Go to Post The sword is only as powerful as it's beholder. But if you choose the labview sword you won't get much tech support at regionals. - xXhunter47Xx [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #24   Spotlight this post!  
Unread 31-08-2006, 14:24
Tristan Lall's Avatar
Tristan Lall Tristan Lall is offline
Registered User
FRC #0188 (Woburn Robotics)
 
Join Date: Aug 2001
Rookie Year: 1999
Location: Toronto, ON
Posts: 2,484
Tristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond repute
Re: YMTC - Manufacturing

Quote:
Originally Posted by Billfred
Quote:
Originally Posted by KenWittlief
I had a similar thought, but I think there is a way.

If the sponsor offered the machined parts for sale only for the purpose of meeting the FIRST requirements (but they knowingly do not expect to sell any) then I would agree, they are severely bending the rules
I agree, but to be legal, you'd have to be ready to make and ship transmissions to all the teams in FIRST in short order. Either you're going to have to have a lot of machining capacity, or you're going to have to build a few hundred transmissions. Neither particularly sounds like it's worth the trouble.

(But hey, if someone wants to go through the trouble of creating a legit business (and the other requirements for a FIRST-legal supplier under the most recent rule set), I don't see the trouble.)
I think that's quite akin to the homologation rules that you find (or used to find) in stock-car racing series. Those rules specified that manufacturers had to produce and offer for sale a certain number of examples of the car that would compete. Often 50 or more. Teams and manufacturers tried every conceivable way to bend the rules, for the same reasons. For example, they would build enough parts for 50 cars, but not assemble them—and were rejected.

So, what if FIRST introduced a homologation rule? Build and offer for sale a certain number of examples, and you can do your fabrication in batches. Something tells me that that would further tip the balance squarely in favour of the teams with the best funding or resources (who can afford to buy expensive components off-the-shelf, or commit resources to a production run). Maybe that's not really what we want to see—it would be as if teams had to either buy into one of the prebuilt designs to realize the significant savings in time and labour, but at the same time, they would be diminishing the amount of engineering that they do on their own. That's probably shifting the balance too far in favour of kit-built robots, as opposed to scratch-built ones.

As for the situation Steve referred to, it's illegal, but I think that his intention was to release them to the team on Wednesday after the kickoff to make up for the time that it would have taken, had the machining been started on the Saturday of the kickoff. The rules don't allow for that solution, even though it's roughly equivalent. And I say roughly, because a team could order one batch of parts with half to be held in reserve, but reject that batch on the basis of the half that they use as a prototype. Then they could repeat that cycle as many times as necessary, each time always having enough parts for the real robot ready. Furthermore, it would allow a team to avoid the delays imposed upon them by their sponsor's schedule—there's no special consideration in the rules for a sponsor being unable to maintain their committments.
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
YMTC: #1 Seed Don Wright General Forum 25 04-04-2006 18:18
CAM - Computer Aided Manufacturing vVigglEs Inventor 8 15-11-2005 18:12
YMTC: worthy of DQ? Levin571 You Make The Call 7 15-03-2005 16:09
YMTC: Should YMTC have a future Natchez You Make The Call 13 21-04-2004 00:46


All times are GMT -5. The time now is 15:33.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi