Go to Post "git er done" but do it right. - CJO [more]
Home
Go Back   Chief Delphi > Competition > FRC Game Design
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 07-06-2007, 21:49
DonRotolo's Avatar
DonRotolo DonRotolo is offline
Back to humble
FRC #0832
Team Role: Mentor
 
Join Date: Jan 2005
Rookie Year: 2005
Location: Atlanta GA
Posts: 7,011
DonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond repute
Re: Design Period, THEN Build Period

I like the idea a lot, but 4 (additional) weeks of design may be excessive. We'd sure make good use of it with Inventor though. The holidays are not a great time to be doing robots, especially for the volunteers.

The 1 or 2 week design period proposed seems good, enough to be able to hash out ideas thoroughly and do some training but not enough time to get into overthinking it.

The VKoP would have to have some far better descriptions, photos and part numbers to make it valuable, otherwise we'd be just trying to figure out 'what is it?"

Don
__________________

I am N2IRZ - What's your callsign?
  #2   Spotlight this post!  
Unread 08-06-2007, 01:37
dtengineering's Avatar
dtengineering dtengineering is offline
Teaching Teachers to Teach Tech
AKA: Jason Brett
no team (British Columbia FRC teams)
Team Role: Mentor
 
Join Date: Jan 2005
Rookie Year: 2004
Location: Vancouver, BC
Posts: 1,830
dtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond repute
Re: Design Period, THEN Build Period

I agree with the comments and ideas posted here. Figuring out a way to make something like this work in the FIRST context will certainly require an iterative design cycle.

While I appreciate the simplicity of the current six-week do everything model, and am happy to play the game under the current rules, perhaps we can brainstorm a way that we can have more time for design. In my classes I always force the kids to come up with a reasonable set of plans on paper before I let them start cutting or building, and I would like to see something like that for FIRST. (They can change their design if they run into unexpected difficulties, but they have to be able to explain what went wrong and how they plan to solve the problem before they get any additional material for a re-do.)

Jason
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Robot Cool Down Period...? Mike Starke General Forum 27 19-03-2007 01:25
8 weeks build period!?! Ken Leung Rumor Mill 18 28-01-2003 21:14
Autonomous Period Andy Grady General Forum 73 20-01-2003 21:34
FIRST Build Period Karl General Forum 5 09-12-2001 13:30


All times are GMT -5. The time now is 07:16.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi