My team doesn't have corporate sponsors. We have a budget just a bit larger than the allowable robot cost, but good tools. We meet at the US Coast Guard Academy, and we work in the engineering building's power lab.
We have one adult mentor, Captain Wilczynski, who oversees the project and makes sure we stick to schedule. His main role is to try and keep the Academy cadets from slacking off, taking on ideas more ambitious than they have time to do, and getting behind schedule. That and to teach us the last parts of the Mechanical Engineering curriculum here. We have another adult mentor, Master Chief Griswold, who works in the machine shop, keeps everything orderly, and teaches cadets how to use the tools and build things. If you go to him and ask how to build a particular part, he can always suggest something. He also knows exactly where to go to get supply of any basic parts such as gears, springs, aluminum, etc. This year we had three cadet mentors. Cadets are basically college students, with a bit of military weirdness thrown on top. We did most of the work, because it was hard to get all the high-schoolers together at the Coast Guard Academy. Also, there were safety rules about using the power tools, and the high-schoolers could not be in the lab without a cadet mentor. Among the high-schoolers' tough schedules, and the cadets never being permitted to miss a class or a military obligation, the high-schoolers could only work on the robot once or twice a week, for a few hours at a time. So what we did is, first, in the brainstorming part of the project, we got all the cadets and students together and brainstormed ideas for the robot. They built small models with LEGO Mindstorms, we threw three main ideas on the blackboard. We split up and discussed techniques in groups, and then the cadets built prototypes out of wood. We met again with the high-schoolers to discuss what we actually wanted to build. We tried to keep them in the decision-making process, but it just wasn't possible to involve them in the full build. One place where there was a large amount of high-schooler involvement was in the programming; there was only one cadet (myself) who knew how to program, and there were a few high-schoolers and one parent. So we met more often than the building team--which I was also a part of. So how did it work out? Probably about 10-70-20, adults-cadets-high-schoolers. Was it bad? I don't think so... The high-schoolers said we really made them feel like part of the team, and we built a robot that really was much like they'd discussed and planned. I think the biggest thing was attitude. Talking to the high-schoolers just like talking to the other cadets, and being calm but not fake. At the Long Island regional, I saw a lot of good teams, but one memory that stuck out was a team close to the stairs down to the pit. One guy on the team was yelling at everybody around him, "If you're not building on the robot, get out of the pit! Get out!" Really stressing out. Admittedly, the constant vaguely-pumping-up music and announcements on the speakers led to an environment where it was nearly impossible to communicate. I do wish that would change--the noise level felt constantly above safe levels. I spent most of my time there in ear plugs. The environment set up there was stressful and a little frustrating, when trying to get work done. I don't know why FIRST does that. I guess the music is supposed to add to the atmosphere, but the music is artificial, and the atmosphere generated by the (much less noisy) sound of tools, arguments, cheers, and robots is far more genuine. We were a bit stressed too, having to put last-minute fixes on the robot to make it work at all in competition. The high-schoolers were involved a lot in the pits. I was proud of how we did, and I think we treated everybody on the team well. I was pretty badly sick at the time, but even so, was getting a good vibe from the team. Do mentors go too far? I think they can... It's hard for students to get a good mechanical engineering experience when somebody else is doing all the engineering for them, or they have a professional lab building everything and solving the problems. You need to at least meet often enough to discuss problems with the students. If you're professional and you think there is a problem with their designs, you need to discuss that with them and show them why, instead of smiling, nodding, and rejecting the idea behind their backs. I think you have to talk like grownups--to the point, getting work done--but like grownups with respect. If students are doing nothing, you need to look for somewhere they can help. If students have skills, you should use them. But the students can't be there all the time, so you shouldn't be ashamed if you do more work. |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| **FIRST EMAIL**/FIRST Announces New Class of Senior Mentors. | Billfred | FIRST E-Mail Blast Archive | 1 | 23-12-2004 13:32 |