Go to Post Whether or not your team has the technical mentors, as long as your kids are still inspired by the adult technical mentors of other teams, and get the picture that we're trying to portray in this program, the best that you can do is the best you can do. Do it, and be proud of your results. - Beth Sweet [more]
Home
Go Back   Chief Delphi > Technical > Technical Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #8   Spotlight this post!  
Unread 08-11-2004, 14:54
tkwetzel's Avatar
tkwetzel tkwetzel is offline
Good Luck Teams!
AKA: Tyler Wetzel
FRC #0116 (Epsilon Delta)
Team Role: Alumni
 
Join Date: Mar 2002
Rookie Year: 2003
Location: Charleston, WV
Posts: 1,241
tkwetzel has a reputation beyond reputetkwetzel has a reputation beyond reputetkwetzel has a reputation beyond reputetkwetzel has a reputation beyond reputetkwetzel has a reputation beyond reputetkwetzel has a reputation beyond reputetkwetzel has a reputation beyond reputetkwetzel has a reputation beyond reputetkwetzel has a reputation beyond reputetkwetzel has a reputation beyond reputetkwetzel has a reputation beyond repute
Send a message via AIM to tkwetzel
Re: How do you Calculate Belt Length?

Quote:
Originally Posted by JosephM
Use geometry...

Measure the distance between the two pulleys, write down and multiply it by 2. (56 * 2= 112 in).

Now, take one pulley (6 inches) then find the circumference of it (2*pi*r).

2*pi*r= 37.699 -> 38 in around.

Then divide that by 2 (the belt only contacts half the pulley) and you get 19 in. Repeat your steps for 2.

112in + 19in + 63in = 194 in will be needed. Of course, it's totally theoretical.
I thought of it that way, but with a small change that will be more accurate because it compensates for the extra length between the two pulleys along the line that the belt travels.

I looked at the line that the belt travels between the two pulleys as the hypotonuse of a right triangle. The longest side is 56" (the centerline bewtween the pulleys) and the shorter side is 14" (large radius minus the smaller radius). Then you use the pythagrean therom a^2+b^2=c^2
I included my math so anyone can check it.

56^2+14^2=c^2
3136+196=c^2
3332=c^2
c=57.72...

So you would multiply that number by two and add it to half the circumference of each of the pulleys. Using the numbers in JosephM's post...the distance would come out to roughly 197.5" of total belt length.
__________________
See you in DC!
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Connect Conveyer Belt to self santyclaz Technical Discussion 7 06-02-2004 01:45
Signature length Ken Leung CD Forum Support 16 30-03-2003 20:57
type of material; conveyor belt Alyssia General Forum 9 10-01-2003 13:06
what is or isn't a timing belt? archiver 2001 6 23-06-2002 23:26
vertical conveyor belt ahecht Technical Discussion 3 15-02-2002 16:16


All times are GMT -5. The time now is 23:33.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi