Go to Post Some of them look like phone numbers... LETS START CALLING THEM ALL! - akoscielski3 [more]
Home
Go Back   Chief Delphi > Technical > Electrical
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #12   Spotlight this post!  
Unread 18-11-2003, 13:47
Dave Flowerday Dave Flowerday is offline
Software Engineer
VRC #0111 (Wildstang)
Team Role: Engineer
 
Join Date: Feb 2002
Rookie Year: 1995
Location: North Barrington, IL
Posts: 1,366
Dave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond repute
Quote:
Originally posted by Sachiel7
They may upgrade it so it does have a higher transfer rate, and It may not use 900MHz radios anymore (Although I'm not sure why they'd switch)
Pure speculation: I doubt they'll change the radios to be higher than 9600bps. My reasoning is that 9600 is "fast enough". The data from the OI gets to the robot in a short enough amount of time that it's not a noticeable delay to the operator. Sure, we'd all love to be able to pump back more data to the OI, but I doubt that's a big concern for IFI. Radios that run more than 9600bps are expensive. If anything, I'd guess that they'd change to radios that allowed more channels. They were getting really close to using all 40 channels at Houston last year, and that increases the risk that two different robot's signals will interfere with each other.
Quote:
I doubt that they're going to use the STAMPs that are in the OI now to continue with next year's PIC based system.
I'm not sure how this rumor got started (and I've seen it mentioned before in other threads), but the OI doesn't have a BASIC Stamp in it, and to my knowledge it never has. Think about it - why would they put a stamp in the OI? Stamps are considerably more expensive than other embedded processors, are a whole lot slower, and use a rather clumsy programming language.
Quote:
It also wouldn't make too much sense that the User_Routines.C Processes every 17ms if they're going to keep the transfer rate at 28ms.
Page 10 of the 2004 Programming Reference Guide actually says that Process_Data_From_Master_uP() runs at 17ms on the EDUbot only. It specifically states that it still runs at 26ms on the real RC.
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
How much planning goes into your robot? Jnadke General Forum 41 29-01-2006 21:29
serious problem found - robot controller resets when jarred! KenWittlief Electrical 23 19-03-2003 13:30
Controlling a FIRST robot with a Lego RCX Controller? archiver 2001 5 24-06-2002 04:19
WASH Palm scouting at the Championship Mike Soukup Scouting 2 19-04-2002 15:14
about how Drive Train push the robot... shouldn't the force accelerate the robot? Ken Leung Technical Discussion 12 26-11-2001 09:39


All times are GMT -5. The time now is 05:33.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi