|
Re: Update #16
Perhaps the solution to the problem is for FIRST to establish (or allow one team to establish) a "Simple Drilling and cutting station" separate from the machine shop, so they are not loaded down with other duties. Three rules
1. Mark points to be drilled and Mark size
2. Mark cut lines
3. Wait in line
just thinking out loud
__________________
Teacher/Engineer/Machinist - Team 696 Circuit Breakers, 2011 - Present
Mentor/Engineer/Machinist, Team 968 RAWC, 2007-2010
Technical Mentor, Team 696 Circuit Breakers, 2005-2007
Student Mechanical Leader and Driver, Team 696 Circuit Breakers, 2002-2004
|