Go to Post FIRST Robotics Competition could NEVER, EVER, EVER feature aquatic robots. - dlavery [more]
Home
Go Back   Chief Delphi > Technical > Electrical
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Spotlight this post!  
Unread 01-04-2007, 15:04
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,770
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Inspections at Championship

I think it is important to note that the big show is coming up in less than two weeks. Please reread your 2007 manual paying close attention to robot rules (rev G now on the FIRST website) as well as the game (also Rev G). Staff will be using these latest documents in Atlanta for game play and inspections. Of particular note for electrical is the mandatory use of the Rockwell power distro blocks and the relay and orange team light. If you don't have these items on your robot, even if you passed inspection elsewhere, they will be required at the Championship. Relays were available in spare parts, but terminal blocks, DIN mounting rails and relay sockets were not. If you know you need these items, I would start ordering them tomorrow so you can have them. Pnuematics will also need to meet spec and will reguire the minimum pnuematic system to make it through inspection. i.e. compressor (one only please), guages (120 and 60 PSI), regulator, pressure switch connected to the RC, spike (to control the compressor from the RC) and pressure relief valve(to vent the system). Please be prepared, read the rules, team updates and the Q&A.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
student inspections Ryan Albright Rules/Strategy 1 18-04-2003 11:27
Great Lakes Inspections Anarkissed Regional Competitions 7 24-03-2003 19:54
New inspections Alavinus General Forum 17 10-03-2003 20:12
Inspections - remainder of competitions Mike Martus OCCRA 0 09-11-2002 09:06
FIRST inspections ( following rules ) Caleb Osborne General Forum 31 26-07-2002 08:09


All times are GMT -5. The time now is 21:37.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi