|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#1
|
||||
|
||||
|
Pit Management
Ok, I have a few querstions for everyone here.
The following is a concept drawing of a PortaPit that I designed. ![]() ![]() The pit at its tallest point is approximately 12' It is 8'x8' All of it is quick frame by 80/20 unless it's deemed too weak. The thing on the right is an LCD screen embedded inside the 1010 T-Slot frame. On the left there is a stand alone banner display. The green thing is the tool crate/workbench. ![]() Here is a detailed view of the banner stand. Basically a banner is draped over this and secured by velcro, zip ties, etc. ![]() This is a detailed view of the LCD screen and its mount. ![]() This is a detailed view of the tool crate. So, what do you think? |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| **FIRST EMAIL**/Welcome 2005 FRC Championship Teams! | Andy Brockway | FIRST E-Mail Blast Archive | 1 | 04-04-2005 16:33 |
| pit arrangments | DAN THE MAN | General Forum | 2 | 27-02-2005 02:49 |
| **FIRST EMAIL**/Important Information for All Championship Teams! | Jeremy Roberts | FIRST E-Mail Blast Archive | 0 | 09-04-2004 21:12 |
| Is there a size regulation for the pit area if we wanted to put up a banner | Ragin_Kage | General Forum | 6 | 14-03-2002 15:33 |