Go to Post Oh, and a general guiding principle: Don't be stupid. - Billfred [more]
Home
Go Back   Chief Delphi > Technical > Technical Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 20-02-2007, 22:29
Pavan Dave's Avatar
Pavan Dave Pavan Dave is offline
Busy in College
AKA: I am John Gault.
FRC #1745 (P-51 Mustangs) FRC #118 (Robonauts)
Team Role: Mentor
 
Join Date: Jan 2006
Rookie Year: 2006
Location: Richardson, Texas
Posts: 1,387
Pavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond reputePavan Dave has a reputation beyond repute
Send a message via AIM to Pavan Dave
Re: New Robotics Lab design needs your input

What layout ? Carpet area with mock field space, (half of your lay out), 1/3 of it for building, 1/3 for Machines, 1/3 of remaining for a MOCK Pit so your team gets idea of working at regionals.
--------------------
|...........|.............|
|...........|.............|
|...........|________|
|...........|.............|
|...........|.............|
|...........|________|
|...........|.............|
|...........|.............|
|...........|________|
What tools ? A Lathe, Mill, CNC, Drill Press, Ban saw, Grinder, Dremel, Drills, et cetra.
What kind of storage? Cabinets, Shelves, Tables with shelves underneath
What built in systems (air, vacuum, power) ? Air and Power. If you
Cabinets, shelves, closets? Many Cabinets....One for EACH sub system or group on your robot and a huge cabinet for each to put their stuff away at night possibly.
Floor covering - workshop and classroom Cement is preferable IMO because you can always lay carpet for field, and if you spill something or when its time to clean, it is easier on concrete.
Overhead systems (unistrut, power, lighting)? WHITE LIGHTS! Make sure you have white lights.


Also see if you can get a room by the wall of the building so that you can install a retractable wall/gate so you can ship your bot and move it out of the building easier.

Pavan.
__________________
Times change. People change. Teams change.
---
2008-Present: FRC1745, P51-Mustangs - Mentor
2005-2008: FRC118, Robonauts - Alumni
National Director of Philanthropy - Delta Epsilon Psi Fraternity, Inc.
1745 - 118 - ΔΕΨ
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
S.O.A.P. Changes: Your Input Needed! Silence Scouting 12 30-01-2005 18:02
Arm Design Input -- Four Bar Linkages Sachiel7 Technical Discussion 4 18-01-2005 01:29
a Boston Invitational... I WANT YOUR INPUT!!! Erin Rapacki Off-Season Events 30 30-03-2003 14:33
Time limits, your input, etc. Brandon Martus Announcements 36 08-11-2002 07:50


All times are GMT -5. The time now is 00:07.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi