Go to Post Not winning is different than being a loser. - seanwitte [more]
Home
Go Back   Chief Delphi > Technical > Technical Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 18-02-2004, 23:34
Unsung FIRST Hero Woodie Flowers Award
Chris Fultz Chris Fultz is offline
My Other Car is a 500 HP Turbine
FRC #0234 (Cyber Blue)
Team Role: Engineer
 
Join Date: Jan 2002
Rookie Year: 1942
Location: Indianapolis, IN
Posts: 2,837
Chris Fultz has a reputation beyond reputeChris Fultz has a reputation beyond reputeChris Fultz has a reputation beyond reputeChris Fultz has a reputation beyond reputeChris Fultz has a reputation beyond reputeChris Fultz has a reputation beyond reputeChris Fultz has a reputation beyond reputeChris Fultz has a reputation beyond reputeChris Fultz has a reputation beyond reputeChris Fultz has a reputation beyond reputeChris Fultz has a reputation beyond repute
Smile Re: Cyber Blue Program Review Process

Final Review was this Monday.

It as a Production Readiness / Operational Readiness Review.

If we were building a turbine engines...
For the Production Readiness Review, we would have focused on our supply chain, manufacturing facilities, parts releases, quality systems, etc. The review would have been to insure that we were ready for full scale production.
For the Operational Readiness Review, we would have focused on field service support, repair facilities, operating manuals, overhaul manuals, and spare parts availability.

But, since we are building 1 robot, our focus was a bit different.

We first showed that the robot we have designed and are building met our requirements. We focused on our "internal requirements", but could have also stepped through the FIRST requirements as well. For each of our requirements, we tried to show proof that we met the requirement - either proven by design data or from demonstrated testing.

The operational readiness focused on the competition capability of the robot. Was it durable and robust, could it take the stress of competition, did we have spare parts ready, and such.

We had the robot partially disassembled so we could not drive for them, but we did show video from the week before.

To close the review we received comments from the reviewers on our process and ways they saw to improve the process of what we were doing. Overall they were very positive.

Our next step is to complete a matrix of complaince to our requriemetns and to continue to review our risk register as we go into the final weekend.

Another unexpected plus form this review was through a new sponsor. We have added Allison Transmission (GM) as a sponsor this season. One of the Engineering Managers was a part of our Technical Advisory Team and he attended most of the reviews. We gained from his involvement, and he has a better understanding of the FIRST program by really being a part of our build process. It was truly a win - win situation.

No more reviews - we have an open house Monday for the community, school, sponsors and others. The TAC will be there and hope to see a fully functional robot driving around, and "hanging around" a bit, also!



215
__________________
Chris Fultz
Cyber Blue - Team 234
2016 IRI Planning Committee
2016 IndyRAGE Planning Committee
2010 - Woodie Flowers Award - Championship

Last edited by Chris Fultz : 18-02-2004 at 23:47. Reason: typos -
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Cyber Blue 234 robot weights calculator David Kelly General Forum 28 17-02-2004 19:30
Anyone looking for more program space? archiver 2001 13 24-06-2002 02:20
Cyber Blue archiver 2000 0 23-06-2002 22:48
Cyber Blue needs help! David Kelly General Forum 0 05-12-2001 19:40


All times are GMT -5. The time now is 02:21.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi