Go to Post Remember to ALWAYS use physics in engineering discussions. There is really no room for "feelings" in this sort of thing. - JVN [more]
Home
Go Back   Chief Delphi > Technical > Electrical
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 04-02-2005, 18:58
ryan_f ryan_f is offline
Registered User
#1053
 
Join Date: Jan 2003
Location: ottawa
Posts: 71
ryan_f is an unknown quantity at this point
Question on section 5, <R58>

Ok well im making a layout of the electronics and this is what i have:

http://tnt.cust.nearlyfreespeech.net...ount_plate.jpg

On the middle layer, it's supposed to be the breaker panel and not the robot controllers (they have the same mounting holes)

Now <R58> states:

All circuit breakers must be accessible for inspection at each FIRST Robotics Competition event.


Would that be considered accessible. And if not, what if the top layer was able to come off quickly to make the breaker accessible
  #2   Spotlight this post!  
Unread 04-02-2005, 19:02
AIBob's Avatar
AIBob AIBob is offline
AI Programmer
AKA: Bob Frank DOT org
FRC #0358 (Hauppauge Robotic Eagles)
Team Role: Alumni
 
Join Date: Jan 2005
Rookie Year: 2003
Location: Long Island, NY (in Binghamton now)
Posts: 297
AIBob is a splendid one to beholdAIBob is a splendid one to beholdAIBob is a splendid one to beholdAIBob is a splendid one to beholdAIBob is a splendid one to beholdAIBob is a splendid one to beholdAIBob is a splendid one to behold
Send a message via ICQ to AIBob Send a message via AIM to AIBob Send a message via MSN to AIBob Send a message via Yahoo to AIBob
Re: Question on section 5, <R58>

I do not think that that is accessible enough for the inspection, I would recommend that you move some of it.
But I am not definitively positive of that, I would ask in the Q&A section to be sure.
__________________
- from B B frank

  #3   Spotlight this post!  
Unread 04-02-2005, 22:40
Justin_302's Avatar
Justin_302 Justin_302 is offline
Justin
AKA: Justin
FRC #0302 (Mechanical Dragons)
Team Role: Driver
 
Join Date: Jan 2005
Rookie Year: 2003
Location: Lake Orion
Posts: 119
Justin_302 is on a distinguished road
Send a message via AIM to Justin_302
Re: Question on section 5, <R58>

how much of a clearence is between the Victors and the plate above them? you need at least 2 inches for the fans to circulate air properly
__________________

Team 302
  #4   Spotlight this post!  
Unread 04-02-2005, 22:46
ryan_f ryan_f is offline
Registered User
#1053
 
Join Date: Jan 2003
Location: ottawa
Posts: 71
ryan_f is an unknown quantity at this point
Re: Question on section 5, <R58>

there's about 1 inch clearance

This is an updated version. its the same thing except the top layer is hinged (the mechanism isn't really shown but the top layer is shown in the up position). Now would this comply with the rules?

http://tnt.cust.nearlyfreespeech.net...unt_plate1.jpg
  #5   Spotlight this post!  
Unread 04-02-2005, 22:49
Justin_302's Avatar
Justin_302 Justin_302 is offline
Justin
AKA: Justin
FRC #0302 (Mechanical Dragons)
Team Role: Driver
 
Join Date: Jan 2005
Rookie Year: 2003
Location: Lake Orion
Posts: 119
Justin_302 is on a distinguished road
Send a message via AIM to Justin_302
Re: Question on section 5, <R58>

it would comply with the rules.....but the pwm's need clearence so they dont overheat. I believe what i read was 2 inches
__________________

Team 302
  #6   Spotlight this post!  
Unread 05-02-2005, 01:37
Josh Hambright's Avatar
Josh Hambright Josh Hambright is offline
{Error Processing Custom Title}
AKA: oneangrydwarf/jtosh
no team (old school gangsta)
Team Role: Alumni
 
Join Date: Apr 2002
Rookie Year: 2000
Location: Indiana
Posts: 1,421
Josh Hambright has a reputation beyond reputeJosh Hambright has a reputation beyond reputeJosh Hambright has a reputation beyond reputeJosh Hambright has a reputation beyond reputeJosh Hambright has a reputation beyond reputeJosh Hambright has a reputation beyond reputeJosh Hambright has a reputation beyond reputeJosh Hambright has a reputation beyond reputeJosh Hambright has a reputation beyond reputeJosh Hambright has a reputation beyond reputeJosh Hambright has a reputation beyond repute
Send a message via AIM to Josh Hambright
Re: Question on section 5, <R58>

Looks pretty good, but i would have to say that speaking from experience, using a layered approach like this ends up being tons of extra work and frustration in the long run. Avoid it like the plague if at all possible. However i have been in situations where that is not possible and you have to do what you can do with the space available. But over all the layout looks good, but avoid layering stuff if possible.
__________________
Former 461 Student/Mentor. Former 1272 and 1018 Mentor. Team 1555 Super-Fan.
Science and Engineering Can Open New Doors. --S.E.C.O.N.D.--
=~=!=@= #=$=%=
Co-Founder IndianaFIRST

Share your FIRST photos on Flickr!
  #7   Spotlight this post!  
Unread 05-02-2005, 01:55
D.J. Fluck
 
Posts: n/a
Re: Question on section 5, <R58>

They want you to have a minimum of 2 inches clearance between the top of the victor fans and anything else, this causes the air to circulate better and which prevents overheating and possible damage to the victor...and at a replacement costing $114.95, I wouldn't want to take any risk in damaging it...

It isn't an official FIRST rule, but its a recommendation from IFI. Unless you can't avoid this, I highly recommend taking that into consideration.
  #8   Spotlight this post!  
Unread 05-02-2005, 02:10
Unsung FIRST Hero
miketwalker miketwalker is offline
Robot Lifeguard
FRC #1902 (Exploding Bacon)
 
Join Date: Dec 2001
Rookie Year: 2002
Location: Orlando, FL
Posts: 878
miketwalker has a reputation beyond reputemiketwalker has a reputation beyond reputemiketwalker has a reputation beyond reputemiketwalker has a reputation beyond reputemiketwalker has a reputation beyond reputemiketwalker has a reputation beyond reputemiketwalker has a reputation beyond reputemiketwalker has a reputation beyond reputemiketwalker has a reputation beyond reputemiketwalker has a reputation beyond reputemiketwalker has a reputation beyond repute
Send a message via AIM to miketwalker
Re: Question on section 5, <R58>

I have to back oneangrydwarf and DJ up on this one. You NEED much more space then you have for those victors... you're going to have MAJOR heating issues, and what happens if you need to change the wiring for some reason? Trust me... it happens, and to undo all of that and then try to wire it would be a nightmare. Plus, you're not taking into account the fact that the wires don't bend perfectly, they need room to flow... it'd be nearly (if not completly) impossible to wire the victors as they are now because of all the wires running into each other, and making an even bigger nightmare if you have to sort through the wires... no matter how well you try to organize them. For example, your breaker panel has grounds pointing straight up... taking into account the crimp ends and the wire... you will be crammed for space with that layer configuration when the top hinged section is put down.

Definitly need to go back and revamp that layer setup... it's gonna make your life very, very hard.

Last edited by miketwalker : 05-02-2005 at 02:12.
  #9   Spotlight this post!  
Unread 05-02-2005, 10:16
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,798
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: Question on section 5, <R58>

Quote:
Originally Posted by ryan_f
Now <R58> states:
All circuit breakers must be accessible for inspection at each FIRST Robotics Competition event.
Would that be considered accessible. And if not, what if the top layer was able to come off quickly to make the breaker accessible
Ryan,
The circuit breakers need to be accessible so that inspectors can see that the correct breakers are in place and used as designed. I personally would spread things out a little, and you are likely to find that the victors are going to need some circulating air. You could always drill some large holes in the center plate for additional air flow. I have seen designs like this in the past and they are very cool if they work.
Just a reminder to all, give the inspectors some thought when designing the layout. It will help everyone if they can get through your robot quickly.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.
  #10   Spotlight this post!  
Unread 05-02-2005, 12:02
Mike Hendricks Mike Hendricks is offline
misses his IFI control system
FRC #0973 (GRR)
Team Role: Mentor
 
Join Date: Oct 2003
Rookie Year: 2004
Location: Arroyo Grande, CA
Posts: 237
Mike Hendricks is a name known to allMike Hendricks is a name known to allMike Hendricks is a name known to allMike Hendricks is a name known to allMike Hendricks is a name known to allMike Hendricks is a name known to all
Re: Question on section 5, <R58>

Quote:
Originally Posted by Al Skierkiewicz
Just a reminder to all, give the inspectors some thought when designing the layout. It will help everyone if they can get through your robot quickly.
Thats intresting. Last year, we had lexan shields on the sides of our bot, with some transparent paper that had our sponsers printed on it. This paper, covered all our electronics, including the breaker panels. There was a hole cut out so you could get a large hand inside to easily kill the 120a breaker. The inspectors (at Sac AND Atlanta) never questioned any of the electronics, and there was NO way they could see them. Our bot passed inspection in less than 10 minutes at both events. I was actually rather suprised on how easy the process went .. I figured it was going to take much longer than it did.
__________________
2004-2010: Founding Member, Technical Mentor - Team 1388, Eagle Robotics
2011: ???
  #11   Spotlight this post!  
Unread 06-02-2005, 05:23
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,798
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: Question on section 5, <R58>

Quote:
Originally Posted by PhatMike
Thats intresting. Last year, we had lexan shields on the sides of our bot, with some transparent paper that had our sponsers printed on it. This paper, covered all our electronics, including the breaker panels. There was a hole cut out so you could get a large hand inside to easily kill the 120a breaker. The inspectors (at Sac AND Atlanta) never questioned any of the electronics, and there was NO way they could see them. Our bot passed inspection in less than 10 minutes at both events. I was actually rather suprised on how easy the process went .. I figured it was going to take much longer than it did.
Mike,
Although each event has a different inspection coordinator, there is an attempt to instruct inspectors on following the same procedure at all events. About 40% of the two page inspector's checkoff list is devoted to electrical. And requires that the inspector be able to see the fuse block, wiring (correct AWG, connectors and for wiring that could snag on another robot), speed controllers and relays. They should also check the motors for correct type and number and as a last check, see that the robot turns on, illuminates the color Team ID lighting and that the controller has the correct team number set. The exact time for inspection varies with design. If you don't use pneumatics, most of the first page gets skipped. For rookies reading this post, the inspection process is to insure the rulebook was followed, but more importantly, inspectors want your robot to be able to run without problems on the playing field. If your robot goes up in flames, your alliance partners suffer and the whole competition will have to wait while damage control comes out and sweeps your robot into a container. (hasn't happened yet.) Inspectors do find problems from time to time that were overlooked by the team. Your inspector should be assisting your robot to be competitive and legal.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Error - section 'UTIL_LIB' can not fit the section. Section 'UTIL_LIB' length=0x00000 BookerT Programming 13 27-01-2005 09:49
Error - section 'UTIL_LIB' can not fit the section. Section 'UTIL_LIB' length=0x00000 BookerT Programming 0 25-01-2005 19:17
Linking Errors: "section '????' can not fit the section. ..." Astronouth7303 Programming 3 16-01-2005 21:36
Currently Active Users section question Bill Gold CD Forum Support 4 05-12-2003 15:57
Game Idea archiver 2000 3 23-06-2002 23:27


All times are GMT -5. The time now is 00:20.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi