Go to Post Interestingly enough, I saw Shaun open his backpack for a moment during the Newton Alliance selection.... 4 Hours later Team 25 was on Einstein... - thefro526 [more]
Home
Go Back   Chief Delphi > Competition > Rules/Strategy
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 11-01-2004, 22:24
Joe Johnson's Avatar Unsung FIRST Hero
Joe Johnson Joe Johnson is offline
Engineer at Medrobotics
AKA: Dr. Joe
FRC #0088 (TJ2)
Team Role: Engineer
 
Join Date: May 2001
Rookie Year: 1996
Location: Raynham, MA
Posts: 2,648
Joe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond repute
Out Of Money already! - <R71>

The rules make mention of an "additional hardware list"

Quote:
5.3.1 FIRST Provided Kit of Parts
FIRST provides each team a Kit of Parts. Only the exact parts provided in the Kit (or their exact replacement) are considered as Kit Parts. Some Kit Parts may legally be used in additional quantities. Additional quantities of these parts are considered to be Additional Parts and not Kit Parts. The official list of Kit Parts and quantities appears in a separate section of this manual titled
The Kit.

But I did not see any "Additional quantities" listed anywhere in the kit document.

Based on the "flow chart" anything that is "designed to conduct electricity?" is subject to the $200 limit.

This is not a not a lot of money to buy anything that conducts electricity that is not supplied in the kit.

Think about it.

Wire? good 10 gauge wire is about $1 a foot.
10 Turn Pots? cheap ones from $13 from digi-key -- the ones I LIKE to use are about $28
Shaft Encoders? I was planning on using Bourns 3950 series, $52 each
What about Yaw Rate Sensors? None in the kit this year -- $30 each from Future Electronics -- $70 if they are mounted on a small PCB.
Accelerometers? Another $10 for the chip -- $30 on a PCB.

I don't know if this is just something that fell through the cracks or what but it doesn't seem like we have enough money to do anything interesting.

I must have it wrong, but I don't see my error.

Anyone have a thought on this?

Joe J.
  #2   Spotlight this post!  
Unread 11-01-2004, 22:29
NoRemorse's Avatar
NoRemorse NoRemorse is offline
FOCUS Integration, LLC - Owner
AKA: Brian Roberts
FRC #1023 (Bedford Express)
Team Role: Alumni
 
Join Date: Feb 2003
Rookie Year: 2003
Location: Bedford
Posts: 221
NoRemorse has a spectacular aura aboutNoRemorse has a spectacular aura about
Send a message via AIM to NoRemorse Send a message via MSN to NoRemorse
Re: Out Of Money already! - <R71>

im pretty sure its a $200 limit per item
__________________

http://LSJBuildUp.com -Documenting the build of my LSJ, as well as other influential cars.
  #3   Spotlight this post!  
Unread 11-01-2004, 22:35
Jim Zondag's Avatar
Jim Zondag Jim Zondag is offline
Team Leader
FRC #0033 (Killer Bees)
Team Role: Engineer
 
Join Date: Nov 2001
Rookie Year: 1997
Location: Auburn Hills
Posts: 317
Jim Zondag has a reputation beyond reputeJim Zondag has a reputation beyond reputeJim Zondag has a reputation beyond reputeJim Zondag has a reputation beyond reputeJim Zondag has a reputation beyond reputeJim Zondag has a reputation beyond reputeJim Zondag has a reputation beyond reputeJim Zondag has a reputation beyond reputeJim Zondag has a reputation beyond reputeJim Zondag has a reputation beyond reputeJim Zondag has a reputation beyond repute
Re: Out Of Money already! - <R71>

Joe,
Yeah, I came to the same realization on this this afternoon.
In my opinion, this is an oversight on the part of FIRST.
Per their previous intent, the $200 limit used to be on the custom circuit box to keep people from adding PowerPC boards and the like.
Pots, switches, and wire have always been "free"
We will officially question this rule.
__________________
"To learn what is possible, we must attempt the impossible." Arthur C. Clarke
  #4   Spotlight this post!  
Unread 11-01-2004, 23:15
Gary Dillard's Avatar Unsung FIRST Hero
Gary Dillard Gary Dillard is offline
Generator of Entropy
AKA: you know, the old bald guy
FRC #2973 (The Mad Rockers)
Team Role: Engineer
 
Join Date: Nov 2001
Rookie Year: 1998
Location: Huntsville, AL
Posts: 1,584
Gary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond repute
Send a message via AIM to Gary Dillard
Re: Out Of Money already! - <R71>

Actually, Pots, switches, etc. were not free last year; they fell under the $3500 total limit as they do this year.

Rule R77 uses an example of buying an additional speed controller above the quantity in the kit, and it falls under the $3500 limit; however since speed controllers are $115 each they would exceed the $100 per component limit if they were counted as electronics. It seems this was an oversight.
__________________
Close enough to taste it, too far to reach it
  #5   Spotlight this post!  
Unread 11-01-2004, 23:45
andy's Avatar
andy andy is offline
Alumni
FRC #1139 (Gear Grinders)
Team Role: Student
 
Join Date: Jan 2003
Location: Atlanta
Posts: 94
andy is a jewel in the roughandy is a jewel in the roughandy is a jewel in the rough
Send a message via AIM to andy
Re: Out Of Money already! - <R71>

Yea the sealed industrial encoders we were considering run $150 a pop!

