Re: Design Period, THEN Build Period
I like the idea a lot, but 4 (additional) weeks of design may be excessive. We'd sure make good use of it with Inventor though. The holidays are not a great time to be doing robots, especially for the volunteers.
The 1 or 2 week design period proposed seems good, enough to be able to hash out ideas thoroughly and do some training but not enough time to get into overthinking it. The VKoP would have to have some far better descriptions, photos and part numbers to make it valuable, otherwise we'd be just trying to figure out 'what is it?" Don |
|
#2
|
|||||
|
|||||
|
Re: Design Period, THEN Build Period
I agree with the comments and ideas posted here. Figuring out a way to make something like this work in the FIRST context will certainly require an iterative design cycle.
While I appreciate the simplicity of the current six-week do everything model, and am happy to play the game under the current rules, perhaps we can brainstorm a way that we can have more time for design. In my classes I always force the kids to come up with a reasonable set of plans on paper before I let them start cutting or building, and I would like to see something like that for FIRST. (They can change their design if they run into unexpected difficulties, but they have to be able to explain what went wrong and how they plan to solve the problem before they get any additional material for a re-do.) Jason |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Robot Cool Down Period...? | Mike Starke | General Forum | 27 | 19-03-2007 01:25 |
| 8 weeks build period!?! | Ken Leung | Rumor Mill | 18 | 28-01-2003 21:14 |
| Autonomous Period | Andy Grady | General Forum | 73 | 20-01-2003 21:34 |
| FIRST Build Period | Karl | General Forum | 5 | 09-12-2001 13:30 |