Go to Post everyone loves photoshops of Dave... - lukevanoort [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #6   Spotlight this post!  
Unread 28-12-2004, 14:59
sanddrag sanddrag is offline
On to my 16th year in FRC
FRC #0696 (Circuit Breakers)
Team Role: Teacher
 
Join Date: Jul 2002
Rookie Year: 2002
Location: Glendale, CA
Posts: 8,516
sanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond repute
Re: 2005 6 week schedule

Here is our pretty detailed schedule

Saturday 1/8: Kickoff at 6 am at Clark. Very important for the mentors involved in design to be part of these first moments. Teacher will prepare activities (and solicits ideas from all) to explore scoring strategies after the video feed. After lunch we unpack the kit and discuss what we have to work with. Finish the day with additional activities related to scoring strategies.

Sunday 1/9: 1:00 pm until 5 pm. 1 or 2 more hours in small groups to form our game strategy and finish with a whole group discussion to make recommendations to design-groups as to what characteristics will be desired when the selection process takes place Thursday night. Engineering and design input strongly desired at this stage. Finish the day by dividing up students and adults to form 3 or 4 design teams who will make independent proposals Thursday for selection by vets with mentor veto power. After 4 years of this, I believe strongly that teams should be encouraged to include as many scoring options as possible. They might support their proposals with pictures of mechanisms used by other teams in the past as evidence of feasibility. This may be a good time for anyone, especially adults who have veto power, to make clear certain requirements for the robot design. See my comments below for Thursday 1/13.

Monday through Wednesday 1/10 through 1/12. Teacher will provide facilities for design groups to meet at school between the hours of 3pm and 9pm as requested by the design groups. Teacher will assure that there is cardboard for modeling, graph paper, drafting software. Groups will create as detailed a proposal as possible before 6 pm on Thursday when it will be presented to vets and mentors for consideration. The proposal must explain the game playing philosophy and options supported by the physical design. The porposal must be in a form that is easy to see by the entire team either on individual copies or overhead projector or some other media viewable by all. I will need to know special needs (projector/computer/TV/etc) by Tuesday.

Thursday 1/13: The facility will be open from 3 pm on for finalizing proposals. The full team will meet at 6 for as long as necessary to decide on a direction for further development. That may be one of the 3 or 4 proposals or a hybrid. One thing that I personally will feel very strongly about, if the game resembles all others in the sense that their is head to head combat, is that the chassis and guts must be as low and compact as possible to optimize our advantage when struggling with other robots. I think this is a time when adults must gently but firmly direct the design process. I also believe we need to be respectful and constructive in our suggestions and questions when students have done their best in the horribly limited time/experience/expertise framework we've been given. Then we will select the following teams, probably: overal system/chassis, drive train, programming/electronics, specialized mechanisms, field parts, strategy?, what else?.

Thereafter we will meet every Saturday from 8:30 until 5 and Sunday 1 until 5. I will also stay one weekday (how about Wednesday, from 3 until 9). I'm also willing to extend hours and add days as necessary but will not do so if I see time wasted during regular hours. I'm hoping the engineering support will be there through 1/30 (the first 3 weeks) on a regular basis. I hope that during that time a method for checking specs and details might be worked out so that the engineers can provide less constant on site support thereafter. Our fabrication support will need to kick in by about 1/22. Aram will oversee work at GCC in communication with engrs, Mark will oversee sheet metal and laser cutting, and I believe we have the support of a local CNC machine shop owned by the brother of a parent of one of our new students. I'll bet it would be smart to select a date/time like Wednesday 1/19 at 8pm for all mentors and fabricator liaisons to be in the same place at the same time to talk about how the process unfolds smoothly.

If all goes as planned and expected we'll be finished building by Wednesday 2/16 and plenty of time to practice and debug before the prelims at Chatsworth on Sunday 2/20. Ship on Tuesday 2/22.
__________________
Teacher/Engineer/Machinist - Team 696 Circuit Breakers, 2011 - Present
Mentor/Engineer/Machinist, Team 968 RAWC, 2007-2010
Technical Mentor, Team 696 Circuit Breakers, 2005-2007
Student Mechanical Leader and Driver, Team 696 Circuit Breakers, 2002-2004
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
2004 Season for Fantasy Football, FIRST Robotics league Alex Cormier Chit-Chat 155 29-12-2004 13:12
[Official 2005 Game Design] OK, so YOU design the 2005 game... dlavery FRC Game Design 37 26-10-2004 23:15
Your Thoughts on the 2005 Championship Eligibility Criteria! dez250 Championship Event 57 10-09-2004 14:59
Seeking a thread starter for Question of the week Ken Leung General Forum 1 16-04-2003 12:52
Qotw [02-11-03]: one week left until shipping... Ken Leung Rumor Mill 14 13-02-2003 18:23


All times are GMT -5. The time now is 10:51.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi