31 |
| pic: Drive System | CD47-Bot | Robot Showcase | 3 | 27-02-2003 14:11 |
| "Motors and Drive train edition" of Fresh From the Forum | Ken Leung | CD Forum Support | 6 | 29-01-2002 12:32 |