Thread Tools | Rate Thread | Display Modes |
|
|
|
#1
|
||||
|
||||
|
Re: crunch time
wieght... if anybody needs some to make their robot heavier then we can supply you.... thats all we have to do
cut off the poundage and practice thats all we need to do |
|
#2
|
|||||
|
|||||
|
Re: crunch time
we are almost done. All the tests have passed and now we are just modifying and practicing at the same time. Right now programmers are playing around with the autonomuos code, camera code and also control board. Other than that, out mechanical team sits around and pray for somethign to break so they can work, and our spirit team is getting ready to make banners and stuff for the competitions.
|
|
#3
|
||||
|
||||
|
Re: crunch time
Our robot was GREAT today, UNTIL THE IFI ROBOT CONTROLLER FRIED! We don't know the cause, but for right now were using last years controller. I hope I can post some videos soon!
|
|
#4
|
||||
|
||||
|
Re: crunch time
Our robot is coming along nicely. Where getting things together and should be up and driving around by Saturday for Swamp thing scrimmage or so my team hopes. Custom making wheels, chassis and gearbox is a lot to do in 6 weeks
. Anyway 1251 reporting we should be coming up with the final product right around the corner. Can't wait can ya ?Good luck, Drew |
|
#5
|
|||
|
|||
|
Re: crunch time
Quote:
So my answer to "how far is your robot" is probably still "what robot?" We have a frame welded. We have lots of shooter and turret parts machined, we have lots (but not all) gearbox parts machined. And we have a conveyor prototype and a basket prototype. The basket, delivery system, and conveyor have not started real production yet. Hopefully we'll finish gearboxes tomorrow. We'll see. We have nothing assembled yet for the real thing except our welded frame. |
|
#6
|
||||
|
||||
|
Re: crunch time
we are still working on our ball collecting mechanism....the launcher is done (i know, wrong order right?) So all we have is a chassis and the elctronics board done.... *sigh* This is going to be a long week
|
|
#7
|
|||||
|
|||||
|
Re: crunch time
We have the frame done, with gears and wheels mounted. The electronics pretty much done (might need to add a Victor and a spike or two). The shooter/turret works. The loader works (that was fixed today... belt problems are no more). Still have to get the ball picker-upper running, add some "armour" and bumpers.
Fortunately we are under weight... well under weight... so far. May even add a pneumatics system for ballast. Jason |
|
#8
|
|||||
|
|||||
|
Re: crunch time
we can drive...with some problems (the shifters don't work quite right)
the hopper is slated for completion tomorrow, and the launcher should be done by thursday (we hope) |
|
#9
|
|||
|
|||
|
Re: crunch time
Quote:
|
|
#10
|
|||||
|
|||||
|
Re: crunch time
Quote:
|
|
#11
|
|||||
|
|||||
|
Re: crunch time
I suppose we're doing alright. Ball collection and shooter feed done, elcetronics done, shooter 90% done, code, probably done (without autonomous), but the turret and hopper are not even started. Frustration=1.
|
|
#12
|
||||
|
||||
|
Re: crunch time
Quote:
|
|
#13
|
|||||
|
|||||
|
Re: crunch time
Mechanically....we're almost done minus a few things that are still "quick fixes", some tweaking of components, and some sensors and the like we need to add. As for programing, the robot runs, but we still have some sensors and the like to program and autonomous to work on. I'd say we are overall around 90% done (and doing well wieght wise).
|
|
#14
|
|||||
|
|||||
|
Re: crunch time
Quote:
|
|
#15
|
||||
|
||||
|
Re: crunch time
Quote:
EDIT: This is my 128th post! That's 10,000,000 in binary! |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| It's that time of year again!! (No, not The Championship event) Tax Time!! | Elgin Clock | Chit-Chat | 4 | 10-04-2005 10:59 |
| How much time do you spend on FIRST? | russell | General Forum | 12 | 25-02-2005 18:45 |
| time change | David Kelly | Chit-Chat | 14 | 06-04-2003 23:10 |
| Solution to Timing Loops | Steven Carmain | Programming | 39 | 10-02-2003 13:33 |
| need help with time zone! | Ken Leung | General Forum | 6 | 25-06-2001 12:44 |