|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
|
|
Thread Tools | Rate Thread | Display Modes |
|
|
|
#1
|
||||
|
||||
|
Re: Stocking up on parts *wish list
Raw Materials/supplies
5) Keyed Shafting 3/8" and 1/2" 6) Pillow mounted bearings for above shafts. 7) 3/8" #35 Roller chain, links, and offset links. 8) 3/4", 1" Aluminum Angle both 1/16" and 1/8" Tools 3) Hack saw / SawzAll 4) Chain Breaker 5) Tap and Dye set 6) Keyway broach set and a press Do we need to go through any more? This list could go on forever, and there's a thread already about this. Robot Parts 3) Extra PWM cables of various lengths. Good Luck this year!! |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Dean's Holiday Wish List | DUCKIE | Dean Kamen's Inventions | 5 | 06-12-2006 22:59 |
| EasyC Wish List | dcbrown | Programming | 32 | 14-08-2006 09:24 |
| FIRST Wish List | Justin Montois | FRC Game Design | 29 | 11-05-2005 15:48 |
| New Regional Wish List | Anne Shade | General Forum | 61 | 28-04-2003 21:48 |
| FIRST Robotics Wish List | Andy Baker | General Forum | 89 | 05-08-2002 07:25 |