Go to Post What I’m trying to say is that you should not necessarily be looking to build the next “cool” thing, unless that’s your team’s goal and you’ve got the resources to finish it by ship date. - Bill Gold [more]
Home
Go Back   Chief Delphi > Technical > Technical Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 15-09-2005, 22:19
Ronald_raygun Ronald_raygun is offline
Team Finance/Engineering
AKA: Jose Cabanero
FRC #0019 (BigRedRobotics)
Team Role: Leadership
 
Join Date: Jan 2005
Rookie Year: 2005
Location: Conneticut
Posts: 80
Ronald_raygun is a jewel in the roughRonald_raygun is a jewel in the roughRonald_raygun is a jewel in the rough
Send a message via AIM to Ronald_raygun
Pit Management

Ok, I have a few querstions for everyone here.

The following is a concept drawing of a PortaPit that I designed.





The pit at its tallest point is approximately 12'
It is 8'x8'
All of it is quick frame by 80/20 unless it's deemed too weak.

The thing on the right is an LCD screen embedded inside the 1010 T-Slot frame.

On the left there is a stand alone banner display.

The green thing is the tool crate/workbench.



Here is a detailed view of the banner stand. Basically a banner is draped over this and secured by velcro, zip ties, etc.




This is a detailed view of the LCD screen and its mount.



This is a detailed view of the tool crate.


So, what do you think?
__________________
Team 19...Big Red
  #2   Spotlight this post!  
Unread 15-09-2005, 22:25
Kyle Love's Avatar
Kyle Love Kyle Love is offline
Support STEM Education
FRC #3301 (Jay County Robotics)
Team Role: Teacher
 
Join Date: Apr 2004
Rookie Year: 2004
Location: Portland, IN
Posts: 3,072
Kyle Love has a reputation beyond reputeKyle Love has a reputation beyond reputeKyle Love has a reputation beyond reputeKyle Love has a reputation beyond reputeKyle Love has a reputation beyond reputeKyle Love has a reputation beyond reputeKyle Love has a reputation beyond reputeKyle Love has a reputation beyond reputeKyle Love has a reputation beyond reputeKyle Love has a reputation beyond reputeKyle Love has a reputation beyond repute
Re: Pit Management

The Technokats have a pit that I guess qualifies as a porta-pit. It folds down into a rolling cart pretty much. While up, it is around 10-12 feet tall and typical size of FIRST legal pits. We take a work bench, tool carts, robot cart and use the table already there as our work areas. We use a LCD board to display messages to people around our pit.(everything from match times to "Free Segway air fill station" to "EL JORGE WANTS YOU!") We also have a kiosk that we sometimes use outside our pit to display our past movies or demo movies about the current robot. (It also has a pretty good sound system on it.) We found having something like that in the pit to be very annoying. If you have any questions feel free to pm me.
__________________

Kyle Love
Teams I've been on:
Team 45 - The TechnoKats - Student/Leader/Driver 2004-2007
Team 1646 - Boiler Precision Guessworks - Mentor 2007-2011
Team 3301 - Jay County Robotics - Teacher 2011-Present

  #3   Spotlight this post!  
Unread 15-09-2005, 22:36
KyleGilbert45's Avatar
KyleGilbert45 KyleGilbert45 is offline
Registered User
no team
Team Role: Alumni
 
Join Date: Jan 2003
Rookie Year: 2000
Location: ------------------------, IN
Posts: 733
KyleGilbert45 has a brilliant futureKyleGilbert45 has a brilliant futureKyleGilbert45 has a brilliant futureKyleGilbert45 has a brilliant futureKyleGilbert45 has a brilliant futureKyleGilbert45 has a brilliant futureKyleGilbert45 has a brilliant futureKyleGilbert45 has a brilliant futureKyleGilbert45 has a brilliant futureKyleGilbert45 has a brilliant futureKyleGilbert45 has a brilliant future
Re: Pit Management

I think it looks pretty good. I'd recommend searching through the Regional/Championship picture galleries here on CD to see various forms of pit displays. Here is a pretty decent picture of the Technokats (Team 45) from my last year in 2003.

http://www.chiefdelphi.com/pics/bin/...37dscf2079.jpg
__________________
-----------------
  #4   Spotlight this post!  
Unread 15-09-2005, 22:38
Conor Ryan Conor Ryan is offline
I'm parking robot yacht club.
FRC #4571 (Robot Yacht Club)
Team Role: Mentor
 
Join Date: Nov 2004
Rookie Year: 2004
Location: Midtown, NYC
Posts: 1,896
Conor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond repute
Re: Pit Management

Ok, looks great! I love Pit designs idea, makes them feel a little better. Not to mention gives you something to talk about.

Well anyway, the questions
  • Estimated Weight?
  • How big is it when all folded down?
  • Estimated Cost to build?
  • Approxamite Setup time?
  • How many banners do you have?

Last edited by Conor Ryan : 15-09-2005 at 23:21.
  #5   Spotlight this post!  
Unread 15-09-2005, 23:01
Cory's Avatar
Cory Cory is offline
Registered User
AKA: Cory McBride
FRC #0254 (The Cheesy Poofs)
Team Role: Engineer
 
Join Date: May 2002
Rookie Year: 2001
Location: Redwood City, CA
Posts: 6,812
Cory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond repute
Send a message via AIM to Cory
Re: Pit Management

FIRST says the pits should be 10'x10'

Whether or not they actually are at a given event is questionable.

I'd make your "porta-pit" 6"-1' less in all directions to be safe.

You'll have however much time you want to setup your pit, but it'll cut into time you could be using for your robot if it takes more than ~1 hour.
__________________
2001-2004: Team 100
2006-Present: Team 254
  #6   Spotlight this post!  
Unread 15-09-2005, 23:07
Adam Richards's Avatar
Adam Richards Adam Richards is offline
I'm baaaaaaack.
FRC #1902 (Exploding Bacon)
Team Role: College Student
 
Join Date: Jan 2005
Rookie Year: 2005
Location: Orlando, FL
Posts: 1,062
Adam Richards has a reputation beyond reputeAdam Richards has a reputation beyond reputeAdam Richards has a reputation beyond reputeAdam Richards has a reputation beyond reputeAdam Richards has a reputation beyond reputeAdam Richards has a reputation beyond reputeAdam Richards has a reputation beyond reputeAdam Richards has a reputation beyond reputeAdam Richards has a reputation beyond reputeAdam Richards has a reputation beyond reputeAdam Richards has a reputation beyond repute
Send a message via AIM to Adam Richards
Re: Pit Management

Quote:
Originally Posted by Ronald_raygun
[*]How strong is the quick frame method from 80/20?
Not exactly sure how strong their product is, but our team's robot used 80/20 extrusion for this past year's competition. The only problem you may have is at the corners, where you may have to add extra support for the wallframe (neither the banner, nor the LCD should need it).
  #7   Spotlight this post!  
Unread 17-09-2005, 12:33
Ronald_raygun Ronald_raygun is offline
Team Finance/Engineering
AKA: Jose Cabanero
FRC #0019 (BigRedRobotics)
Team Role: Leadership
 
Join Date: Jan 2005
Rookie Year: 2005
Location: Conneticut
Posts: 80
Ronald_raygun is a jewel in the roughRonald_raygun is a jewel in the roughRonald_raygun is a jewel in the rough
Send a message via AIM to Ronald_raygun
Re: Pit Management

Quote:
Originally Posted by Conor Ryan
Ok, looks great! I love Pit designs idea, makes them feel a little better. Not to mention gives you something to talk about.

Well anyway, the questions
  • Estimated Weight?
  • How big is it when all folded down?
  • Estimated Cost to build?
  • Approxamite Setup time?
  • How many banners do you have?

Weight is over 50lbs
Folded down should fit all the pieces into one half of the crate.
Cost is about $1500-$2000
Setup is < 45min (est)
Banners: 10 of varying sizes
__________________
Team 19...Big Red
  #8   Spotlight this post!  
Unread 17-09-2005, 18:06
mechanicalbrain's Avatar
mechanicalbrain mechanicalbrain is offline
The red haired Dremel gnome!
FRC #0623 (Ohm robotics)
Team Role: Electrical
 
Join Date: Apr 2005
Rookie Year: 2004
Location: Virginia
Posts: 1,221
mechanicalbrain has a reputation beyond reputemechanicalbrain has a reputation beyond reputemechanicalbrain has a reputation beyond reputemechanicalbrain has a reputation beyond reputemechanicalbrain has a reputation beyond reputemechanicalbrain has a reputation beyond reputemechanicalbrain has a reputation beyond reputemechanicalbrain has a reputation beyond reputemechanicalbrain has a reputation beyond reputemechanicalbrain has a reputation beyond reputemechanicalbrain has a reputation beyond repute
Send a message via AIM to mechanicalbrain Send a message via Yahoo to mechanicalbrain
Re: Pit Management

Looks nice! I was thinking about doing some type of pit setup but wasn't sure if it would cramp the working room. You have to be SUPER carefull with the size. If its too much a inspector WILL ask you to take it down! We had this happen and its a real bummer. Although looking at your design i don't think you will have that problem. Still be carefull though... You might want to think of some type of working frame so you can lift up the robot and do work under it.
__________________
"Oh my God! There's an axe in my head."
623's 2006 home page
random mechanicalbrain slogans

  #9   Spotlight this post!  
Unread 17-09-2005, 23:05
Ronald_raygun Ronald_raygun is offline
Team Finance/Engineering
AKA: Jose Cabanero
FRC #0019 (BigRedRobotics)
Team Role: Leadership
 
Join Date: Jan 2005
Rookie Year: 2005
Location: Conneticut
Posts: 80
Ronald_raygun is a jewel in the roughRonald_raygun is a jewel in the roughRonald_raygun is a jewel in the rough
Send a message via AIM to Ronald_raygun
Re: Pit Management

mechanicalbrain, do you have a picture of the pit area the the inspectors made you take down?

Also, the cart is completely separate from the pit area. I plan to use the cart as the workbench instead of having a completely different unit. This saves space and cost.
__________________
Team 19...Big Red
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
**FIRST EMAIL**/Welcome 2005 FRC Championship Teams! Andy Brockway FIRST E-Mail Blast Archive 1 04-04-2005 16:33
pit arrangments DAN THE MAN General Forum 2 27-02-2005 02:49
**FIRST EMAIL**/Important Information for All Championship Teams! Jeremy Roberts FIRST E-Mail Blast Archive 0 09-04-2004 21:12
Is there a size regulation for the pit area if we wanted to put up a banner Ragin_Kage General Forum 6 14-03-2002 15:33


All times are GMT -5. The time now is 17:55.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi