Quote:
|
Originally Posted by Matt Leese
The fix-it window includes time after the ship date (or am I totally confused?) but not all time after the ship date.
Matt
|
I think your right, unless I am misinterpretting you:
5.2 - THE ROBOT>DEFINITIONS
FIX-IT-WINDOWS – The 48-hour period following the deadline for shipping the robot, or following the close of a regional competition, in which parts may be manufactured in preparation for future competitions. During the
FIX-IT WINDOWS, software for either the robot or operator interface may be developed without restriction.