We need at least two!

good luck!
-Andy
  #6   Spotlight this post!  
Unread 11-01-2004, 23:53
Andy A. Andy A. is offline
Getting old
FRC #0095
Team Role: Coach
 
Join Date: Jun 2001
Rookie Year: 2001
Location: New Hampshire
Posts: 1,017
Andy A. has a reputation beyond reputeAndy A. has a reputation beyond reputeAndy A. has a reputation beyond reputeAndy A. has a reputation beyond reputeAndy A. has a reputation beyond reputeAndy A. has a reputation beyond reputeAndy A. has a reputation beyond reputeAndy A. has a reputation beyond reputeAndy A. has a reputation beyond reputeAndy A. has a reputation beyond reputeAndy A. has a reputation beyond repute
Re: Out Of Money already! - <R71>

I belive that anything that came in the kit that isn't ment for the CCB only falls under the $3500 limit.

The $200 limit must only apply to the CCB, and not the rest of the bot. Same for the $100 component rule. The manual states that we may buy additional Victors from IF, and I can't belive that they would limit us to 4.

You're right Joe, this is a oversite by FIRST. There is no way we could do anything interesting if all we can spend on basic electronics is $200. Just think, between wire, crimps and solder there must be $100 worth of material alone on the average bot. Add in 2 extra Victors and a few spikes, and you are way over.

Im sure this will be in the next update.

-Andy A.
  #7   Spotlight this post!  
Unread 11-01-2004, 23:54
Joe Ross's Avatar Unsung FIRST Hero
Joe Ross Joe Ross is offline
Registered User
FRC #0330 (Beachbots)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1997
Location: Los Angeles, CA
Posts: 8,600
Joe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond repute
Re: Out Of Money already! - <R71>

Last year the limit was $400. I assume they lowered the limit because with the new control system, there is much less of a reason for a second microprocessor. However, I have a feeling that FIRST didn't realize the consequences of cutting it in half.
  #8   Spotlight this post!  
Unread 12-01-2004, 00:01
Doug Traster Doug Traster is offline
Engineer
#0829 (Warren Robotics)
 
Join Date: Feb 2003
Location: Indianapolis, IN
Posts: 5
Doug Traster is an unknown quantity at this point
Re: Out Of Money already! - <R71>

Quote:
Originally Posted by Joe Johnson
The rules make mention of an "additional hardware list"
I'm 100% sure (as I suspect you are) that the "electronic parts" are not actually those that "conduct electricity", but rather those that are used in a custom electronic circuit (i.e. additional sensors, uCs, etc). I'm certain that their intent was the same as last year -- wire, terminals and IFI parts do not count against the $200 only against the $3500. I just checked the official Q&A list (already at 31 unanswered questions) and this question has not yet been posted. If it hasn't been posted by tomorrow morning, I'll take care of it, but you were the one who first voiced it so please do the honors.
  #9   Spotlight this post!  
Unread 12-01-2004, 01:02
Dave Flowerday Dave Flowerday is offline
Software Engineer
VRC #0111 (Wildstang)
Team Role: Engineer
 
Join Date: Feb 2002
Rookie Year: 1995
Location: North Barrington, IL
Posts: 1,366
Dave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond repute
Re: Out Of Money already! - <R71>

Quote:
Originally Posted by Joe Ross
Last year the limit was $400. I assume they lowered the limit because with the new control system, there is much less of a reason for a second microprocessor. However, I have a feeling that FIRST didn't realize the consequences of cutting it in half.
Last year the limit on custom electronics was $200. They upped it from the $100 limit in 2002. Nothing has changed as far as I can tell (with the exception Joe mentioned - with wire etc. not being free).
  #10   Spotlight this post!  
Unread 12-01-2004, 01:19
Joe Ross's Avatar Unsung FIRST Hero
Joe Ross Joe Ross is offline
Registered User
FRC #0330 (Beachbots)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1997
Location: Los Angeles, CA
Posts: 8,600
Joe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond repute
Re: Out Of Money already! - <R71>

Quote:
Originally Posted by Dave Flowerday
Last year the limit on custom electronics was $200. They upped it from the $100 limit in 2002. Nothing has changed as far as I can tell (with the exception Joe mentioned - with wire etc. not being free).
Nevermind, you are right. I mixed up the $400 limit on any one component and the $200 limit on electrical components.
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Wasting money??? dubya404 General Forum 10 28-01-2003 18:45
Fundraising ideas? So what are the secrets to raising money? archiver 2001 24 24-06-2002 03:37
Does your school give your team money? Joe Menassa General Forum 17 15-01-2002 19:16
Are you a team with very little money, why/ mnkysp6353 General Forum 6 09-10-2001 21:30
Up-Front money Wayne Doenges General Forum 12 02-08-2001 14:17


All times are GMT -5. The time now is 05:48.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi