Go to Post Kyle from team 45 said "Dude, I still have 2 years left in FIRST ahahaha.." My response to that was... "Kyle, I have till the day I die." - Arefin Bari [more]
Home
Go Back   Chief Delphi > Technical > Technical Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Spotlight this post!  
Unread 08-01-2007, 04:27
Pavan Dave's Avatar
Pavan Dave Pavan Dave is offline
Busy in College
AKA: I am John Gault.
FRC #1745 (P-51 Mustangs) FRC #118 (Robonauts)
Team Role: Mentor
 
Join Date: Jan 2006
Rookie Year: 2006
Location: Richardson, Texas
Posts: 1,387
Pavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond repute
Send a message via AIM to Pavan Dave
Risk of the Lift?

With this years game there are two main ideas of how to get the robot up either four inches or twelve inches. They are by ramp or by lifting. For those that are lifting and for those that plan to either climb or be lifted, I believe that the lift is much more dangerous. Although with the ramp you have to to keep it in your base and with 2" of clearance due to bumpers you will need to have a small angle thus a longer ramp, it is much more safer. Your robot is always on solid ground. With the lift you are in the air. Are you sure 30 points is worth the risk of your robot falling twelve inches off of the ground? Although I hope this never happens, I think before teams start thinking of being lifted that they should all consider the possibilities both positive and negative. The main one is a robot falling, and today when my team was discussing this I thought of the fact that if you are being lifted up, you are no longer in control of your robot, and that if anything happens your robot will fall. What if it does? Will your team build a more robust robot that can take a twelve inch fall? Will your team prepare for a worst case scenario?

Before you answer keep in mind that six hard weeks of planning, designing, and building went are going to go into your creation.


Pavan.
__________________
Times change. People change. Teams change.
---
2008-Present: FRC1745, P51-Mustangs - Mentor
2005-2008: FRC118, Robonauts - Alumni
National Director of Philanthropy - Delta Epsilon Psi Fraternity, Inc.
1745 - 118 - ΔΕΨ

Last edited by Pavan Dave : 08-01-2007 at 04:32.
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Risk tournament [527]phil Games/Trivia 1 29-09-2005 17:22
Interface of the window lift motors Marjory Frosty Motors 3 14-01-2005 22:57
PHP as a security risk purplehaze357 Website Design/Showcase 9 02-07-2003 21:50
A little lift for the final week George1902 General Forum 1 11-02-2003 22:48
Amount of Force to lift the bridge? archiver 2001 2 23-06-2002 23:21


All times are GMT -5. The time now is 00:17.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi