Go to Post What is this word "done" of which you speak? - Rick TYler [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #24   Spotlight this post!  
Unread 19-02-2004, 17:51
Wetzel's Avatar
Wetzel Wetzel is offline
DC Robotics
FRC #2914 (Tiger Pride)
Team Role: Mentor
 
Join Date: Sep 2001
Rookie Year: 1999
Location: DC
Posts: 3,522
Wetzel has a reputation beyond reputeWetzel has a reputation beyond reputeWetzel has a reputation beyond reputeWetzel has a reputation beyond reputeWetzel has a reputation beyond reputeWetzel has a reputation beyond reputeWetzel has a reputation beyond reputeWetzel has a reputation beyond reputeWetzel has a reputation beyond reputeWetzel has a reputation beyond reputeWetzel has a reputation beyond repute
Send a message via AIM to Wetzel
Re: Building more than one robot / expanding the "season"

Quote:
Originally Posted by Chris Hibner
This is a good reason to get rid of the "ship after 6 weeks" rule. Teams that build two robots (to work while their robot has been shipped) are already working through the entire competition. The six week deadline isn't saving these teams any work or any stress. In fact, if we didn't have to ship the robots, these teams would be doing less work (since building a second copy of the robot is obviously more work than only building one copy and keeping it).

It seems to me that the only teams that build two robots are the teams that have the money and/or manpower to do it. If FIRST is interested in a level playing field (for the small teams), then perhaps it's time to do away with shipping the robot off in 6 weeks. That way, everyone has a robot to work with between competitions.

I also think that this takes away some of the advantage to going to many regionals. At the regionals, the teams get to work on their robots, work on programming, make modifications, fix problems, etc. The more regionals you go to, the more opportunity you have to fix things. If teams keep their robot, every team has equal opportunity to fix the robots, make modifications, etc.

Some may argue that this takes away from the "real engineering experience" of having a deadline. I disagree. You would still have a very real deadline: your first competition. If you don't like having to work on the robot at the end of six weeks, then don't - no one would be forcing you to.
To me, that is a very profound thought. The 6 week rule is something that has been so consant in my 5 years in FIRST, that I'd never enven considered getting rid of it. I will have to give it some thought, but I think I may end up liking it.

As for 'robotics widows', one of our electrical engineers made a deal with (got an ultimadum?) with his other. Try comming to meetings for a year, and if you like it, then stay, if not, she gets a cat to keep her company. As it turns out a few years later, his current job is keeping him later, so she is at more meetings then he is. For the currious, 'she' is MissInformation.


Wetzel
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Robot Collaboration Karthik General Forum 153 18-02-2004 03:40
Re:Team Update #7 is out! archiver 2000 12 23-06-2002 23:00
How many robot can hang on at the same time? archiver 2000 3 23-06-2002 22:03
Kamikaze Robot Strategy... Joe Johnson Rules/Strategy 30 07-04-2002 21:42
Time spent building robot jdawson General Forum 12 25-02-2002 17:53


All times are GMT -5. The time now is 04:52.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi