Go to Post If it were not about winning, it would not be called a competition - but FRC is much more than winning a competition. - JaneYoung [more]
Home
Go Back   Chief Delphi > Other > FIRST Tech Challenge
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 08-04-2005, 09:28
Joe Johnson's Avatar Unsung FIRST Hero
Joe Johnson Joe Johnson is offline
Engineer at Medrobotics
AKA: Dr. Joe
FRC #0088 (TJ2)
Team Role: Engineer
 
Join Date: May 2001
Rookie Year: 1996
Location: Raynham, MA
Posts: 2,648
Joe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond repute
PWM Extention Cables: 4 Shall Be the Limit

From an e-mail between FIRST VEX Challenge teams:


Quote:
Hey all,

This is TJ from team -Stickshift FRV 51- (First 1688) .
...<snip>...
We are experiencing a problem that I think you all might be having. The
rules say that were only allowed to use 4 pwm extension cables for the
servos and motors. These cables are nowhere near long enough to power the
manipulator to the full extended length and still have enough left to power
a drivetrain (with a 24 inch chassis....we would need at least 10-12 inches
of cable on each motor to safely route the wiring to the control module. Any
takers on this one, because were stumped as to why using more than 4
extension cables would be banned (as per the FRV robot inspection sheet). I
don't know if were missing something..maybe we are...if so....shout out to
us...



Thanks

~TJ
Dr Joe's Answer:

Quote:
...<snip>...
As to his question, the 4 PWM extention cables are part of the design challenge.
I think it is probably an unreasonable restriction giving the size of the
robots (it effectively limits/makes impossible the use of powered end
effectors), but it is one of the limits. I could go with FIRST changing the
rules (in fact, I recommend it), but if they don't, teams will have to work
around it.

Joe J.
Hope this helps.

If you have questions or answers or opinions or whatever feel free to join the conversation.

Joe J.
__________________
Joseph M. Johnson, Ph.D., P.E.
Mentor
Team #88, TJ2

Last edited by Joe Johnson : 08-04-2005 at 09:47.
Reply With Quote
  #2   Spotlight this post!  
Unread 10-04-2005, 01:25
Scott Chambliss's Avatar
Scott Chambliss Scott Chambliss is offline
jack-of-all-trades
FRC #1648 (Grady Gearbox Gangstaz)
Team Role: Mechanical
 
Join Date: Mar 2005
Rookie Year: 2005
Location: Atlanta, Georgia
Posts: 35
Scott Chambliss is an unknown quantity at this point
Send a message via AIM to Scott Chambliss
Re: PWM Extention Cables: 4 Shall Be the Limit

Team 48

It does seam a little strange. We designed our tower and drive train based on the available cable lengths. It is like the tail waging the dog.
__________________
Team 1648 - Grady Gearbox Gangstaz

2005
Peachtree Regional - Rookie All-Star Award
Peachtree Regional - Finalist (832, 1102!)
Championships - Galileo Quarter-Finalists
Reply With Quote
  #3   Spotlight this post!  
Unread 12-04-2005, 18:23
Ben FRV-40 Ben FRV-40 is offline
Registered User
FTC #0040 (Lurch,Grep,and Grab)
Team Role: Mechanical
 
Join Date: Apr 2005
Rookie Year: 2005
Location: Atlanta
Posts: 1
Ben FRV-40 is an unknown quantity at this point
Re: PWM Extention Cables: 4 Shall Be the Limit

Does this means that we can't try to create our own extension cord using the parts from the kit? It would be hard but possible.
__________________
Fear the Claw!

2am robot construction transcript
Me: Behold, Perfection! (Holds up new robot arm)
James:Umm...don't those 2 supports get in the way?
Me: Oh, well, perfection is overrated.
Reply With Quote
  #4   Spotlight this post!  
Unread 12-04-2005, 20:11
Joe Johnson's Avatar Unsung FIRST Hero
Joe Johnson Joe Johnson is offline
Engineer at Medrobotics
AKA: Dr. Joe
FRC #0088 (TJ2)
Team Role: Engineer
 
Join Date: May 2001
Rookie Year: 1996
Location: Raynham, MA
Posts: 2,648
Joe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond repute
Re: PWM Extention Cables: 4 Shall Be the Limit

Quote:
Originally Posted by Ben FRV-40
Does this means that we can't try to create our own extension cord using the parts from the kit? It would be hard but possible.
If what you are proposing is to use the wires in the kit to extend the wires on a motor or to extend an extension cord, very clever, but I don't think it would be looked upon favorably by FIRST inspectors.

Quote:
<R19> Motors, extension cords, sensors, controllers, battery packs, and any other electrical component of the
Vex Robotic Design System Kit may NOT be altered from it’s original state in any way.
I think that this rule would not allow you to do anything like you are proposing.

Joe J.
__________________
Joseph M. Johnson, Ph.D., P.E.
Mentor
Team #88, TJ2
Reply With Quote
  #5   Spotlight this post!  
Unread 12-04-2005, 23:33
White Wolf's Avatar
White Wolf White Wolf is offline
agitator
AKA: Tom Murphy
FRC #0481 (The Hitchhikers)
Team Role: Coach
 
Join Date: Mar 2003
Rookie Year: 2003
Location: San Pablo, Ca
Posts: 24
White Wolf will become famous soon enoughWhite Wolf will become famous soon enough
Re: PWM Extention Cables: 4 Shall Be the Limit

Quote:
Originally Posted by Scott Chambliss
Team 48

It does seam a little strange. We designed our tower and drive train based on the available cable lengths. It is like the tail waging the dog.
FVT-42 The Hitchhikers
Members of our team voiced similar grave problems with the lack of flexibility of parts. I love it. I have seen students come up with very creative solutions since they couldn't just throw more resources at the problem. I love seeing these Apollo 13 moments flourish. I also like how it is a very economical, level playing field, especially for those of us in the first FIRST vex competition, where our up front cost was pretty low.

Being a teacher, I really like seeing the gray matter getting stirred up. I suspect teams such as our are going to play both games because they each foster a different kind of creativity.
__________________
... Tom
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
2 questions about LAN (10/100) cable. Elgin Clock IT / Communications 19 16-11-2004 12:04
Breaking Cable WebWader125 Technical Discussion 13 28-05-2004 16:44
Fun Times at the Hardware Store sanddrag General Forum 10 19-03-2004 23:55
LEGO IR tower cable Jeff Rodriguez Chit-Chat 1 31-10-2003 16:23
Competition port cable Ken Leung Electrical 2 17-09-2003 08:12


All times are GMT -5. The time now is 13:10.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi