Go to Post I wanted my team to be rewarded for something they do, not because they do it for the award. - MikePres [more]
Home
Go Back   Chief Delphi > Technical > Electrical
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #26   Spotlight this post!  
Unread 27-03-2007, 08:29
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,798
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: Problems With The Power Distribution Block

Quote:
Originally Posted by Brandon Holley View Post
At the winter warzone we had all kinds of problems with the block arc-ing and causing our victors to short out. It cost us the quarterfinals there.
At 12 volts these blocks cannot arc. Intermittant wiring will cause heating and intermittant electrical power can cause problems with any electronics. All termination devices at normal robot currents will have these problems including the interface to the battery terminals.
The Rockwell blocks use quasi-parallel clamps to secure the wires. If a wire is not stripped back enough or if the wire is not inserted far enough, the clamp will squeeze/push the wire out of the terminal. If you take a look at the picture (thank you to the Rockwell site) you will see that a wire that is not inserted to the end of the clamp will loosen and fall out. The specification from the Rockwell Catalog for this series (1492-J16) is "Wire Strip Length 0.63 in (16 mm)". The molded-in wire stop correctly positions the wire in the jaws for best termination. Additionally, stranded wire will be forced to change cross section as the clamp pushes down on the wire. This may force teams to check the tightness from time to time. (robot movement will shake wires and make this worse) For these reasons, Loctite is a bad idea on these blocks.
Some folks have suggested the use of ferrules over the wire. Debate is still raging but i have some Panduit samples coming in the next week or so to look over. stand by...
Attached Thumbnails
Click image for larger version

Name:	6524.jpg
Views:	61
Size:	10.5 KB
ID:	5345  
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.

Last edited by Al Skierkiewicz : 27-03-2007 at 09:04.
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Power Distribution Block Grounding Karma Electrical 15 22-01-2008 07:18
Question:Power Distribution Block Pavan Dave Electrical 35 20-03-2007 20:10
Power distribution Block? Pontchartrain Electrical 3 27-01-2006 07:30
Stinger Fuse Block and Power Distribution Block Don Wright Electrical 2 30-03-2004 10:45
Power Distribution Block DukesElectrical General Forum 0 09-02-2004 23:48


All times are GMT -5. The time now is 00:19.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi