Go to Post Or you can always say "we programmed it that way." - probizzle [more]
Home
Go Back   Chief Delphi > Competition > FRC Game Design
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 08-06-2007, 09:07
Billfred's Avatar
Billfred Billfred is offline
...and you can't! teach! that!
FRC #5402 (Iron Kings); no team (AndyMark)
Team Role: Mentor
 
Join Date: Feb 2004
Rookie Year: 2004
Location: The Land of the Kokomese, IN
Posts: 8,547
Billfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond repute
Re: Design Period, THEN Build Period

Edit: Read Mark's post right below mine. Ignore this post, unless you're dying to read the spoiler with the original.

Spoiler for the old post:
I've enjoyed the six-week model, as have my grades and sanity. Still, forcing teams to reason out their design wouldn't be a terrible idea.

Suppose that at Kickoff, the Robot section of the manual was withheld along with the Kit of Parts. Teams would get the game, game pieces, and (obviously) the Kit of Parts section of the manual, giving them plenty to start hashing out design ideas until the following Friday or Saturday, when they receive their full kits and robot manuals.

This does mean that folks would have to make two trips to their Kickoff site, but it would force teams to prototype manipulators at the start of the build period instead of the "OMG SHIP IS TOMORROW WE NEED SOMETHING!!" approach that I'm sure I'm not alone in using at some point (and also not alone in getting poor results from). I wouldn't outright ban robot fabrication during such a period, but perhaps one or more of the judged awards could place an emphasis on design during this first week.

I could see such a concept reducing the number of manipulatorless bricks arriving at competitions, something that could make for a better competition all around. (That's from someone who's had a hand in three such bricks, each unintentionally designed as such.)
__________________
William "Billfred" Leverette - Gamecock/Jessica Boucher victim/Marketing & Sales Specialist at AndyMark

2004-2006: FRC 1293 (D5 Robotics) - Student, Mentor, Coach
2007-2009: FRC 1618 (Capital Robotics) - Mentor, Coach
2009-2013: FRC 2815 (Los Pollos Locos) - Mentor, Coach - Palmetto '09, Peachtree '11, Palmetto '11, Palmetto '12
2010: FRC 1398 (Keenan Robo-Raiders) - Mentor - Palmetto '10
2014-2016: FRC 4901 (Garnet Squadron) - Co-Founder and Head Bot Coach - Orlando '14, SCRIW '16
2017-: FRC 5402 (Iron Kings) - Mentor

94 events (more than will fit in a ChiefDelphi signature), 14 seasons, over 61,000 miles, and still on a mission from Bob.

Rule #1: Do not die. Rule #2: Be respectful. Rule #3: Be safe. Rule #4: Follow the handbook.

Last edited by Billfred : 08-06-2007 at 15:11.
  #2   Spotlight this post!  
Unread 08-06-2007, 14:47
kramarczyk's Avatar
kramarczyk kramarczyk is offline
is getting his kicks.
AKA: Mark Kramarczyk
FRC #3096 (Highlanders)
Team Role: Mentor
 
Join Date: Mar 2006
Rookie Year: 2006
Location: Sterling Heights, MI
Posts: 602
kramarczyk has a reputation beyond reputekramarczyk has a reputation beyond reputekramarczyk has a reputation beyond reputekramarczyk has a reputation beyond reputekramarczyk has a reputation beyond reputekramarczyk has a reputation beyond reputekramarczyk has a reputation beyond reputekramarczyk has a reputation beyond reputekramarczyk has a reputation beyond reputekramarczyk has a reputation beyond reputekramarczyk has a reputation beyond repute
Re: Design Period, THEN Build Period

Much as the design processes of individual companies varies, so does the design process of each team. Forcing teams to bracket time for various tasks removes the flexibility to optimize for the resources of YOUR team.

If my team wants to place more emphasis on design we could decide in Dec that we cut no metal until there is a drawing (of some kind). Perhaps we're not so good with the drawing end, but we can mock up in cardboard and plywood like lightning. Getting a simple bench level prototype done in week one may be the secret to this teams success.

If a team want's to design then build, great, do it. If you have a better way to git 'r done then, by all means, DO IT THAT WAY! Many teams have posted thier proven processes to jump off from.
__________________
Mark

Brick walls are for other people. - Randy Pausch
  #3   Spotlight this post!  
Unread 09-06-2007, 10:59
JohnBoucher JohnBoucher is offline
Blue Shirt
FRC #0237
 
Join Date: Jan 2004
Rookie Year: 2003
Location: Watertown, CT
Posts: 2,927
JohnBoucher has a reputation beyond reputeJohnBoucher has a reputation beyond reputeJohnBoucher has a reputation beyond reputeJohnBoucher has a reputation beyond reputeJohnBoucher has a reputation beyond reputeJohnBoucher has a reputation beyond reputeJohnBoucher has a reputation beyond reputeJohnBoucher has a reputation beyond reputeJohnBoucher has a reputation beyond reputeJohnBoucher has a reputation beyond reputeJohnBoucher has a reputation beyond repute
Re: Design Period, THEN Build Period

I owe everyone a clarification of my earlier post in this thread. I did not intend to suggest that the community as a whole disregards the constraints of the six weeks. I believe that the majority of our community stay within the six weeks and abide by the fix-it window rules.

If you read many of my posts, or are unfortunate enough to get trapped in a room with me, you will know that I am passionate about the magic of what happens to teams in the six weeks. To me, the six weeks can raise anyone involved to a higher appreciation of themselves. It does not matter if it is your first six weeks or your 10th. The process of the six weeks works magic on the mind.

The changes that I see in students over the six weeks never cease to amaze me. There is nothing else in our school system, including sports, that grips a student and changes their lives like FIRST Robotics and the six weeks. Too often, students are not challenged enough to attain personal growth. The six weeks does this.

The problem, as I see it, is the emphasis of a lot of teams is not with the process, but with winning the competitions. Why does FIRST constantly have to remind us at competitions to bring our gracious professionalism? IMHO it is because they realize that there is misplaced emphasis on winning.

I appreciate the need for competition. We need to validate the designs and execution of what we did in the six weeks. The competitions need to be fun, but go to any regional and you will see a few teams that are not having fun. I see students that get screamed at by their mentors. I see mentors screaming at mentors. Why? To me, this is the emphasis on winning. In conversations with some of these teams, they admit to doing what is necessary to win.

I appreciate the honor system. I know, as in the "real world", there are teams that do not. I feel bad for their students and sponsors. It is their loss.

John
Sorry that this sounded like a rant.
  #4   Spotlight this post!  
Unread 09-06-2007, 11:03
sanddrag sanddrag is offline
On to my 16th year in FRC
FRC #0696 (Circuit Breakers)
Team Role: Teacher
 
Join Date: Jul 2002
Rookie Year: 2002
Location: Glendale, CA
Posts: 8,516
sanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond repute
Re: Design Period, THEN Build Period

Personally, if they made the build season any longer I'd sure hope there is a nice pillowtop mattress in the KOP.
  #5   Spotlight this post!  
Unread 09-06-2007, 11:17
Joe Matt's Avatar
Joe Matt Joe Matt is offline
Wake Up Get Up Get Out There
no team
 
Join Date: Dec 2001
Rookie Year: 2001
Location: CAK
Posts: 5,067
Joe Matt has a reputation beyond reputeJoe Matt has a reputation beyond reputeJoe Matt has a reputation beyond reputeJoe Matt has a reputation beyond reputeJoe Matt has a reputation beyond reputeJoe Matt has a reputation beyond reputeJoe Matt has a reputation beyond reputeJoe Matt has a reputation beyond reputeJoe Matt has a reputation beyond reputeJoe Matt has a reputation beyond reputeJoe Matt has a reputation beyond repute
Re: Design Period, THEN Build Period

Quote:
Originally Posted by kramarczyk View Post
Much as the design processes of individual companies varies, so does the design process of each team. Forcing teams to bracket time for various tasks removes the flexibility to optimize for the resources of YOUR team.

If my team wants to place more emphasis on design we could decide in Dec that we cut no metal until there is a drawing (of some kind). Perhaps we're not so good with the drawing end, but we can mock up in cardboard and plywood like lightning. Getting a simple bench level prototype done in week one may be the secret to this teams success.

If a team want's to design then build, great, do it. If you have a better way to git 'r done then, by all means, DO IT THAT WAY! Many teams have posted thier proven processes to jump off from.
I fully agree. FIRST is about throwing a challange at you and letting you sink or swim. FIRST isn't about baby stepping you through the processes, showing you that you need to design first, then build. 6 weeks is not enough time. We all know that. That's why FIRST gives us 6 weeks. There are mentors and people there who have real work experiences with deadlines to show kids what to do. If you want a quick and easy brick on wheels, then you can design that in a day. If you want a complex machine, you can design that in a week, but remember, then you only have 5 more weeks to build. It's a trade off, just like life. From a learning standpoint, I can't see them releasing the KoP or game early.

There's a CHALLANGE in the 6 weeks. Giving us 4 extra weeks (with 2 at least during a major break) removes a significant amount of challange, and releaseing the manual and game early is simply unthinkable. From the fact FIRST needs to build the field to make sure it works, run through game scenarios, Dave needs to do the animation, etc. From a practicality standpoint I can't see them releasing the game early.

The ONLY time I can see them release something early would be the new controller that's coming around in '09.
__________________
  #6   Spotlight this post!  
Unread 09-06-2007, 12:01
Steve W Steve W is offline
Grow Up? Why?
no team
 
Join Date: Feb 2003
Rookie Year: 2002
Location: Toronto,Ontario Canada
Posts: 2,523
Steve W has a reputation beyond reputeSteve W has a reputation beyond reputeSteve W has a reputation beyond reputeSteve W has a reputation beyond reputeSteve W has a reputation beyond reputeSteve W has a reputation beyond reputeSteve W has a reputation beyond reputeSteve W has a reputation beyond reputeSteve W has a reputation beyond reputeSteve W has a reputation beyond reputeSteve W has a reputation beyond repute
Re: Design Period, THEN Build Period

This discussion of more than 6 weeks came up at our team forum in Toronto. I will say what I did then. NO MORE WEEKS in build season. Many of us (older people) have work as well as robotics. By the end of "Robotics season" we are tired, burnt out and behind at work. By robotics season I am speaking of January to mid April. Our team also meets during the rest of the season much less frequently. There is also VEX and LEGO League. We have community outreach and fund raising. On top of all that some of us are still married with children.
In our discussions we came to the conclusion that the only way we could lengthen the season is by going into Christmas time (basically December) which for most is a busy family time.
Right now there is a 6 week time frame and somehow most of FIRST completes their robot on time for ship. There is still tweaking to do but when isn't there. You could go to an event in November, say Ruckas, and you will still be trying to better for that event. What I am trying to say is that there will never be enough time for anyone as we are always trying to improve. What will happen though is that the better teams will have more time to put their multitude of resources to work to build even better robots. Teams that have poor time management skills will still have poor time management skills.

I will give one short example. Another mentor on our team and myself have decided to build a robot for the ECRG competition to be held in November of this year. So far we have met once and spent 2 hours thinking of ideas and a basic idea of what we want to do. I have even ordred a part that we will need for our testing. We decided to enter in mid April and here it is June with the only physical work done was taking apart last years VEX robot that I built. As of now there is no urgency so we put other priorities ahead of this one. I believe that this will happen with most teams even if we extend the season.

What can be done before January? Test, design, teach, inspire, fund raise, promote, recruit, community outreach, LEGO, Vex and the list goes on. We are not without important FIRST tasks when we are not building. FIRST is a "Life" changing experience. Why do we try and restrict it only to the 6 week build period?
__________________
We do not stop playing because we grow old;
we grow old because we stop playing.
  #7   Spotlight this post!  
Unread 09-06-2007, 12:46
DonRotolo's Avatar
DonRotolo DonRotolo is offline
Back to humble
FRC #0832
Team Role: Mentor
 
Join Date: Jan 2005
Rookie Year: 2005
Location: Atlanta GA
Posts: 7,011
DonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond repute
Re: Design Period, THEN Build Period

Steve makes a good point - 6 weeks definitely stretches the resources of us non-students, 8 weeks (contrary to my original post above) would make it worse.

The spoiler text in Billfred's post* has a good is a in there: a 5 week build season, prefaced by a 1 week design season.

It's been said before, FIRST isn't advanced shop class, witness the teams whose student design is implemented by professional machinists, perfectly within the rules AND spirit of FIRST. It's about the design, and the finer points of fabrication (i.e., making it work), not running a milling machine or band saw. **

Keeping at 6 weeks, but putting an bigger emphasis on the design process, might pay some good benefits. (Alternative: Give an award for a well-documented design - submitted in week 2!)

Don

* Not sure where that spoiler text is from, didn't see it in a previous post, so I assume Billfred wrote it but then hid it. OK. (cool BBcode feature I wasn't aware of, too!)

** Our team does let the students do the fabrication as well, even though us mentors would like to play with the tools instead I personally disagree with the professionally-built robots. But, this practice does not appear to interfere with the mission of FIRST, and so I really don't argue the point at all.
__________________

I am N2IRZ - What's your callsign?
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Robot Cool Down Period...? Mike Starke General Forum 27 19-03-2007 01:25
8 weeks build period!?! Ken Leung Rumor Mill 18 28-01-2003 21:14
Autonomous Period Andy Grady General Forum 73 20-01-2003 21:34
FIRST Build Period Karl General Forum 5 09-12-2001 13:30


All times are GMT -5. The time now is 07:16.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi