Go to Post To change culture, you're going to have to get people to listen. - Yipyapper [more]
Home
Go Back   Chief Delphi > Technical > Technical Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #13   Spotlight this post!  
Old 24-12-2004, 17:12
Unsung FIRST Hero
Bill Gold Bill Gold is offline
Retired -- 2006
no team
 
Join Date: May 2001
Rookie Year: 1999
Location: USA
Posts: 837
Bill Gold has a reputation beyond reputeBill Gold has a reputation beyond reputeBill Gold has a reputation beyond reputeBill Gold has a reputation beyond reputeBill Gold has a reputation beyond reputeBill Gold has a reputation beyond reputeBill Gold has a reputation beyond reputeBill Gold has a reputation beyond reputeBill Gold has a reputation beyond reputeBill Gold has a reputation beyond reputeBill Gold has a reputation beyond repute
Re: How long did it take for you to build your drivetrain?

Here has been my history with drivetrains in FIRST…

In 2000, as a junior on Team #258, we completed our drivetrain in three weeks. It was a simple 4wd chain and belt driven system run by the ole 3/8” drill motors. The reason it wasn’t completed earlier was because we had very few members of the team, and were working simultaneously on the ball mechanism and drivetrain.

In 2001, as a senior on Team #258, we built pretty much the same 4wd drivetrain as 2000 (but completely with chain and sprockets) in 2 weeks.

In 2002, as a college student on Team #258, we built a 2-speed shift on the fly sprocketbox drivetrain powered by just the CIM motors in 3 weeks, and then spent another week lightening it up significantly.

In 2003, as a college student on Team #258, we spent the first week and a half designing our swerve drive system powered by both 1/2” drill motors and the CIM motors (and rotated by the Globe motors), and then we didn’t complete it until about a week before ship date. We took our time on it because, since it was a simple game, we didn’t really have any other mechanism on the robot. We ghetto-rigged some wings on Thursday of SVR. If we had really tried we could have had the swerve designed in half a week, and then had it completed somewhere along the third week.

In 2004, as a college student on Team #258, we spent about a week and a half designing our “stretcher-drive” system powered by the 1/2” drill motors, and finished it about a week from shipdate. We would have finished it earlier had we had more than 3 people machining parts along with parts we outsourced to a machine shop. There was a crapton of machining on that robot for a team of just a handful of us. It was a lot of fun to work on, though, looking back on it.
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Where do you actually build your robot and who does the building??? Elgin Clock General Forum 47 14-11-2006 17:50
OCCRA Teams - where do you build? Phil 33 OCCRA 7 28-10-2004 21:41
Northrop/FIRST Redhead Jokes General Forum 9 20-09-2004 12:24
How long should production time be??? archiver 1999 4 23-06-2002 23:16


All times are GMT -5. The time now is 04:00.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi