Go to Post Dee and I pooling our brain cells almost make a full deck... - RoboMom [more]
Home
Go Back   Chief Delphi > Competition > Rules/Strategy
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 15-01-2007, 00:39
Chris_Elston's Avatar
Chris_Elston Chris_Elston is offline
Controls Engineer
AKA: chakorules
FRC #1501 (Team THRUST)
Team Role: Engineer
 
Join Date: Feb 2004
Rookie Year: 2001
Location: Huntington, Indiana
Posts: 751
Chris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond repute
Build a New Operator Inteface each year or not?

I can't find any rules about the operator interface, but are we allowed to re-used the operator interface "frame" from years past? I know we will change out the OI itself from 2006 to the new 2007. Are there teams that re-use their old operator controller frame from years past just changing out the operator interface itself?
__________________
Team T.H.R.U.S.T. 1501
Download all of our past robot's source code here:Repository

Favorite CD quote:
"That can't be their 'bot. not nearly enough (if any) rivets to be a 1501 machine." ~RogerR: Team #1369
  #2   Spotlight this post!  
Unread 15-01-2007, 08:40
BillP's Avatar
BillP BillP is offline
Registered User
AKA: GreenBeard
None #0624 (CRyptonite)
Team Role: Mentor
 
Join Date: Mar 2003
Location: Katy, TX
Posts: 42
BillP is a jewel in the roughBillP is a jewel in the roughBillP is a jewel in the rough
Re: Build a New Operator Inteface each year or not?

Check the following from the rules:

In the definitions:
OPERATOR CONSOLE – the Innovation First-provided Operator Interface unit and any associated equipment, control interfaces, display systems, structure, decorations, etc. used by the DRIVERS to operate the ROBOT.

And then:
<R81> Teams cannot use Operator Interfaces from previous years’ competitions

I would interpret this to say that you ARE permitted to use the frame, or any other components from last years CONSOLE except the operator interface itself. Of course, this has to be justified with COTS and cost rules.
  #3   Spotlight this post!  
Unread 15-01-2007, 09:17
KTorak's Avatar
KTorak KTorak is offline
Fire Rescue 47
AKA: Kyle Dersch
FRC #1023 (Bedford Express)
Team Role: Driver
 
Join Date: Jan 2005
Rookie Year: 2005
Location: Montgomery Village, MD
Posts: 899
KTorak has a reputation beyond reputeKTorak has a reputation beyond reputeKTorak has a reputation beyond reputeKTorak has a reputation beyond reputeKTorak has a reputation beyond reputeKTorak has a reputation beyond reputeKTorak has a reputation beyond reputeKTorak has a reputation beyond reputeKTorak has a reputation beyond reputeKTorak has a reputation beyond reputeKTorak has a reputation beyond repute
Send a message via AIM to KTorak
Re: Build a New Operator Inteface each year or not?

You cannot use the Operator Interface, but you can reuse the 'frame'. We built one out of 8020 and Lexan a few years ago and this will be our 3rd year of using the frame again. All we do is swap the O.I. and joysticks if we need to.
__________________
Kyle D- Myspace - Facebook
2008 Bedford Express Driver & Build & Design (Team) Co-Leader
2007 Bedford Express Driver & Build & Design (Team) Leader
2006 Bedford Express Driver, Build Team Member, & Board of Directors
2005 Bedford Express Rookie, Build Team Member & Robot Operator
-
2008 - GLR Quarter Finalist
2007 - GLR Finalist & Boilermaker Finalist & MARC Off Season Event Winner
2006 - GLR Johnson & Johnson Sportsmanship Award & Archimedes 7th Seed Quarter Finalist
2005 - GLR Finalist & Judges Award.
2004 - GLR Semi Finalist.
2003 - GLR/DTR Quarter Finalist & GLR/NAT'L Rookie All Star.
  #4   Spotlight this post!  
Unread 15-01-2007, 14:42
Bharat Nain's Avatar
Bharat Nain Bharat Nain is offline
Registered User
no team
Team Role: Alumni
 
Join Date: Jan 2004
Rookie Year: 2003
Location: New York
Posts: 2,000
Bharat Nain has a reputation beyond reputeBharat Nain has a reputation beyond reputeBharat Nain has a reputation beyond reputeBharat Nain has a reputation beyond reputeBharat Nain has a reputation beyond reputeBharat Nain has a reputation beyond reputeBharat Nain has a reputation beyond reputeBharat Nain has a reputation beyond reputeBharat Nain has a reputation beyond reputeBharat Nain has a reputation beyond reputeBharat Nain has a reputation beyond repute
Send a message via AIM to Bharat Nain Send a message via MSN to Bharat Nain
Re: Build a New Operator Inteface each year or not?

I think you will be OK if you use a frame from previous years. We have never been inspected about that...
__________________
-= Bharat Nain =-

Whatever you do, you need courage. Whatever course you decide upon, there is always someone to tell you that you are wrong. There are always difficulties arising that tempt you to believe your critics are right. To map out a course of action and follow it to an end requires some of the same courage that a soldier needs. Peace has its victories, but it takes brave men and women to win them. - Ralph Waldo Emerson
  #5   Spotlight this post!  
Unread 15-01-2007, 16:00
Graham Donaldson's Avatar
Graham Donaldson Graham Donaldson is offline
Registered User
AKA: Graham Donaldson
FRC #1676 (The Pascack Pi-oneers)
Team Role: Alumni
 
Join Date: Jan 2006
Rookie Year: 2006
Location: Indianapolis, IN
Posts: 898
Graham Donaldson has a brilliant futureGraham Donaldson has a brilliant futureGraham Donaldson has a brilliant futureGraham Donaldson has a brilliant futureGraham Donaldson has a brilliant futureGraham Donaldson has a brilliant futureGraham Donaldson has a brilliant futureGraham Donaldson has a brilliant futureGraham Donaldson has a brilliant futureGraham Donaldson has a brilliant futureGraham Donaldson has a brilliant future
Re: Build a New Operator Inteface each year or not?

Unless something wierd happens that I'm not expecting, I think this is what my team will do as well. We built a really nice little case last year (with a handle and all) from some Igus (I think-???) parts with the OI mounted on top. All that you could see on top was the joystick handles, the OI, and a box of switches we used to fire our shooter, turn our conveyor on/off, etc... I think we'll just (obviously) switch out the OI, and take out the box of switches and put in the new ones we need for this year, but that'll be it... I really want to put in a missile switch (with the flip cover and everything) for something in this year, but what, I don't know yet...
__________________


2008 NJ Regional, 2009 Palmetto Regional: Chairman's Award Winners
2010 NJ Regional Champions (w/ 25 and 3059), 2010 VA Regional Champions (w/ 1086 & 1418)

"Hard work spotlights the character of people: some turn up their sleeves, some turn up their noses, and some don't turn up at all."- Sam Ewing
"Opportunity is missed by most people because it is dressed in overalls and looks like work."- Thomas Edison
  #6   Spotlight this post!  
Unread 15-01-2007, 16:01
cbale2000's Avatar
cbale2000 cbale2000 is offline
Registered User
AKA: Chris Bale
FRC #5712 (Gray Matter)
Team Role: Mentor
 
Join Date: Apr 2006
Rookie Year: 2004
Location: Saginaw, MI
Posts: 980
cbale2000 has a reputation beyond reputecbale2000 has a reputation beyond reputecbale2000 has a reputation beyond reputecbale2000 has a reputation beyond reputecbale2000 has a reputation beyond reputecbale2000 has a reputation beyond reputecbale2000 has a reputation beyond reputecbale2000 has a reputation beyond reputecbale2000 has a reputation beyond reputecbale2000 has a reputation beyond reputecbale2000 has a reputation beyond repute
Re: Build a New Operator Inteface each year or not?

We've used our frame for about 4 or 5 years now! It's so simple yet effective we just haven't worried about it. We'll probably be making a new one this year though as the current on takes up the entire station area (which was a real pain to drive last year in the center station with our controllers tucked behind the center goal ball return chute)
__________________
2005-2008: FRC 703 Phoenix - Driver
2009-2016: FRC 703 Phoenix - Mentor
2017-????: FRC 5712 Gray Matter - Mentor
  #7   Spotlight this post!  
Unread 15-01-2007, 20:51
Assassin Shadow's Avatar
Assassin Shadow Assassin Shadow is offline
Inventor of the Shadow-gram
AKA: James Bilger
FRC #0342 (The Burning Magnetos)
Team Role: Programmer
 
Join Date: Oct 2005
Rookie Year: 2005
Location: South Carolina
Posts: 16
Assassin Shadow is a jewel in the roughAssassin Shadow is a jewel in the roughAssassin Shadow is a jewel in the rough
Re: Build a New Operator Inteface each year or not?

We've been using the same frame for the past couple of years, just changing out the OI and some of the switches, we always seem to use the same joysticks though.(probably because they're comfy or something)
__________________
Team 342

"If it doesn't move enought - WD-40, if it moves to much - Duct Tape."
-page 1, Life's Troubleshooting Guide
  #8   Spotlight this post!  
Unread 15-01-2007, 21:11
Billfred's Avatar
Billfred Billfred is offline
...and you can't! teach! that!
FRC #5402 (Iron Kings); no team (AndyMark)
Team Role: Mentor
 
Join Date: Feb 2004
Rookie Year: 2004
Location: The Land of the Kokomese, IN
Posts: 8,567
Billfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond repute
Re: Build a New Operator Inteface each year or not?

I'm wondering, especially given the GDC's emphatic stance on the six-week window this year, if reuse of even decorative parts of the operator panel is even allowed. The question came up at UCF last year, and it was allowed in at least one case I know of, but Last Year Is Not This Year.

Let's liven things up on Q&A.

Quote:
Originally Posted by FRC1618
Is it permissible for a team to use the structural or decorative elements of past years' operator consoles, provided that the OI is replaced with this year's unit and any custom controls are fabricated after Kickoff?
__________________
William "Billfred" Leverette - Gamecock/Jessica Boucher victim/Marketing & Sales Specialist at AndyMark

2004-2006: FRC 1293 (D5 Robotics) - Student, Mentor, Coach
2007-2009: FRC 1618 (Capital Robotics) - Mentor, Coach
2009-2013: FRC 2815 (Los Pollos Locos) - Mentor, Coach - Palmetto '09, Peachtree '11, Palmetto '11, Palmetto '12
2010: FRC 1398 (Keenan Robo-Raiders) - Mentor - Palmetto '10
2014-2016: FRC 4901 (Garnet Squadron) - Co-Founder and Head Bot Coach - Orlando '14, SCRIW '16
2017-: FRC 5402 (Iron Kings) - Mentor

94 events (more than will fit in a ChiefDelphi signature), 14 seasons, over 61,000 miles, and still on a mission from Bob.

Rule #1: Do not die. Rule #2: Be respectful. Rule #3: Be safe. Rule #4: Follow the handbook.

Last edited by Billfred : 15-01-2007 at 21:24.
  #9   Spotlight this post!  
Unread 15-01-2007, 22:18
whytheheckme's Avatar
whytheheckme whytheheckme is offline
Registered User
AKA: Jacob Komar
no team
 
Join Date: Feb 2006
Rookie Year: 2005
Location: Providence, RI
Posts: 1,320
whytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond repute
Send a message via ICQ to whytheheckme Send a message via AIM to whytheheckme Send a message via MSN to whytheheckme Send a message via Yahoo to whytheheckme
Re: Build a New Operator Inteface each year or not?

I just joined a new team, but on my old team, their OI were a set of wings that was worn on the drivers back going up to the field from the pit (pretty cool...) This was reused year to year, except of course for the hole in the front that would continuously get bigger as I continued to create larger and larger Project Boxes full of buttons for the drivers ...

This is totally cool. The idea (I think... maybe up for discussion) that FIRST has is that the OI unit is replaced due to updates, and that modifications are made to controllers to better serve your robot, but if you have a theme or a solid design, you should not be required to change it. I think its kind of like a mascott; you don't change that every year, do you?

Just some thoughts,
Jacob
  #10   Spotlight this post!  
Unread 16-01-2007, 22:10
whytheheckme's Avatar
whytheheckme whytheheckme is offline
Registered User
AKA: Jacob Komar
no team
 
Join Date: Feb 2006
Rookie Year: 2005
Location: Providence, RI
Posts: 1,320
whytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond repute
Send a message via ICQ to whytheheckme Send a message via AIM to whytheheckme Send a message via MSN to whytheheckme Send a message via Yahoo to whytheheckme
Re: Build a New Operator Inteface each year or not?

Here is a picture of the old OI.

Sorry for the low resolution. It had to fit in 100KB for this post.

Jacob
Attached Thumbnails
Click image for larger version

Name:	Picture 9.jpg
Views:	92
Size:	90.2 KB
ID:	4894  
  #11   Spotlight this post!  
Unread 16-01-2007, 22:22
Chris_Elston's Avatar
Chris_Elston Chris_Elston is offline
Controls Engineer
AKA: chakorules
FRC #1501 (Team THRUST)
Team Role: Engineer
 
Join Date: Feb 2004
Rookie Year: 2001
Location: Huntington, Indiana
Posts: 751
Chris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond reputeChris_Elston has a reputation beyond repute
Re: Build a New Operator Inteface each year or not?

Quote:
Originally Posted by whytheheckme View Post
Here is a picture of the old OI.

Sorry for the low resolution. It had to fit in 100KB for this post.

Jacob
That is really SWEET looking...good job guys!
__________________
Team T.H.R.U.S.T. 1501
Download all of our past robot's source code here:Repository

Favorite CD quote:
"That can't be their 'bot. not nearly enough (if any) rivets to be a 1501 machine." ~RogerR: Team #1369
  #12   Spotlight this post!  
Unread 16-01-2007, 22:37
amos229's Avatar
amos229 amos229 is offline
Retired chicken man
AKA: amouse
FRC #0229 (Division By Zero)
Team Role: Alumni
 
Join Date: Jan 2005
Rookie Year: 2003
Location: my mind, its dark in here
Posts: 219
amos229 has much to be proud ofamos229 has much to be proud ofamos229 has much to be proud ofamos229 has much to be proud ofamos229 has much to be proud ofamos229 has much to be proud ofamos229 has much to be proud ofamos229 has much to be proud ofamos229 has much to be proud of
Send a message via AIM to amos229 Send a message via Yahoo to amos229
Re: Build a New Operator Inteface each year or not?

Those are awesome. Hmmm. The ideas are flowing through my mind now for a new oi board
__________________
Govenors see innovation like judges see pornograpghy, they dont know exactly what it is but they know it when they see it, Dean Kamen, BAE Regional, 2007

229 alumni= lifetime of inspiration
  #13   Spotlight this post!  
Unread 17-01-2007, 14:02
Donut Donut is offline
The Arizona Mentor
AKA: Andrew
FRC #2662 (RoboKrew)
Team Role: Engineer
 
Join Date: Mar 2005
Rookie Year: 2004
Location: Goodyear, AZ
Posts: 1,313
Donut has a reputation beyond reputeDonut has a reputation beyond reputeDonut has a reputation beyond reputeDonut has a reputation beyond reputeDonut has a reputation beyond reputeDonut has a reputation beyond reputeDonut has a reputation beyond reputeDonut has a reputation beyond reputeDonut has a reputation beyond reputeDonut has a reputation beyond reputeDonut has a reputation beyond repute
Re: Build a New Operator Inteface each year or not?

I don't know if the rules require it or not exactly, but we build a new one from scratch each year anyway. It's typically I think 1/16" alumunimum L brackets that are riveted together, with a sheet of wood for the bottom level and a combination of lexan and aluminum for the top.
__________________
FRC Team 498 (Peoria, AZ), Student: 2004 - 2007
FRC Team 498 (Peoria, AZ), Mentor: 2008 - 2011
FRC Team 167 (Iowa City, IA), Mentor: 2012 - 2014
FRC Team 2662 (Tolleson, AZ), Mentor: 2014 - Present
  #14   Spotlight this post!  
Unread 17-01-2007, 15:53
StevenB StevenB is offline
is having FRC withdrawal symptoms.
AKA: Steven Bell
no team
Team Role: College Student
 
Join Date: May 2005
Rookie Year: 2005
Location: Stanford, CA
Posts: 416
StevenB has a reputation beyond reputeStevenB has a reputation beyond reputeStevenB has a reputation beyond reputeStevenB has a reputation beyond reputeStevenB has a reputation beyond reputeStevenB has a reputation beyond reputeStevenB has a reputation beyond reputeStevenB has a reputation beyond reputeStevenB has a reputation beyond reputeStevenB has a reputation beyond reputeStevenB has a reputation beyond repute
Re: Build a New Operator Inteface each year or not?

Quote:
Let's liven things up on Q&A.

Quote:
Originally Posted by FRC1618
Is it permissible for a team to use the structural or decorative elements of past years' operator consoles, provided that the OI is replaced with this year's unit and any custom controls are fabricated after Kickoff?
I'm not seeing the Q&A question for this. Am I blind, or is it not there for some reason? Could you post a link?
Thanks!
Steven
__________________
Need a physics refresher? Want to know if that motor is big enough for your arm? A FIRST Encounter with Physics

2005-2007: Student | Team #1519, Mechanical Mayhem | Milford, NH
2008-2011: Mentor | Team #2359, RoboLobos | Edmond, OK
2014-??: Mentor | Looking for a team...
  #15   Spotlight this post!  
Unread 22-01-2007, 23:16
ChuckDickerson's Avatar
ChuckDickerson ChuckDickerson is offline
Mentor / Bayou & CMP Division LRI
FRC #0456 (Siege Robotics)
Team Role: Mentor
 
Join Date: May 2004
Rookie Year: 2004
Location: Vicksburg, MS
Posts: 877
ChuckDickerson has a reputation beyond reputeChuckDickerson has a reputation beyond reputeChuckDickerson has a reputation beyond reputeChuckDickerson has a reputation beyond reputeChuckDickerson has a reputation beyond reputeChuckDickerson has a reputation beyond reputeChuckDickerson has a reputation beyond reputeChuckDickerson has a reputation beyond reputeChuckDickerson has a reputation beyond reputeChuckDickerson has a reputation beyond reputeChuckDickerson has a reputation beyond repute
Re: Build a New Operator Inteface each year or not?

I am thinking that rule <R11> means we now have to make a whole new operator console and cannot use any of it from a previous year:

Quote:
<R11> For the purposes of determining compliance with the weight and volume limitations specified
in Rule <R07>, these items are NOT considered part of the ROBOT and are NOT included
in the weight and volume assessment of the ROBOT:

- The 12V battery and its associated half of the Anderson cable quick connect/disconnect pair
(including no more than 12 inches of cable per leg, the associated cable lugs, connecting
bolts, and insulating electrical tape) on board the ROBOT.

- Any STANDARD BUMPER assemblies included on the ROBOT that are in compliance with
Rule <R37>, up to a maximum of 15 pounds.

- The FLAG is not considered part of the ROBOT. However, the flag holder specified in Rule
<R15> IS considered part of the ROBOT, and is included in the weight and volume
determination

- The OPERATOR CONSOLE.

However, for all other purposes the items listed above are considered part of the ROBOT and must
comply with all other applicable rules and requirements.
In particular, these items are subject to
the shipping deadlines specified in Section 4.5.1.1 and must ship in the crate with the rest of the
ROBOT.
Since we must fabricate the whole robot between kickoff and ship day and the operator console is now considered part of the robot, doesn't this mean we have to build it between kickoff and ship day as well?

Am I the only one that read the new rule this way?
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
pic: New year, new hair, new title vic burg Extra Discussion 1 07-10-2006 23:43
Did You Build 2 Robots This Year?! the_short1 General Forum 20 01-03-2006 01:04
Project does not build team 803 Programming 5 27-02-2006 17:03
To build the kit base or not? Leo 1529 Technical Discussion 11 19-01-2006 10:45
What is it that brings you back each year?? Amy_ComBBAT General Forum 10 04-05-2002 16:31


All times are GMT -5. The time now is 13:42.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi