Go to Post I am not even out of high school, and my foot is already in the door of my dream job. And FIRST got me there. - half geek [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #23   Spotlight this post!  
Unread 19-02-2004, 09:44
Chris Hibner's Avatar Unsung FIRST Hero
Chris Hibner Chris Hibner is offline
Eschewing Obfuscation Since 1990
AKA: Lars Kamen's Roadie
FRC #0051 (Wings of Fire (on sabbatical))
Team Role: Engineer
 
Join Date: May 2001
Rookie Year: 1997
Location: Canton, MI
Posts: 1,489
Chris Hibner has a reputation beyond reputeChris Hibner has a reputation beyond reputeChris Hibner has a reputation beyond reputeChris Hibner has a reputation beyond reputeChris Hibner has a reputation beyond reputeChris Hibner has a reputation beyond reputeChris Hibner has a reputation beyond reputeChris Hibner has a reputation beyond reputeChris Hibner has a reputation beyond reputeChris Hibner has a reputation beyond reputeChris Hibner has a reputation beyond repute
Re: Building more than one robot / expanding the "season"

This is a good reason to get rid of the "ship after 6 weeks" rule. Teams that build two robots (to work while their robot has been shipped) are already working through the entire competition. The six week deadline isn't saving these teams any work or any stress. In fact, if we didn't have to ship the robots, these teams would be doing less work (since building a second copy of the robot is obviously more work than only building one copy and keeping it).

It seems to me that the only teams that build two robots are the teams that have the money and/or manpower to do it. If FIRST is interested in a level playing field (for the small teams), then perhaps it's time to do away with shipping the robot off in 6 weeks. That way, everyone has a robot to work with between competitions.

I also think that this takes away some of the advantage to going to many regionals. At the regionals, the teams get to work on their robots, work on programming, make modifications, fix problems, etc. The more regionals you go to, the more opportunity you have to fix things. If teams keep their robot, every team has equal opportunity to fix the robots, make modifications, etc.

Some may argue that this takes away from the "real engineering experience" of having a deadline. I disagree. You would still have a very real deadline: your first competition. If you don't like having to work on the robot at the end of six weeks, then don't - no one would be forcing you to.
__________________
-
An ounce of perception is worth a pound of obscure.
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Robot Collaboration Karthik General Forum 153 18-02-2004 03:40
Re:Team Update #7 is out! archiver 2000 12 23-06-2002 23:00
How many robot can hang on at the same time? archiver 2000 3 23-06-2002 22:03
Kamikaze Robot Strategy... Joe Johnson Rules/Strategy 30 07-04-2002 21:42
Time spent building robot jdawson General Forum 12 25-02-2002 17:53


All times are GMT -5. The time now is 04:52.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi